by Sobha Limited · Sector 63A, Village Behrampur, Gurugram Manesar Urban Complex
RERA registration
Applied, not granted yet
Applied on
18 Feb 2026
Application status
In process
Project ID
RERA-GRG-2174-2026
Land area
4.96 acres
Apartments
336 in 2 towers
Completion (as filed)
31 Mar 2033
Estimated cost
₹ 2,158.98 Cr
This project has applied for RERA registration but has not been granted it yet. Under RERA it cannot be advertised, marketed or sold until it is registered.
RERA registration
Registration certificate
Not issued yet: the application is being processed by HRERA Gurugram
Sector 63A, Village Behrampur, Gurugram Manesar Urban Complex
Sector
Sector 63A
Tehsil / District
Wazirabad St / Gurugram
Construction start (as filed)
1 Oct 2026
Completion (as filed)
31 Mar 2033
Application submitted
18 Feb 2026
Authority, hearings & orders
Current statusStatus not given
Next hearingNot Required
Application submitted online
Land, licence & cost
Land area of the project
4.96 acres
Total licensed area
11.997 acres
Licence
57 of 2025 dated 17.04.2025
FAR permissible / proposed
3.5 / 2.7
Estimated project cost
₹ 2,158.98 Cr
Cost of land
₹ 1,072.18 Cr
Cost of construction
₹ 403.48 Cr
Infrastructure and other structures
₹ 220.96 Cr
EDC, taxes, levies and other costs
₹ 462.36 Cr
How the land will be used
Use
Sq m
Share
Land Area To Be Used For Construction Of Apartments
2,013.105
10%
Parks And Playgrounds
6,479.252
32.3%
Any Other
9,198.053
45.8%
Construction Of Circulation Road
2,382
11.9%
Apartments 336 units · 2 towers
Type
Carpet area (sq m)
Carpet area (sq ft)
Units
Apartment/Shops/Other Buildings
157.36
1,694
85
Apartment/Shops/Other Buildings
141.17
1,520
121
Apartment/Shops/Other Buildings
118.01
1,270
116
Apartment/Shops/Other Buildings
138.85
1,495
1
Apartment/Shops/Other Buildings
123.30
1,327
6
Apartment/Shops/Other Buildings
100.24
1,079
7
Areas are as filed with HRERA.
External services
Service
Provided by
Approval taken
Roads
Yes
WATER SUPPLY
GMDA
Yes
ELECTRICITY
DHBVN
Yes
SEWAGE DISPOSAL
GMDA
Yes
STORM WATER DRAINAGE
GMDA
Yes
4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
0.00
AS PER PROJECT REPORT
2
Water Supply System
1219.00
AS PER PROJECT REPORT
3
STORM WATER DRAINAGE
51.00
As Per Project Report
4
ELECTRICITY SUPPLY SYSTEM
3188.00
AS PER PROJECT REPORT
5
Sewage Treatment & Garbage Disposal
677.00
AS PER PROJECT REPORT
6
STREET LIGHTING
200.00
As Per Project Report
7
SECURITY AND FIRE FIGHTING
0.00
AS PER PROJECT REPORT
8
Playgrounds And Parks
30.00
AS PER PROJECT REPORT
9
CLUB HOUSE/COMMUNITY CENTRE
0.00
As Per Project Report
10
SHOPPING AREA
0.00
AS PER PROJECT REPORT
11
Renewable Energy System
94.00
AS PER PROJECT REPORT
12
SCHOOL
0.00
As Per Project Report
13
HOSPITAL/DISPENSARY
0.00
AS PER PROJECT REPORT
14
Any Other
10468.00
AS PER PROJECT REPORT
15
PARKING
522.00
As Per Project Report
16
STP
326.00
AS PER PROJECT REPORT
17
Underground Water Tank
389.00
AS PER PROJECT REPORT
18
RAIN WATER HARVESTING
125.00
As Per Project Report
19
ELECTRIC SUB STATION
283.00
AS PER PROJECT REPORT
20
Fire And Hvac And Ac For Apartments
4524.00
AS PER PROJECT REPORT
5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.
