Building plans approved
10 Oct 2024
Construction start (as filed)
1 Jan 2026
Completion (as filed)
30 Dec 2032
Application submitted
15 Oct 2024
Authority, hearings & orders
Current statusApproved And Certificate Uploaded
Initial scrutinyFirst hearing
Next hearingNot Required
Application submitted online
HearingExamination By AuthorityProceedings
The matter is adjourned and to come up on 02.12.2024.
HearingAdjournmentProceedings
Ms. Nikita Mittal, Planning Executive and Sh. Ashish Dubey, Chartered Accountant briefed about the facts of the case. Sh. Suneet Puri (AR) and Sh. Ajay Kumar (AR) are present on behalf of the promoter. The AR seeks one week time to submit deficit documents. Request is allowed. The matter to come up on 09.12.2024.
HearingApproved And Ready For Certificate Issuing ProcessView order Proceedings
Ms. Nikita Mittal, Planning Executive and Sh. Ashish Dubey, Chartered Accountant briefed about the facts of the case. Sh. Suneet Puri (AR) and Sh. Ajay Kumar (AR) are present on behalf of the promoter. Approved as proposed subject to submission of BG/DD of Rs. 25 lakh each in lieu of submission of approved EC and fire clearance and removal of other deficiencies. The registration certificate shall be issued after removal of remaining deficiencies.
Registration grantedGGM/893/625/2024/120
Certificate uploadedRC Uploaded
Registration valid till
Land, licence & cost
Land area of the project
3.426 acres
Total licensed area
3.426 acres
Licence
Plot No. GH-1 vide Memo No. ZO002/EO018/UE029/GALOT/0000001411 dated 21.12.2023 Allotted by the HSVP and Conveyance Deed was executed on dated 16.09.2024, Vasika No. 12040.
FAR permissible / proposed
3.62 / 3.61
Estimated project cost
₹ 1,055.65 Cr
Cost of land
₹ 345.08 Cr
Cost of construction
₹ 534.9 Cr
Infrastructure and other structures
₹ 133.73 Cr
EDC, taxes, levies and other costs
₹ 41.95 Cr
How the land will be used
Use
Acres
Share
Land Area To Be Used For Construction Of Apartments
0.82
23.9%
Construction Of Roads
0.86
25.1%
Pavements
1.13
33%
Green Belts
0.52
15.2%
Electricity Sub-Station
0.06
1.8%
Sewage And Solid Waste Treatment Facility
0.036
1.1%
Apartments 113 units · 1 tower
Type
Carpet area (sq m)
Carpet area (sq ft)
Units
Apartment/Shops/Other Buildings
390.55
4,204
22
Apartment/Shops/Other Buildings
287.83
3,098
44
Apartment/Shops/Other Buildings
287.83
3,098
44
Apartment/Shops/Other Buildings
14.43
155
1
Apartment/Shops/Other Buildings
15.42
166
1
Apartment/Shops/Other Buildings
14.76
159
1
Areas are as filed with HRERA.
External services
Service
Provided by
Approval taken
Roads
ALREADY CONNECTED
Yes
Water Supply
GMDA
Yes
Electricity
DHBVN
Yes
Sewage Disposal
GMDA
Yes
Storm Water Drainage
GMDA
Yes
Facilities in the service plan
Facility
Estimated cost
Status
Internal Roads And Pavements
₹ 2.25 Cr
As Per Project Report
Water Supply System
₹ 2.33 Cr
As Per Project Report
Storm Water Drainage
₹ 2.32 Cr
As Per Project Report
Electricity Supply System
₹ 3.33 Cr
As Per Project Report
Sewage Treatment & Garbage Disposal
₹ 3.55 Cr
As Per Project Report
Street Lighting
₹ 1.84 Cr
As Per Project Report
Security And Fire Fighting
₹ 11.23 Cr
As Per Project Report
Playgrounds And Parks
₹ 12.31 Cr
As Per Project Report
Club House/Community Centre
₹ 84.22 Cr
As Per Project Report
Shopping Area
₹ 64 lakh
As Per Project Report
Renewable Energy System
₹ 1.49 Cr
As Per Project Report
Stp
₹ 2.97 Cr
As Per Project Report
Underground Water Tank
₹ 1.44 Cr
As Per Project Report
Rain Water Harvesting
₹ 44.61 lakh
As Per Project Report
Electrical Sub Station
₹ 3.35 Cr
As Per Project Report
Statutory approvals
Approval
Status
Date
Building Plan
Already Been Obtained
10 Oct 2024
Aai
Already Been Obtained
14 Aug 2023
Assurance Of Water Supply
Already Been Obtained
29 Mar 2024
Assurance For Sewerage Connection
Already Been Obtained
27 Mar 2024
Assurance For Storm Water
Already Been Obtained
27 Mar 2024
Electrical Load
Already Been Obtained
26 Jul 2024
HUDA Construction
Already Been Obtained
30 Jul 2024
Loi
Already Been Obtained
12 Jul 2023
Allotment Letter - Plot No. Gh-1 Vide Memo No. ZO002/EO018/UE029/Galot/0000001411, Allotted By The HSVP
Vitrified Tile Upto False Ceiling / Stone, Vitrified Tiles Up To Height As Per Design,
Kitchen Details
Anti Skid Vitrified Tiles / Stone, Vitrified Tiles Up To Height As Per Design False Ceiling With Acrylic Emulsion Paint, Prefabricated Modular Door With Frame Or Flush Door With Laminate / Paint And Hardwood Frame, Aluminium/ Upvc
Bathroom Fittings
Vitrified Tile Upto False Ceiling / Stone
Doors And Windos Frames
Main Door To Flat - Hardwood Frame With Glass Panels / Veneered Flush Door, Prefabricated Modular Door With Frame Or Flush Door With Laminate / Paint And Hardwood Frame, Aluminium/ Upvc
Glass Work
Double Glazed/Single Glazed Performance Glass
Electric Fittings
Pvc Conduit, Modular Switches, 1.1 Kv Grade Copper Flexiblewire, Gi Box, 300MM Dia In Common Area Only, Led Lights (In Common Area Only)
Conducting And Wiring Details
1.1 Kv Grade Copper Flexiblewire
Lift Details
Two Towers With 2 To A Core, Total 44 Nos. Flats In Both The Towers, One Tower With 1 Flat At Each Floor, Total 22 Flats. Total No. Of Flats = 110 Nos. (2*44+22)
External Glazings
Double Closing Unit Prfomance Glass
Windows/Glazings
Double Closing Unit Prfomance Glass
Doors
Hardwood Frame
Main Doors
Main Door To Flat - Hardwood Frame With Glass Panels / Veneered Flush Door.
Internal Doors
Prefabricated Modular Door With Frame Or Flush Door With Laminate / Paint And Hardwood Frame.
Air Conditioning
Vrv With Suitable Idu As Per Design
Electrical Fittings
As Per Design
Provision Of Wifi And Broadband Facility
As Per Design
Internal Finishing
Acrylic Emulsion Paint, Paint And Hardwood Frame, Imported Marble, Prefabricated Door Frame
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about ONE42 Golf Course Road?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.