8TH Floor, Wing B, Milestone Experion Centre, Sector -15, Part -2, Gurugram 122001, Haryana
CIN
U70109DL2006FTC151343
Site address
Sector 112 Gurugram
Sector
Sector 112
Tehsil / District
Gurgaon / Gurugram
Building plans approved
9 Aug 2024
Construction start (as filed)
1 Jan 2025
Completion (as filed)
30 Jun 2030
Application submitted
3 Sep 2024
Authority, hearings & orders
Current statusApproved And Certificate Uploaded
Initial scrutinyFirst hearing
Next hearingNot Required
Application submitted online
HearingExamination By AuthorityView order Proceedings
Ms. Deepika, Planning Executive and Sh. Ashish Dubey, Chartered Accountant briefed about the facts of the case. Sh. Suneet Puri (AR) and Sh. Ajay Kumar (AR) are present on behalf of the promoter. The AR states that the phasing has been approved by DTCP and the instant application for phase-C only and no changes in respect of earlier phases have been made. The OC in respect of phase-I was applied prior to commencement of the Act and Rules and as per orders of the then PS TCP -cum-Chairman Interim RERA, the registration of this part was not required and for remaining phase the registration was obtained and project was handed over to their RWA after obtaining OC and the issue of obtaining extension of this part and levy of late fee by the Authority, an appeal has been filed and pending before Hon’ble HREAT. Approved in principle subject to verification of the above details by the office. The matter to come up on 14.10.2024.
HearingApproved And Ready For Certificate Issuing ProcessView order Proceedings
Ms. Deepika, Planning Executive and Sh. Ashish Dubey, Chartered Accountant briefed about the facts of the case. Sh. Suneet Puri (AR), Sh. Ajay Kumar (AR) and Sh. Shekhar Verma (AR) are present on behalf of the promoter. Sh. Pooja Aganpal (Advocate) and Sh. Manoj Kumar are present on behalf of the complainant. The windchants condominium association has submitted a complaint copy of which was provided to the promoter against which the reply has been submitted by the promoter on 18.10.2024 & 21.10.2024. Further, both the parties windchants condominium association and the promoter of the project are present. The complainant states that the builder has not yet handed over the IFMS to WCA inspite of the fact the WCA is maintaining the condominium till date irrespective of the fact that the promoter had launched, constructed and sold the project as per approved building plan of 2012. Now, the promoter company has merged an adjoining plot admeasuring 1.1965 acres acquired under license no. 99 of 2019 well after grant of EC in 2012. Due to merging of additional tower the existing services such as swimming pool, club house, etc. will be overloaded. The association further stated that the percentage of the interest of the common area will be reduced after merging of the additional licensed land in the existing colony and consent of 2/3rd allottees is required as per the DTCP policy dated 28.01.2013. In reply to the same, Sh. Shekhar Verma (Advocate) for the promoter stated that the IFMS is a separate issue and will be dealt separately and nothing to do with the registration of the current application u/s 4. Regarding the grant of license no. 99 of 2019, for an area measuring 1.1965 acres, the Advocate of the promoter states that additional license no. 99 of 2019 was issued by competent authority as far back on 04.09.2019 and this fact has been in the knowledge of the association from the very beginning. Pertinently the association has never challenged the issuance of the said additional license issued more than 5 years back. It is not disputed that the dwelling units, community facilities, and EWS units shall be constructed over the said area, as per building plans already approved by the competent authority. He further stated that, all services such as STP, WTP, Fire fighting plant room, UGT, Electrical transformer, Power backup, Rain water harvesting, etc. are incorporated within the new proposed tower within 1.1965 acres. Thus, the new development is independent of the existing development in the manner that it does not affect the existing services in any manner. DTCP, instead of granting a stand-alone license, has granted the license in addition to the earlier license numbers 21 of 2008 & 28 of 2012 for an area measuring 23.431, thereby making total area measuring 24.6275 acres for developing the group housing colony. Further, phasing has been approved by DTCP vide memo no. ZP-595-III/AD(VK)/2023/38605 dated 10.11.2023. He further stated that the role of the authority was limited to ensuring that the requisite compliances have been placed on record. The legality of the approvals granted by the DTCP can only be challenged at the level of the competent authority in the Department of Town and Country Planning. After hearing the parties and going through their submissions, the authority is of the view that the subject land for which registration has been applied under section 4 of RERA, 2016 comprises of a separate phase and can be registered by the promoter as a stand-alone real estate project in terms of explanation below section 3(2) of the Act, 2016. In view of the above, the application filed by the complainant association is found without merits and is declined. The registration of the project is approved subject to necessary compliances and corrections in the A-H form and DPI.