NA
(date)
6. Date of approval of Building Plans
NA
(date)
7. New projects:
i) Likely date of starting the construction work
01-10-2026
ii) Likely date of completing the project
31-03-2033
iii) Sizes of the plots to be offered in the project
Sr. No
Plot Area(In Square Meter)
Number of plots in the project
1
0
0
Total
0
iv. Type of apartments to be constructed in the project:
Type
Carpet area(In Square Meter)
Number of apartments
Number of towers
Apartment/Shops/Other Buildings
157.36
85
2
Apartment/Shops/Other Buildings
141.17
121
2
Apartment/Shops/Other Buildings
118.01
116
2
Apartment/Shops/Other Buildings
138.85
1
2
Apartment/Shops/Other Buildings
123.30
6
2
Apartment/Shops/Other Buildings
100.24
7
2
(vi) Quarterly schedule of development of whole/remaining part of the project:
(c) Apartments/Shops/Other Buildings
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2031
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
3276.44
1925.60
1925.60
1925.60
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2032
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
1925.60
1925.60
1925.60
1926.61
Shops
0
0
0
0
Plots
0
0
0
0
(d) Infrastructure
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
0
Water Supply System
55.34
55.34
55.34
55.34
Sewerage treatment & garbage disposal
42.31
42.31
42.31
42.31
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
475.25
475.25
475.25
475.25
Parking
23.70
23.70
23.70
23.70
STP
54.31
54.31
54.31
54.31
Rain water harvesting
20.83
20.83
20.83
20.83
Underground water tank
64.81
64.81
64.81
64.81
Particulars
Year-2028
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
0
Water Supply System
55.34
55.34
55.34
55.34
Sewerage treatment & garbage disposal
42.31
42.31
42.31
42.31
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
475.25
475.25
475.25
475.25
STP
54.31
54.44
Parking
23.70
23.70
23.70
23.70
Underground water tank
64.81
64.96
Rain water harvesting
20.83
20.88
Particulars
Year-2029
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
0
Water Supply System
55.34
55.34
55.34
55.34
Sewerage treatment & garbage disposal
42.31
42.31
42.31
42.31
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
475.25
475.25
475.25
475.25
Parking
23.70
23.70
23.70
23.70
Particulars
Year-2031
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
Water Supply System
55.34
55.34
55.34
Sewerage treatment & garbage disposal
0
0
0
Electricity Supply System
398.50
398.50
398.50
Storm Water Drainage
8.50
8.50
8.50
Parks and Playgrounds
0
7.50
7.50
Clubhouse/community centres
0
0
0
Shopping area
0
0
0
Other
475.25
475.25
475.25
Parking
23.70
23.70
23.70
Street Lighting
33.32
33.32
33.32
Fire and HVAC and AC for Apartments
565.50
565.50
565.50
Electrical sub station
47.15
47.15
47.15
Particulars
Year-2032
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
0
Water Supply System
55.34
56.81
0
0
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
398.50
398.50
0
0
Storm Water Drainage
8.50
8.52
0
0
Parks and Playgrounds
7.50
7.50
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
475.25
487.81
0
0
Fire and HVAC and AC for Apartments
565.50
565.50
Street Lighting
33.32
33.40
Parking
23.70
24.33
23.50
Electrical sub station
47.15
47.26
Particulars
Year-2033
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
0
Water Supply System
0
0
0
0
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Renewable energy system
23.50
23.50
It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
Form Rep-I
Part - D
Accounts related information:
1. Annex copy of the balance sheet of last 3 years
No
2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.
Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.
