The Estate Floors

by Anant Raj Limited · Anant Raj Estate, E- Block, Sec-63A, Gurugram

RERA registration
GGM/552/284/2022/27
Registered on
18 Apr 2022
Valid till
29 Sep 2025
Project ID
RERA-GRG-801-2021
Estimated cost
₹ 171.89 Cr

RERA registration

Registration certificateGGM/552/284/2022/27, dated 18 Apr 2022
Registration valid till29 Sep 2025
Project IDRERA-GRG-801-2021
AuthorityHRERA Gurugram
Project type (as filed)Ongoing
Project nameThe Estate Floors
PromoterAnant Raj Limited
Promoter’s registered officeCP01, Sec-8, Imt Manesar, Gurugram, Haryana 122051
CINL45400HR1985PLC021622
Site addressAnant Raj Estate, E- Block, Sec-63A, Gurugram
Tehsil / DistrictGurgaon / Gurugram
Layout plan approved7 Sep 2019
Building plans approved15 Jul 2013
Application submitted12 Jul 2021

Authority, hearings & orders

Current statusExtension Certificate Uploaded
Initial scrutiny1st deficiency notice sent on 20.07.2021
Next hearingNot Required
  1. Application submitted online
  2. Application received by HRERA Gurugram
  3. Notice sent to the promoter Deficiency Notice
  1. Hearing Examination By Authority
    Proceedings

    The matter got adjourned to 10.08.2021.

  2. Hearing Adjournment
    Proceedings

    Proceedings dated: 10.08.2021 Ms. Prachi Singh, Planning Executive briefed the facts of the case. Sh. Sudhir Solanki (GM) and Sh. Akhil Kumar (GM) are present on behalf of the promoter. An application regarding registration of residential floors project namely “The Estate Floors” situated at Pocket ‘E’, Anant Raj Estate, Sector-63A, Gurugram, Haryana being developed by M/s Anant Raj Limited was submitted on 13.07.2021 under section 4 of Real Estate (Regulation and Development), Act 2016. This application for registration is a part of the residential plotted colony which falls under license no. 119 of 2011 for area admeasuring 100.262 acres dated 28.11.2011 valid up to 27.12.2019 being issued in favour of M/s  Rose Realty Pvt. Ltd. and 12 others in collaboration with M/s Anant Raj Limited. The part completion certificate of the 65.1125 acres was granted vide memo no. LC-2543-JE(S)-2014/8878 dated 05.05.2014 by the DTCP, Haryana and project comprises of the 42 plots out of which occupation certificate for 28 plots has been issued by the DTP, Gurgaon on 29.12.2017, 31.07.2018, 27.11.2018, 28.11.2018, 11.01.2019, 27.03.2019, 08.07.2019, 15.02.2020 and 29.05.2020. On scrutiny of the application, some of the major deficiencies/observations were observed which were conveyed to the promoter vide notice no. HARERA/GGM/RPIN/351 dated 20.07.2021. Online corrections in REP-I (Part A-H) needs to be done. Corrections in detailed project information needs to be done. Latest copy of Jamabandi, Mutation, Akshjra duly certified by revenue officer six months prior to date of application needs to be submitted. Deficit Fee ₹7,57,698/- Copy of approval letter for layout cum demarcation plan and zoning plan need to be submitted.  Renewal of license no. 119 of 2011 dated 28.12.2011 need to be submitted. Copy of letter of Intent for license no. 104 of 2019 dated 07.09.2019 need to be submitted. Copy of LC-IV need to be submitted. Copy of collaboration agreement executed between M/s Anant Raj Limited and land owners need to be submitted. Project report and brochure of the projects needs to be revised. Information to Revenue department about the licensee area need to be submitted. Copy of non-encumbrance certificate certified by tehsildar of the Revenue department need to be submitted.   Copy of land title search report need to be certified by advocate on the latest date. Copy of REP-II is not submitted.  Renewed copy of Building plan BR-III of Plot nos. 07,08,27,28,29,30,31,32,33,34,35,36,42,44 and 45 need to be submitted. Copy of revised service plans and estimates of 110.20575 acres need to be provided. Copy of natural conservation zone NOC, tree cutting permission /NOC, forest land diversion and power line shifting NOC need to be submitted. Copies of approved roads and pavement plan, approved water supply plan, approved sewerage and garbage disposal plan, approved storm water drainage plan, approved parking plan need to be submitted. PERT Chart is not submitted. Approvals for sewage disposal from competent authority needs to be submitted. Details of inventory plot wise needs to be submitted. Copy of superimposed demarcation plan on approved layout plan on A1 sheet not submitted. The Legal documents related to allottees are not in the proper format. The same needs to be provided. Since the applicant is the collaborator in the license therefore the landowner must be made conforming party in the BBA. Observations- Part-E-Project Cost/sale Proceeds Cost of land needs to be clarified for area of registration i.e., 2.66 acres. Loan sanction letter, disbursement schedule, repayment schedule, Form CHG-1, CHG-9 needs to be submitted for all type of loan i.e., Term Loans, Working Capital Loans. Cost of conversion charges, License fees, EDC, IDC needs to be mentioned as per Letter of intent, an annexure should be submitted mentioning each license and its value. Supporting document for the interest cost needs to be submitted. Financial resources of the project need to be clarified. Escrow agreement with the bank needs to be provided. Part H-Bank account details Keeping in view the provisions of section 4 (2) (l) (D) of the Real Estate (Regulation & Development) Act, 2016, promoter needs to provide an affidavit duly signed by the authorised signatory and witness. Bank undertaking needs to be provided. Board resolution authorising to approve the bank account needs to be submitted. Part-I-Quarterly schedule of physical and financial progress CA Certificate for expenditure incurred up to the date of application needs to be provided. Statement of quarterly estimated expenditure needs to be corrected. Statement of quarterly estimated sources of fund needs to be corrected. Statement of net cash flow needs to be corrected. CA Certificate for financial and inventory details needs to be submitted. PART-II Project Proponent TAN no. of the company needs to be submitted. KYC of Ashim Sarin needs to be submitted. KYC of consultant needs to be submitted. Copy of aadhar of Mr Manoj Pahwa needs to be submitted. The Authority has directed the promoter to remove the deficiencies informed to them in 1st deficiency notice dated 20.07.2021. Further, the promoter has requested for 3 weeks’ time to comply the deficiencies. The authority has granted 3 weeks’ time and the matter is fixed for 14.09.2021 at 3:00 p.m. of in the office of the Authority.