Registration grantedGGM/879/611/2024/106
Certificate uploadedRC Uploaded
Registration valid till
Land, licence & cost
Land area of the project
1.197 acres
Total licensed area
24.628 acres
Licence
210/2008 dated 08.02.2008 and 28 of 2012 dated 07.04.2012 and 99 of 2019 Dated 04.09.2019
FAR permissible / proposed
3.474 / 3.432
Estimated project cost
₹ 171.47 Cr
Cost of land
₹ 22.67 Cr
Cost of construction
₹ 113.99 Cr
Infrastructure and other structures
₹ 16.25 Cr
EDC, taxes, levies and other costs
₹ 18.57 Cr
How the land will be used
Use
Acres
Share
Land Area To Be Used For Construction Of Apartments
0.1849
15.5%
Construction Of Roads
0.3123
26.1%
Parks And Playgrounds
0.1842
15.4%
Vehicle Parkings
0.3521
29.4%
Club House
0.163
13.6%
Apartments 65 units · 1 tower
Type
Carpet area (sq m)
Carpet area (sq ft)
Units
Apartment/Shops/Other Buildings
218.72
2,354
60
Apartment/Shops/Other Buildings
17.89
193
4
Apartment/Shops/Other Buildings
11.70
126
1
Areas are as filed with HRERA.
External services
Service
Provided by
Approval taken
Roads
ALREADY CONNECTED
No
Water Supply
GMDA
Yes
Electricity
GMDA
Yes
Sewage Disposal
GMDA
Yes
Storm Water Drainage
DHAVPN
Yes
Facilities in the service plan
Facility
Estimated cost
Status
Internal Roads And Pavements
₹ 1.86 Cr
As Per Project Report
Water Supply System
₹ 45.42 lakh
As Per Project Report
Storm Water Drainage
₹ 14.59 lakh
As Per Project Report
Electricity Supply System
₹ 85.17 lakh
As Per Project Report
Sewage Treatment & Garbage Disposal
₹ 14.74 lakh
As Per Project Report
Street Lighting
₹ 13.61 lakh
As Per Project Report
Security And Fire Fighting
₹ 3.04 Cr
As Per Project Report
Playgrounds And Parks
₹ 1.56 Cr
As Per Project Report
Club House/Community Centre
₹ 4.68 Cr
As Per Project Report
Shopping Area
₹ 29.9 lakh
As Per Project Report
Renewable Energy System
₹ 32.75 lakh
As Per Project Report
Sewage System
₹ 8.73 lakh
As Per Project Report
Under Ground Water Tank
₹ 7.1 lakh
As Per Project Report
Rain Water Harvesting
₹ 14.74 lakh
As Per Project Report
Electrical Sub Station
₹ 2.45 Cr
As Per Project Report
Statutory approvals
Approval
Status
Date
Aai
Already Been Obtained
27 Nov 2019
HUDA Construction
Already Been Obtained
30 Jul 2024
Electrical Load
Already Been Obtained
22 Jul 2024
Licence 21 Of 2008 Dated 08.02.2008
Already Been Obtained
8 Feb 2008
Building Plan
Already Been Obtained
9 Aug 2024
Water Assurance
Already Been Obtained
10 Dec 2018
Sewerage Assurance
Already Been Obtained
26 Feb 2019
Strom Water Assurance
Already Been Obtained
26 Feb 2019
Licence 28 Of 2012 Dated 07.04.2012
Already Been Obtained
7 Apr 2012
Licence 99 Of 2019 Dated 04.09.2019
Already Been Obtained
4 Sep 2019
Environment Clearance
Applied For But Yet To Receive
17 Jul 2024
Fire Scheme Approval
Applied For But Yet To Receive
22 Aug 2024
Service Estimate And Plan
Applied For But Yet To Receive
6 Sep 2024
Specifications (as filed)
Flooring Details Of Various Parts Of House
Imported Marble, Laminated Wooden Flooring, Anti Skid Vitrified Tiles
Wall Finishing Details
Vitrified Tile Upto False Ceiling
Kitchen Details
Vitrified Tiles 2' Above Kitchen Counter, Rest Of Walls In Acrylic Emulsion Paint.
Bathroom Fittings
Vitrified Tile Upto False Ceiling
Wood Work Etc
Prefabricated Modular Door With Frame Or Flush Door With Laminate / Paint And Hardwood Frame.
Doors And Windos Frames
Main Door To Flat - Hardwood Frame With Veneered Flush Door, Aluminium/ Upvc Glazings With Fly Net In All Sliders And Performance Glass.
Glass Work
Single Glazed
Electric Fittings
As Per Design
Conducting And Wiring Details
1.1 Kv Grade Copper Flexiblewire
Lift Details
2 To A Core, Total 60 Nos. Flats
External Glazings
Aluminium / Upvc Glazing With Performance Glass`
Windows/Glazings
Upvc Glazings With Fly Net In All Sliders And Performance Glass.
Doors
Main Door To Flat - Hardwood Frame With Veneered Flush Door.
Main Doors
Main Door To Flat - Hardwood Frame With Veneered Flush Door.
Internal Doors
Prefabricated Modular Door With Frame Or Flush Door With Laminate / Paint And Hardwood Frame.
Air Conditioning
Hi-Wall Idu
Electrical Fittings
As Per Design
Provision Of Wifi And Broadband Facility
As Per Design
External Finishing/Colour Scheme
Acrylic Emulsion Paint
Internal Finishing
Hardwood Frame
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Windchants Phase C?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.