No
3. Bank account to which the deposits received from apartment buyers will be credited
Bank and Branch address
IDBI BANK LTD., SHOP NO. 6-7, VIPUL SQUARE, SUSHANT LOK PHASE-1, B-BLOCK, GURUGRAM ? 122002, HARYANA
Bank Account number
0171102000019673
IFSC code
IBKL0000171
MICR code
110259013
Branch code
171
4. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)
Shilpa Malik, H. N0 1742b/3 Frist Floor Street no 7, Near Nokia Care On Old Delhi Road Rajiv Nagar Gurgaon
5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)
Yes
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
FORM REP-I
Part - E
Details of the statutory approvals:
1. Annex copies of the following in Folder E:
i. Lay out Plan
No
ii. Demarcation Plan
Yes
iii. Zoning Plan
Yes
iv. Building Plan
Yes
Site Plan
Yes
Floor Plan
Yes
Apartment Plans
Yes
Elevation Section
Yes
Detail of Permissible FAR
Yes
Detail of covered area achieved FAR
Yes
2. Annex copies of the following in Folder E:
I. ROADS AND PAVEMENT PLAN
Yes
II. ELECTRICITY SUPPLY PLAN
Yes
III. Water Supply Plan
Yes
IV. SEWERAGE AND GARBAGE DISPOSAL PLAN
Yes
V. STROM WATER DRAINAGE
Yes
Vi. 10% Land To Be Transferred To The Govt. For Community Facility
Yes
VII. STREET LIGHTING PLAN
Yes
VIII. PARKING PLAN
Yes
3. Statutory Approvals Status
Statutory Approvals
Statutory Approvals Status
Date
I. LC V
ALREADY BEEN OBTAINED
17-04-2025
II. DEMARCATION CUM ZONING
ALREADY BEEN OBTAINED
14-11-2025
III. AIRPORT HEIGHT CLEARANCE
ALREADY BEEN OBTAINED
30-05-2024
IV. ENVIRONMENT CLEARANCE
ALREADY BEEN OBTAINED
06-11-2025
V. FOREST NOC
ALREADY BEEN OBTAINED
11-08-2025
It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees.
Signature _____________
Seal _____________
Date _____________
FORM REP-I
Part - F
1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.
(Annex a copy in Folder F)
Yes
2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)
(Annex a copy in Folder F)
Yes
3. Gist of the important provisions of the Draft Agreement
(Annex a copy in Folder F)
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
FORM REP-I
Part - G
Projects launched by the promoter in last five years:
1. Name and location of the project
Sobha Aranya Phase-1, Sector 80, Gurugram
2. Particulars of the project in brief:
i. Total area of the project
14.81747
ii. Total number of apartments
524
iii. Total number of plots
0
3. The number of plots/ apartments booked/sold to the allottees:
(a) Apartments
178
(b) Plots
0
4. Details of the expenditure incurred upto date:
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
397591.39
397591.39
42202.03
Cost of the apartments
119411.63
119411.63
6171.19
Cost of the infrastructure
1863.83
1863.83
0.00
Others costs
276315.93
276315.93
36030.84
5. Total amount of money collected from current allottees of the apartments/ plots upto the date of filing this application.
45068.87209 Lakhs
6. Remaining amount of sale price money to be collected from the current allottees of the apartments.
119426.27156 Lakhs
7. Loan sanctioned by the banks/ other financial institutions against the project.
0.00 Lakhs
8. Amount drawn from the banks/ other financial institutions till the date of filing this application.
0.00 Lakhs
9. Whether any litigation is pending against the Project:
Yes/No
(If yes-give Annex details in folder G)
No
10. Initial date of completion of the project.
31-10-2030
11. Likely date of completion of the project.
31-10-2030
1. Name and location of the project
Sobha Altus, Sector 106, Gurugram
2. Particulars of the project in brief:
i. Total area of the project
5.5100
ii. Total number of apartments
296
iii. Total number of plots
0
3. The number of plots/ apartments booked/sold to the allottees:
(a) Apartments
105
(b) Plots
0
4. Details of the expenditure incurred upto date:
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
207352.61
207352.61
10778.44
Cost of the apartments
52148.49
52148.49
2808.26
Cost of the infrastructure
882.35
882.35
0
Others costs
154321.77
154321.77
7970.18
5. Total amount of money collected from current allottees of the apartments/ plots upto the date of filing this application.
7535.86014 Lakhs
6. Remaining amount of sale price money to be collected from the current allottees of the apartments.
22560.82238 Lakhs
7. Loan sanctioned by the banks/ other financial institutions against the project.
0.00 Lakhs
8. Amount drawn from the banks/ other financial institutions till the date of filing this application.
0.00 Lakhs
9. Whether any litigation is pending against the Project:
Yes/No
(If yes-give Annex details in folder G)
No
10. Initial date of completion of the project.
31-12-2031
11. Likely date of completion of the project.
31-12-2031
1. Name and location of the project
Sobha City, Phase-6, Sector 108, Gurgaon
2. Particulars of the project in brief:
i. Total area of the project
16.3995
ii. Total number of apartments
396
iii. Total number of plots
0
3. The number of plots/ apartments booked/sold to the allottees:
(a) Apartments
385
(b) Plots
0
4. Details of the expenditure incurred upto date:
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
95990.01
95990.01
64295.59
Cost of the apartments
42657
42657
17944
Cost of the infrastructure
719
719
205
Others costs
52614.01
52614.01
46146.59
5. Total amount of money collected from current allottees of the apartments/ plots upto the date of filing this application.