  3. Hearing Objection
    Proceedings

    Proceedings dated: 14.09.2021 Ms. Prachi Singh, Planning Executive briefed the facts of the project. Sh. Akhil Kumar (GM) and Sh. Sudhir Solanki (GM) are present on behalf of the promoter. An application regarding registration of residential floors project namely “The Estate Floors” situated at Pocket ‘E’, Anant Raj Estate, Sector-63A, Gurugram, Haryana being developed by M/s Anant Raj Limited was submitted on 13.07.2021 under section 4 of Real Estate (Regulation and Development), Act 2016. This application for registration is a part of the residential plotted colony which falls under license no. 119 of 2011 for area admeasuring 100.262 acres dated 28.11.2011 valid up to 27.12.2019 being issued in favour of Rose Realty Pvt. Ltd. and 12 others   in collaboration with M/s Anant Raj Limited. The part completion certificate of the 65.1125 acres was granted vide memo no. LC-2543-JE(S)-2014/8878 dated 05.05.2014 by the DTCP, Haryana and project comprises of the 42 plots out of which occupation certificate for 28 plots has been issued by the DTP, Gurgaon on 29.12.2017, 31.07.2018, 27.11.2018, 28.11.2018, 11.01.2019, 27.03.2019, 08.07.2019, 15.02.2020 and 29.05.2020.                                On scrutiny of the application, some of the major deficiencies/observations were observed which were conveyed to the promoter vide notice no. HARERA/GGM/RPIN/351 dated 20.07.2021. The promoter requests for four weeks’ time to rectify all the deficiencies/observations conveyed vide above notice dated 20.07.2021. Further the promoter is directed to not make any further sale in respect of unsold 38 units failing which they shall be liable for penal action as per section 59 and section 63 of the Real Estate (Regulation and Development) Act., 2016.  The matter to come up on 12.10.2021.

