The matter is adjourned to 07.02.2024 at 03:30 PM.
HearingApproved And Ready For Certificate Issuing ProcessProceedings
Sh. Shashank Sharma, Associate Engineer Executive briefed about the facts of the project. Sh. Akhil Kumar (AR) and Sh. Sudhir Solanki (AR) are present on behalf of the promoter. The AR states that fire scheme was technically got approved at the time of approval of building plans and seeks three months’ time for submission final approved fire scheme from the competent authority along with approved service plans and estimates which have already been submitted and are under technical scrutiny of CE/HSVP. The Authority decides to grant Registration Certificate subject to submission of BG/DD amounting to Rs. 25 lakhs each for submission of approved SPE and fire NOC within three months failing which the above BG/DD is liable to be forfeited besides further legal action including revocation of RC and freezing of bank accounts. The RC shall be issued after submission of NEC from the revenue officer along with rectification of minor deficiencies as above.
Registration grantedGGM/785/517/2024/12
Certificate uploadedRC Uploaded
Registration valid till
Land, licence & cost
Land area of the project
5.433 acres
Total licensed area
5.433 acres
Licence
128 of 2022
FAR permissible / proposed
312 / 311.83
Estimated project cost
₹ 1,074.25 Cr
Cost of land
₹ 164.71 Cr
Cost of construction
₹ 540.95 Cr
Infrastructure and other structures
₹ 23.75 Cr
EDC, taxes, levies and other costs
₹ 344.84 Cr
How the land will be used
Use
Area (as filed)
Share
Land Area To Be Used For Construction Of Apartments
2,345.152
5%
Construction Of Roads
3,001.596
6.4%
Pavements
1,303.262
2.8%
Parks And Playgrounds
3,241.942
6.9%
Green Belts
949.641
2%
Vehicle Parkings
26,340.496
55.9%
Electricity Sub-Station
277.109
0.6%
Club House
1,318.715
2.8%
Sewage And Solid Waste Treatment Facility
292.533
0.6%
Area To Be Left For Transferring To The Government For Community Services
8,089.931
17.2%
Apartments 293 units · 4 towers
Type
Carpet area (sq m)
Carpet area (sq ft)
Units
Apartment/Shops/Other Buildings
63,359.76
-
248
Apartment/Shops/Other Buildings
833.39
8,971
44
Apartment/Shops/Other Buildings
97.06
1,045
1
Areas are as filed with HRERA. Some rows show a total built-up area rather than one home’s carpet area, as entered by the promoter.
External services
Service
Provided by
Approval taken
Roads
ALREADY CONNECTED WITH 24 MTR ROAD
Yes
Water Supply
GMDA
Yes
Electricity
DHBVN
Yes
Sewage Disposal
GMDA
Yes
Storm Water Drainage
GMDA
Yes
Facilities in the service plan
Facility
Estimated cost
Status
Internal Roads And Pavements
₹ 86 lakh
As Per Project Report
Water Supply System
₹ 70 lakh
As Per Project Report
Storm Water Drainage
₹ 80 lakh
As Per Project Report
Electricity Supply System
₹ 8.5 Cr
As Per Project Report
Sewage Treatment & Garbage Disposal
₹ 90 lakh
As Per Project Report
Street Lighting
₹ 10 lakh
As Per Project Report
Security And Fire Fighting
₹ 4 Cr
As Per Project Report
Playgrounds And Parks
₹ 15 lakh
As Per Project Report
Renewable Energy System
₹ 60 lakh
As Per Project Report
Any Other
₹ 2.44 Cr
As Per Project Report
Sub Station
₹ 4 Cr
As Per Project Report
Statutory approvals
Approval
Status
Date
Assurance For Sewerage Connection
Already Been Obtained
22 Aug 2023
Assurance For Supply Of 3.3 Kld Treated Water For Construction
Already Been Obtained
22 Aug 2023
Assurance For Electricity Supply
Already Been Obtained
14 Jun 2023
Assurance For Storm Water Connection
Already Been Obtained
13 Sep 2023
Assurance For Water Supply
Already Been Obtained
22 Sep 2023
Specifications (as filed)
Flooring Details Of Various Parts Of House
Tiles/Marbles/Granite/Laminated Wood
Wall Finishing Details
Obd/Semi-Acrylic/Acrylic Emulsion/Titles
Kitchen Details
Modular Kitchen With Appliances As Per Point 6.6 In Unit Wise Specification, Cabine Try And SS Sink
Bathroom Fittings
Cp Fitting, Wash Basin, Wc With Accessories
Doors And Windos Frames
Ms/Uvc/Al/Wood/Composite Material
Glass Work
Clear/Tinted/Coated/Frosted Glass As Per Point Number 13
Conducting And Wiring Details
Pvc Conduits, Fr Wiring
Cupboard Details
Modular Wardrobes In Bedrooms
Water Storage
Oht & Ugt Water Tanks
Lift Details
Branded Make
External Glazings
Upvc/Aluminum
Windows/Glazings
Upvc/Aluminum
Doors
Wooden Flush Door
Main Doors
Wooden Fire Resistant Flush Door
Internal Doors
Wooden Flush Door
Air Conditioning
Vrv/Vrf With High Wall Units In Living, Dinning, Bedrooms, Utility And Kitchen
Electrical Fittings
Switch Box And Sockets, Home Automation In Select Areas As Per Design
Cng Pipe Line
Png Gas Pipe Line Provision Only
Provision Of Wifi And Broadband Facility
Provision Only
External Finishing/Colour Scheme
Exterior Grade Paint
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about The Estate Residences?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.