112273.81213 Lakhs
6. Remaining amount of sale price money to be collected from the current allottees of the apartments.
39748.42638 Lakhs
7. Loan sanctioned by the banks/ other financial institutions against the project.
0.00 Lakhs
8. Amount drawn from the banks/ other financial institutions till the date of filing this application.
0.00 Lakhs
9. Whether any litigation is pending against the Project:
Yes/No
(If yes-give Annex details in folder G)
No
10. Initial date of completion of the project.
31-12-2028
11. Likely date of completion of the project.
31-12-2028
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
Form Rep-I
Part - H
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1
FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
Superior Quality Vitrified Tile/ Ceramic Nitrified
2
WALL FINISHING DETAILS
Plastic Emulsion Paint
3
KITCHEN DETAILS
Superior Quality Ceramic Tile /Plastic Emulsion
4
BATHROOM FITTINGS
Pnc/Equivalent
5
WOOD WORK ETC
Doors
6
DOORS AND WINDOS FRAMES
Both Side Masonite Skin Doors And Aluminium/Upvc/Glass Windows
7
GLASS WORK
Hardend Glass
8
ELECTRIC FITTINGS
Clipsal-Opale/Equivalent
9
CONDUCTING AND WIRING DETAILS
Havells, Cobra,Salzer, Polycab, Lapp/Equivalent
10
CUPBOARD DETAILS
N/A
11
WATER STORAGE
N/A
12
LIFT DETAILS
7 Lift Per Floor
13
EXTERNAL GLAZINGS
Exterior Paint
13.1
WINDOWS/GLAZINGS
Heavy-Duty Aluminum Glazed Liding Windows
14
DOORS
Both Side Masonite Skin
14.1
MAIN DOORS
Both Side Masonite Skin
14.2
INTERNAL DOORS
Both Side Masonite Skin
15
AIR CONDITIONING
N/A
16
ELECTRICAL FITTINGS
Clipsal-Opale/Equivalent
17
CNG PIPE LINE
N/A
18
PROVISION OF WIFI AND BROADBAND FACILITY
N/A
19
EXTERNAL FINISHING/COLOUR SCHEME
Exterior Paint
20
INTERNAL FINISHING
Plastic
EMULSION
SPECIFICATION UNIT WISE
1 . Living/Dining/Foyer/Family Lounge
1 . 1
FLOOR
Superior Quality Vitrified Tile
1 . 2
WALLS
Plastic Emulsion
1 . 3
CEILING
Plastic Emulsion
2 . MASTER BEDROOM/DRESSROOM
2 . 1
Floor
SUPERIOR QUALITY VITRIFIED TILE
2 . 2
Walls
PLASTIC EMULSION
2 . 3
Ceiling
PLASTIC EMULSION
2 . 4
Modular Wardrobes
N/A
3 . MASTER TOILET
3 . 1
FLOOR
CERAMIC NITRIFIED
3 . 2
WALLS
CERAMIC NITRIFIED
3 . 3
CEILING
PLASTIC EMULSION
3 . 4
COUNTERS
WHITE COUNTERTOP BASIN
3 . 5
SANITARY WARE/CP FITTINGS
FIITINGS
3 . 6
FITTING/FIXTURES
FIITINGS
4 . Bed Rooms
4 . 1
FLOOR
Superior Quality Vitrified Tile
4 . 2
WALLS
Plastic Emulsion
4 . 3
CEILING
Plastic Emulsion
4 . 4
WARDROBES
N/A
5 . TOILET
5 . 1
Floor
SUPERIOR QUALITY CERAMIC TILE
5 . 2
Walls
SUPERIOR QUALITY CERAMIC TILE
5 . 3
Ceiling
CALCIUM SILICATE
5 . 4
Counters
WHITE COUNTERTOP BASIN
5 . 5
Sanitary Ware/Cp Fittings
FITTINGS
5 . 6
Fixtures
FITTINGS
6 . KITCHEN
6 . 1
FLOOR
SUPERIOR QUALITY VITRIFIED TILE
6 . 2
WALLS
SUPERIOR QUALITY CERAMIC TILE /PLASTIC EMULSION
6 . 3
CEILING
PLASTIC EMULSION
6 . 4
COUNTERS
N/A
6 . 5
FIXTURES
FIXTURES
6 . 6
KITCHEN APPLIANCES
N/A
7 . Utility Rooms/Utility Balcony/Toilet
7 . 1
FLOOR
Superior Quality Ceramic Tile
7 . 2
WALLS & CEILING
Plastic Emulsion
7 . 3
TOILET
N/A
7 . 4
BALCONY
Available
8 . SIT-OUTS
8 . 1
Floor
N/A
8 . 2
Walls & Ceiling
N/A
8 . 3
Railings
N/A
8 . 4
Fixtures
N/A
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
List of Uploaded Documents
Sr. No.