  1. Hearing Objection
    Proceedings

    An application regarding registration of residential floors project namely “The Estate Floors” situated at Pocket ‘E’, Anant Raj Estate, Sector-63A, Gurugram, Haryana being developed by M/s Anant Raj Limited was submitted on 13.07.2021 under section 4 of Real Estate (Regulation and Development), Act 2016. This application for registration is a part of the residential plotted colony which falls under license no. 119 of 2011 for area admeasuring 100.262 acres dated 28.11.2011 valid up to 27.12.2019 being issued in favour of Rose Realty Pvt. Ltd. and 12 others   in collaboration with M/s Anant Raj Limited. The part completion certificate of the 65.1125 acres was granted vide memo no. LC-2543-JE(S)-2014/8878 dated 05.05.2014 by the DTCP, Haryana and project comprises of the 42 plots out of which occupation certificate for 28 plots has been issued by the DTP, Gurgaon on 29.12.2017, 31.07.2018, 27.11.2018, 28.11.2018, 11.01.2019, 27.03.2019, 08.07.2019, 15.02.2020 and 29.05.2020.                              On scrutiny of the application, some of the major deficiencies/observations were observed which were conveyed to the promoter vide notice no. HARERA/GGM/RPIN/351 dated 20.07.2021. 2021. The promoter has submitted the reply dated 10.08.2021 which was scrutinized still the following document is still pending which are mentioned below: -     Major Deficiencies/Observations 1.      Online corrections in REP-I (Part A-H) needs to be done. 2.      Corrections in detailed project information needs to be done. 3.      Deficit fee Rs. 7,57,698/- 4.      Latest copy of Jamabandi, Mutation, Akshjra duly certified by revenue officer six months prior to date of application needs to be submitted. 5.      Renewal of license no. 119 of 2011 dated 28.12.2011 need to be submitted. 6.      Project report and brochure of the projects needs to be revised. 7.      Copy of non-encumbrance certificate certified by tehsildar of the Revenue department need to be submitted.   8.      Copy of land title search report need to be certified by advocate on the latest date. 9.      Copy of REP-II is not submitted.  10.  Renewed copy of Building plan BR-III of Plot nos. 07,08,27,28,29,30,31,32,33,34,35,36,42,44 and 45 need to be submitted. 11.  Copy of revised service plans and estimates of 110.20575 acres need to be provided. 12.  Copy of natural conservation zone NOC, tree cutting permission /NOC, forest land diversion and power line shifting NOC need to be submitted. 13.  Details of inventory plot wise needs to be submitted. 14.  Copy of superimposed demarcation plan on approved layout plan on A1 sheet not submitted. 15.  The Legal documents related to allottees are not in the proper format. The same needs to be provided. 16.  Since the applicant is the collaborator in the license therefore the landowner must be made conforming party in the BBA. Observations- Part-E-Project Cost/sale Proceeds 17.  Cost of land needs to be clarified for area of registration i.e., 2.66 acres. 18.  Loan sanction letter, disbursement schedule, repayment schedule, Form CHG-1, CHG-9 needs to be submitted for all type of loan i.e., Term Loans, Working Capital Loans. 19.  Cost of conversion charges, License fees, EDC, IDC needs to be mentioned as per Letter of intent, an annexure should be submitted mentioning each license and its value. 20.  Supporting document for the interest cost needs to be submitted. 21.  Financial resources of the project need to be clarified. 22.  Escrow agreement with the bank needs to be provided. Part H-Bank account details 23.  Keeping in view the provisions of section 4 (2) (l) (D) of the Real Estate (Regulation & Development) Act, 2016, promoter needs to provide an affidavit duly signed by the authorised signatory and witness. 24.  Bank undertaking needs to be provided. 25.  Board resolution authorising to approve the bank account needs to be submitted. Part-I-Quarterly schedule of physical and financial progress 26.  CA Certificate for expenditure incurred up to the date of application needs to be provided. 27.  Statement of quarterly estimated expenditure needs to be corrected. 28.  Statement of quarterly estimated sources of fund needs to be corrected. 29.  Statement of net cash flow needs to be corrected. 30.  CA Certificate for financial and inventory details needs to be submitted. PART-II Project Proponent 31.  TAN no. of the company needs to be submitted. 32.  KYC of Ashim Sarin needs to be submitted. 33.  KYC of consultant needs to be submitted. 34.  Copy of aadhar of Mr Manoj Pahwa needs to be submitted.  