Godrej Samaris
by Godrej Properties Limited · Gh-24, Urban Estate, Sector 53, Gurugram
- RERA registration
- Applied, not granted yet
- Applied on
- 1 Apr 2026
- Application status
- In process
- Project ID
- RERA-GRG-2164-2026
- Apartments
- 494 in 1 tower
- Completion (as filed)
- 31 Aug 2033
- Estimated cost
- ₹ 3,646.75 Cr
This project has applied for RERA registration but has not been granted it yet. Under RERA it cannot be advertised, marketed or sold until it is registered.
RERA registration
| Registration certificate | Not issued yet: the application is being processed by HRERA Gurugram |
|---|---|
| Project ID | RERA-GRG-2164-2026 |
| Authority | HRERA Gurugram |
| Project type (as filed) | New |
| Project name | Godrej Samaris |
| Promoter | Godrej Properties Limited |
| Promoter’s registered office | 3RD Floor, Plot No. 35, Um House, Sector 44, Gurugram, Haryana 122002 |
| CIN | L74120MH1985PLC035308 |
| Site address | Gh-24, Urban Estate, Sector 53, Gurugram |
| Sector | Sector 53 |
| Tehsil / District | Wazirabad St / Gurugram |
| Construction start (as filed) | 1 Apr 2026 |
| Completion (as filed) | 31 Aug 2033 |
| Application submitted | 1 Apr 2026 |
Authority, hearings & orders
- Application submitted online
Land, licence & cost
| Licence | Group Housing Site No. 24 in Sector-53 Gurugram Allotment from HSVP and Conveyance deed vide no. 19437 dated 12.02.2026 |
|---|---|
| FAR permissible / proposed | 4.12 / 4.05 |
| Estimated project cost | ₹ 3,646.75 Cr |
| Cost of land | ₹ 1,218.74 Cr |
| Cost of construction | ₹ 1,677.88 Cr |
| Infrastructure and other structures | ₹ 137.05 Cr |
| EDC, taxes, levies and other costs | ₹ 613.08 Cr |
How the land will be used
| Use | Area (as filed) | Share |
|---|---|---|
| Land Area To Be Used For Construction Of Apartments | 4,821.03 | 16.1% |
| Construction Of Roads | 6,081.21 | 20.3% |
| Electricity Sub-Station | 1,626.84 | 5.4% |
| Commercial Units | 147.71 | 0.5% |
| Stp | 768.9 | 2.6% |
| Rain Water Harvesting | 538.23 | 1.8% |
| Softscaps | 4,463.68 | 14.9% |
| Hardscaps | 6,534.05 | 21.8% |
| Community Center | 5,017.75 | 16.7% |
Apartments 494 units · 1 tower
| Type | Carpet area (sq m) | Carpet area (sq ft) | Units |
|---|---|---|---|
| Apartment/Shops/Other Buildings | 127.13 | 1,368 | 3 |
| Apartment/Shops/Other Buildings | 127.35 | 1,371 | 3 |
| Apartment/Shops/Other Buildings | 148.55 | 1,599 | 34 |
| Apartment/Shops/Other Buildings | 152.19 | 1,638 | 30 |
| Apartment/Shops/Other Buildings | 152.93 | 1,646 | 34 |
| Apartment/Shops/Other Buildings | 153.35 | 1,651 | 30 |
| Apartment/Shops/Other Buildings | 168.67 | 1,816 | 33 |
| Apartment/Shops/Other Buildings | 168.68 | 1,816 | 1 |
| Apartment/Shops/Other Buildings | 170.67 | 1,837 | 31 |
| Apartment/Shops/Other Buildings | 170.68 | 1,837 | 3 |
| Apartment/Shops/Other Buildings | 192.31 | 2,070 | 34 |
| Apartment/Shops/Other Buildings | 192.44 | 2,071 | 29 |
| Apartment/Shops/Other Buildings | 193.47 | 2,082 | 29 |
| Apartment/Shops/Other Buildings | 194.57 | 2,094 | 34 |
| Apartment/Shops/Other Buildings | 200.01 | 2,153 | 5 |
| Apartment/Shops/Other Buildings | 202.56 | 2,180 | 5 |
| Apartment/Shops/Other Buildings | 214.66 | 2,311 | 3 |
| Apartment/Shops/Other Buildings | 217.33 | 2,339 | 31 |
| Apartment/Shops/Other Buildings | 218.15 | 2,348 | 34 |
| Apartment/Shops/Other Buildings | 219.00 | 2,357 | 3 |
| Apartment/Shops/Other Buildings | 222.66 | 2,397 | 31 |
| Apartment/Shops/Other Buildings | 223.04 | 2,401 | 34 |
| Apartment/Shops/Other Buildings | 269.19 | 2,898 | 1 |
| Apartment/Shops/Other Buildings | 273.22 | 2,941 | 1 |
| Apartment/Shops/Other Buildings | 274.02 | 2,950 | 1 |
| Apartment/Shops/Other Buildings | 287.72 | 3,097 | 1 |
| Apartment/Shops/Other Buildings | 289.59 | 3,117 | 1 |
| Apartment/Shops/Other Buildings | 290.55 | 3,127 | 1 |
| Apartment/Shops/Other Buildings | 339.40 | 3,653 | 1 |
| Apartment/Shops/Other Buildings | 340.83 | 3,669 | 1 |
| Apartment/Shops/Other Buildings | 341.29 | 3,674 | 1 |
| Apartment/Shops/Other Buildings | 343.50 | 3,697 | 1 |
| Apartment/Shops/Other Buildings | 344.51 | 3,708 | 1 |
| Apartment/Shops/Other Buildings | 350.00 | 3,767 | 1 |
| Apartment/Shops/Other Buildings | 362.15 | 3,898 | 1 |
| Apartment/Shops/Other Buildings | 362.45 | 3,901 | 1 |
| Apartment/Shops/Other Buildings | 6.50 | 70 | 1 |
| Apartment/Shops/Other Buildings | 17.91 | 193 | 1 |
| Apartment/Shops/Other Buildings | 22.50 | 242 | 1 |
| Apartment/Shops/Other Buildings | 25.24 | 272 | 1 |
| Apartment/Shops/Other Buildings | 27.15 | 292 | 1 |
| Apartment/Shops/Other Buildings | 134.49 | 1,448 | 1 |
Areas are as filed with HRERA.