Document Description
Date of Document Upload
View Document
1
NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT
16-02-2026
View Document
2
DEMARCATION PLAN
10-02-2026
View Document
3
Zoning Plan
10-02-2026
View Document
4
IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN
16-02-2026
View Document
5
DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.
16-02-2026
View Document
6
Copy Of License Along With Schedule Of Land
16-02-2026
View Document
7
IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN
16-02-2026
View Document
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
Facilities in the service plan
Facility
Estimated cost
Status
Water Supply System
₹ 12.19 Cr
As Per Project Report
Storm Water Drainage
₹ 51 lakh
As Per Project Report
Electricity Supply System
₹ 31.88 Cr
As Per Project Report
Sewage Treatment & Garbage Disposal
₹ 6.77 Cr
As Per Project Report
Street Lighting
₹ 2 Cr
As Per Project Report
Playgrounds And Parks
₹ 30 lakh
As Per Project Report
Renewable Energy System
₹ 94 lakh
As Per Project Report
Any Other
₹ 104.68 Cr
As Per Project Report
Parking
₹ 5.22 Cr
As Per Project Report
Stp
₹ 3.26 Cr
As Per Project Report
Underground Water Tank
₹ 3.89 Cr
As Per Project Report
Rain Water Harvesting
₹ 1.25 Cr
As Per Project Report
Electric Sub Station
₹ 2.83 Cr
As Per Project Report
Fire And Hvac And Ac For Apartments
₹ 45.24 Cr
As Per Project Report
Statutory approvals
Approval
Status
Date
Lc V
Already Been Obtained
17 Apr 2025
Demarcation Cum Zoning
Already Been Obtained
14 Nov 2025
Airport Height Clearance
Already Been Obtained
30 May 2024
Environment Clearance
Already Been Obtained
6 Nov 2025
Forest Noc
Already Been Obtained
11 Aug 2025
Specifications (as filed)
Flooring Details Of Various Parts Of House
Superior Quality Vitrified Tile/ Ceramic Nitrified
Wall Finishing Details
Plastic Emulsion Paint
Kitchen Details
Superior Quality Ceramic Tile /Plastic Emulsion
Bathroom Fittings
Pnc/Equivalent
Wood Work Etc
Doors
Doors And Windos Frames
Both Side Masonite Skin Doors And Aluminium/Upvc/Glass Windows
Glass Work
Hardend Glass
Electric Fittings
Clipsal-Opale/Equivalent
Conducting And Wiring Details
Havells, Cobra,Salzer, Polycab, Lapp/Equivalent
Cupboard Details
N/A
Water Storage
N/A
Lift Details
7 Lift Per Floor
External Glazings
Exterior Paint
Windows/Glazings
Heavy-Duty Aluminum Glazed Liding Windows
Doors
Both Side Masonite Skin
Main Doors
Both Side Masonite Skin
Internal Doors
Both Side Masonite Skin
Air Conditioning
N/A
Electrical Fittings
Clipsal-Opale/Equivalent
Cng Pipe Line
N/A
Provision Of Wifi And Broadband Facility
N/A
External Finishing/Colour Scheme
Exterior Paint
Internal Finishing
Plastic
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Sobha Crescent Phase - 1?
This project has applied for RERA but is not registered yet. An advisor can tell you what that means for booking, and suggest registered alternatives nearby. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.