The promoter has requested for adjournment for 15 days to arrange the balance documents. Therefore, the authority has decided to grant 15 days’ time to comply with the pending deficiencies by 26.10.2021.The matter to come up 09.11.2021 at 3:00 p.m. An application regarding registration of residential floors project namely “The Estate Floors” situated at Pocket ‘E’, Anant Raj Estate, Sector-63A, Gurugram, Haryana being developed by M/s Anant Raj Limited was submitted on 13.07.2021 under section 4 of Real Estate (Regulation and Development), Act 2016. This application for registration is a part of the residential plotted colony which falls under license no. 119 of 2011 for area admeasuring 100.262 acres dated 28.11.2011 valid up to 27.12.2019 being issued in favour of Rose Realty Pvt. Ltd. and 12 others   in collaboration with M/s Anant Raj Limited. The part completion certificate of the 65.1125 acres was granted vide memo no. LC-2543-JE(S)-2014/8878 dated 05.05.2014 by the DTCP, Haryana and project comprises of the 42 plots out of which occupation certificate for 28 plots has been issued by the DTP, Gurgaon on 29.12.2017, 31.07.2018, 27.11.2018, 28.11.2018, 11.01.2019, 27.03.2019, 08.07.2019, 15.02.2020 and 29.05.2020.                              On scrutiny of the application, some of the major deficiencies/observations were observed which were conveyed to the promoter vide notice no. HARERA/GGM/RPIN/351 dated 20.07.2021. 2021. The promoter has submitted the reply dated 10.08.2021 which was scrutinized still the following document is still pending which are mentioned below: -     Major Deficiencies/Observations 1.      Online corrections in REP-I (Part A-H) needs to be done. 2.      Corrections in detailed project information needs to be done. 3.      Deficit fee Rs. 7,57,698/- 4.      Latest copy of Jamabandi, Mutation, Akshjra duly certified by revenue officer six months prior to date of application needs to be submitted. 5.      Renewal of license no. 119 of 2011 dated 28.12.2011 need to be submitted. 6.      Project report and brochure of the projects needs to be revised. 7.      Copy of non-encumbrance certificate certified by tehsildar of the Revenue department need to be submitted.   8.      Copy of land title search report need to be certified by advocate on the latest date. 9.      Copy of REP-II is not submitted.  10.  Renewed copy of Building plan BR-III of Plot nos. 07,08,27,28,29,30,31,32,33,34,35,36,42,44 and 45 need to be submitted. 11.  Copy of revised service plans and estimates of 110.20575 acres need to be provided. 12.  Copy of natural conservation zone NOC, tree cutting permission /NOC, forest land diversion and power line shifting NOC need to be submitted. 13.  Details of inventory plot wise needs to be submitted. 14.  Copy of superimposed demarcation plan on approved layout plan on A1 sheet not submitted. 15.  The Legal documents related to allottees are not in the proper format. The same needs to be provided. 16.  Since the applicant is the collaborator in the license therefore the landowner must be made conforming party in the BBA. Observations- Part-E-Project Cost/sale Proceeds 17.  Cost of land needs to be clarified for area of registration i.e., 2.66 acres. 18.  Loan sanction letter, disbursement schedule, repayment schedule, Form CHG-1, CHG-9 needs to be submitted for all type of loan i.e., Term Loans, Working Capital Loans. 19.  Cost of conversion charges, License fees, EDC, IDC needs to be mentioned as per Letter of intent, an annexure should be submitted mentioning each license and its value. 20.  Supporting document for the interest cost needs to be submitted. 21.  Financial resources of the project need to be clarified. 22.  Escrow agreement with the bank needs to be provided. Part H-Bank account details 23.  Keeping in view the provisions of section 4 (2) (l) (D) of the Real Estate (Regulation & Development) Act, 2016, promoter needs to provide an affidavit duly signed by the authorised signatory and witness. 24.  Bank undertaking needs to be provided. 25.  Board resolution authorising to approve the bank account needs to be submitted. Part-I-Quarterly schedule of physical and financial progress 26.  CA Certificate for expenditure incurred up to the date of application needs to be provided. 27.  Statement of quarterly estimated expenditure needs to be corrected. 28.  Statement of quarterly estimated sources of fund needs to be corrected. 29.  Statement of net cash flow needs to be corrected. 30.  CA Certificate for financial and inventory details needs to be submitted. PART-II Project Proponent 31.  TAN no. of the company needs to be submitted. 32.  KYC of Ashim Sarin needs to be submitted. 33.  KYC of consultant needs to be submitted. 34.  Copy of aadhar of Mr Manoj Pahwa needs to be submitted.  The promoter has requested for adjournment for 15 days to arrange the balance documents. Therefore, the authority has decided to grant 15 days’ time to comply with the pending deficiencies by 26.10.2021.The matter to come up 09.11.2021 at 3:00 p.m.

  2. Hearing Adjournment
    Proceedings

    Proceedings dated: 09.11.2021 Ms. Prachi Singh, Planning Executive briefed the facts about the project. No one is present on behalf of the promoter. The promoter has requested for adjournment of hearing vide email dated 09.11.2021 requesting for 2 weeks for removing the balance deficiencies. Therefore, the authority has decided to grant 2 weeks’ time to fulfill the deficiencies and matter to come up on 07.12.2021. 

  3. Hearing Adjournment
    Proceedings

    The matter is adjourned for 14.12.2021

  1. Hearing Adjournment
    Proceedings

    No one is present on behalf of the promoter. The matter i s adjourned to 20.12.2021

  2. Hearing Adjournment
    Proceedings

    No one is present on behalf of the promoter. The matter is adjourned to 10.01.2022

  3. Hearing Adjournment
    Proceedings

    The Promoter has requested for the adjournment of a month vide letter dated 10.01.2022. The authority allows the same and the matter to come up on 14.02.2022. 

  1. Hearing Adjournment
    Proceedings

    Proceedings dated: 14.02.2022 Ms. Prachi Singh, Planning Executive briefed the facts about the project. Sh. Sudhir Solanki (GM) is present on behalf of the promoter. The AR of the promoter company has submitted a detailed reply today in the registry in response to the deficiencies conveyed in the hearing dated 14.01.2022, wherein the deficiencies have been removed including payment of deficit fees. The PE Ms. Prachi Singh apprises that the validity of building plans sanctioned for the plots applied for floor-wise construction stand expired and the promoter is required to submit revalidated building plans in respect of 40 no. of plots as the building plans are valid only of two plots. The AR of the promoter clarifies that out of 42 plots applied for registration of floor-wise construction and sale, the occupation certificate w.r.t. 32 plots has already been received and further the OC w.r.t. 8 plots stand applied and hence their revalidated plans are not required at this stage as the building plans are still valid w.r.t. two no. of unconstructed plots. The proof having submitted their application for OC shall also be submitted. The reply submitted by the AR with annexures be examined by the concerned PE and to put up during next hearing. The matter to come up on 07.03.2022.

  2. Hearing Adjournment
    Proceedings

    Ms. Prachi Singh, Planning Executive briefed the facts about the project. Sh. Sudhir Solanki (AR) is present on behalf of the promoter. The promoter has requested for adjournment of hearing requesting for 2 weeks for removing the balance deficiencies. Therefore, the authority has decided to grant 2 weeks’ time to fulfill the deficiencies and matter to come up on 28.03.2022. 

  3. Hearing Adjournment
    Proceedings

    The matter is adjourned to 31.03.2022

  1. Hearing Adjournment
    Proceedings

    The matter is adjourned to 02.04.2022

  2. Hearing Adjournment
    Proceedings

    Proceedings dated: 02.04.2022Ms. Prachi Singh, Planning Executive briefed about the facts of the project.Sh. Sudhir Solanki is present on behalf of the promoter who requests for 2 weeks’ time to submit deficitfee and CA deficiencies. The Authority has granted the same.The matter to come up on 18.04.2022.

  3. Hearing Approved And Ready For Certificate Issuing Process
    Proceedings

    Proceedings dated: 18.04.2022Ms. Prachi Singh, Planning Executive briefed about the facts of the project.Sh. Sudhir Solanki (GM) is present on behalf of the promoter. Keeping in view the deficiencies rectifiedby the promoter the Authority decided to grant registration subject to correction in online DPI andsubmission of hard copy thereof.

  1. Registration granted GGM/552/284/2022/27
  2. Registration valid till

Land, licence & cost

LicenceLicence no.119 of 2011
FAR permissible / proposed180 / 153
Estimated project cost₹ 171.89 Cr
Cost of land₹ 20.26 Cr
Cost of construction₹ 83.28 Cr
Infrastructure and other structures₹ 1.04 Cr
EDC, taxes, levies and other costs₹ 67.31 Cr

How the land will be used

UseArea (as filed)Share
Land Area To Be Used For Construction Of Apartments10,789.31100%

External services

ServiceProvided byApproval taken
RoadsHUDAYes
Water SupplyHUDAYes
ElectricityDHBVNYes
Sewage DisposalHUDAYes
Storm Water DrainageHUDAYes

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 52 lakhSubmitted To Town & Country Planning
Water Supply System₹ 20.6 lakhSubmitted To Town & Country Planning
Storm Water Drainage₹ 11.3 lakhSubmitted To Town & Country Planning
Sewage Treatment & Garbage Disposal₹ 12.2 lakhSubmitted To Town & Country Planning
Street Lighting₹ 7.6 lakhSubmitted To Town & Country Planning
Playgrounds And Parks₹ 0.69 lakhSubmitted To Town & Country Planning

Statutory approvals

ApprovalStatusDate
Building PlansAlready Been Obtained15 Jul 2013
Environmental ClearanceAlready Been Obtained11 May 2021
Electricity Load Approval (License No. 119 Of 2011)Already Been Obtained28 Dec 2011

Specifications (as filed)

Flooring Details Of Various Parts Of HouseEntry Lobby/Living/Dining Room/Other Common Area - Italian Marble (400 Sq Yds) / Marble Flooring (270 Sq Yds), Master Bedroom – Laminated Wooden Flooring, Other Bedrooms – Vitrified Tiles, Balcony – Anti Skid Tiles, Servant Room – Ceramic Tiles
Wall Finishing DetailsEntry Lobby/Living/Dining Room/Other Common Area , Bedrooms – Plastic Emulsion Paint, Balcony – Weather Proof Paint, Kitchen – Tiles Upto 2’ Above Counter, Toilets – Ceramic Tiles, Servant Room – Obd
Kitchen DetailsModular Kitchen With Hob, Chimney & Cp Fittings, Stainless Steel
Bathroom FittingsFixtures European Faucets, Wc’S & Wash Basin.
Doors And Windos FramesEntrance Door – Teak Veneered & Polished Shutter With Seasoned Hardwood Frames, Window – Upvc (400 Sq Yds) / Aluminium (270 Sq Yds)
Electric FittingsPower Point Tv & Phone Sockets With Protective Mcb’S, Modular Switches, Fans In All Bedrooms, Living & Dining, Exhaust In All Toilets & Kitchen (270 Sq Yds), Modular Switches, Data & Voice Connections Hard Wired With Multiple Service Providers, Video Or Audio Door Phone (400 Sq Yds)
Conducting And Wiring DetailsCopper Electrical Wiring (270 Sq Yds)Copper Conductor Wiring ( 400 Sq Yds)
Water StorageOverhead & Underground Water Tanks
Lift Details6 Passenger Equipped With Ard (400 Sq Yds), 4 Passenger Equipped With Ard (270 Sq Yds), Lift Shaft & Machine Room On The Terrace
External GlazingsFacade – Combination Of Textured & Weather Proof Paints & Permanent Finishing
Windows/GlazingsUpvc (400 Sq Yds) & Aluminium (270 Sq Yds)
Main DoorsTeak Veneered & Polished Shutter With Seasoned Hardwood Frames
Internal DoorsTeak Veneered & Polished Shutter With Seasoned Hardwood Frames
Air ConditioningVrv Air Conditioning
Electrical FittingsPower Point Tv & Phone Sockets With Protective Mcb’S, Modular Switches, Fans In All Bedrooms, Living & Dining, Exhaust In All Toilets & Kitchen (270 Sq Yds), Modular Switches, Data & Voice Connections Hard Wired With Multiple Service Providers, Video Or Audio Door Phone (400 Sq Yds), Electricity Panel/ Board, Electricity & Plumbing Shafts In Common Areas
External Finishing/Colour SchemeCombination Of Textured & Weather Proof Paints & Permanent Finishing

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about The Estate Floors?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.