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | ALREADY CONNECTED | Yes |
| Water Supply | MCG | Yes |
| Electricity | Yes | SEWAGE DISPOSAL |
| GMDA | Yes | STORM WATER DRAINAGE |
| GMDA | Yes | 4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report: |
| Sr. No. | Name of the facility | Estimated cost (In Lakhs)(Within the project area only) |
| Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C) | 1 | INTERNAL ROADS AND PAVEMENTS |
| 535.18 | AS PER PROJECT REPORT | 2 |
| Water Supply System | 26.41 | AS PER PROJECT REPORT |
| 3 | STORM WATER DRAINAGE | 67.93 |
| As Per Project Report | 4 | ELECTRICITY SUPPLY SYSTEM |
| 484.18 | AS PER PROJECT REPORT | 5 |
| Sewage Treatment & Garbage Disposal | 67.93 | AS PER PROJECT REPORT |
| 6 | STREET LIGHTING | 113.23 |
| As Per Project Report | 7 | SECURITY AND FIRE FIGHTING |
| 73.59 | AS PER PROJECT REPORT | 8 |
| Playgrounds And Parks | 0 | YET TO BE PREPARED |
| 9 | CLUB HOUSE/COMMUNITY CENTRE | 0 |
| Yet To Be Prepared | 10 | SHOPPING AREA |
| 0 | YET TO BE PREPARED | 11 |
| Renewable Energy System | 53.59 | AS PER PROJECT REPORT |
| 12 | SCHOOL | 0 |
| Yet To Be Prepared | 13 | HOSPITAL/DISPENSARY |
| 0 | YET TO BE PREPARED | 14 |
| Any Other | 0 | YET TO BE PREPARED |
| 15 | PARKING | 152.91 |
| As Per Project Report | 16 | STP |
| 91.74 | AS PER PROJECT REPORT | 17 |
| Underground Water Tank | 37.73 | AS PER PROJECT REPORT |
| 18 | RAIN WATER HARVESTING | 416.67 |
| As Per Project Report | 19 | SOFTSCAPE |
| 592.98 | AS PER PROJECT REPORT | 20 |
| Hardscape | 114.68 | AS PER PROJECT REPORT |
| 21 | ELECTRICAL SUBSTATION | 1527.74 |
| As Per Project Report | 22 | SIGNAGES |
| 227.83 | AS PER PROJECT REPORT | 5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed. |
| Na | (date) | 6. Date of approval of Building Plans |
| Na | (date) | 7. New projects: |
| i) Likely date of starting the construction work | 01-04-2026 | ii) Likely date of completing the project |
| 31-08-2033 | iii) Sizes of the plots to be offered in the project | Sr. No |
| Plot Area(In Square Meter) | Number of plots in the project | 1 |
| 0 | 0 | Total |
| 0 | iv. Type of apartments to be constructed in the project: | Type |
| Carpet area(In Square Meter) | Number of apartments | Number of towers |
| Apartment/Shops/Other Buildings | 127.13 | 3 |
| 1 | Apartment/Shops/Other Buildings | 127.35 |
| 3 | 1 | Apartment/Shops/Other Buildings |
| 148.55 | 34 | 1 |
| Apartment/Shops/Other Buildings | 152.19 | 30 |
| 1 | Apartment/Shops/Other Buildings | 152.93 |
| 34 | 1 | Apartment/Shops/Other Buildings |
| 153.35 | 30 | 1 |
| Apartment/Shops/Other Buildings | 168.67 | 33 |
| 1 | Apartment/Shops/Other Buildings | 168.68 |
| 1 | 1 | Apartment/Shops/Other Buildings |
| 170.67 | 31 | 1 |
| Apartment/Shops/Other Buildings | 170.68 | 3 |
| 1 | Apartment/Shops/Other Buildings | 192.31 |
| 34 | 1 | Apartment/Shops/Other Buildings |
| 192.44 | 29 | 1 |
| Apartment/Shops/Other Buildings | 193.47 | 29 |
| 1 | Apartment/Shops/Other Buildings | 194.57 |
| 34 | 1 | Apartment/Shops/Other Buildings |
| 200.01 | 5 | 1 |
| Apartment/Shops/Other Buildings | 202.56 | 5 |
| 1 | Apartment/Shops/Other Buildings | 214.66 |
| 3 | 1 | Apartment/Shops/Other Buildings |
| 217.33 | 31 | 1 |
| Apartment/Shops/Other Buildings | 218.15 | 34 |
| 1 | Apartment/Shops/Other Buildings | 219.00 |
| 3 | 1 | Apartment/Shops/Other Buildings |
| 222.66 | 31 | 1 |
| Apartment/Shops/Other Buildings | 223.04 | 34 |
| 1 | Apartment/Shops/Other Buildings | 269.19 |
| 1 | 1 | Apartment/Shops/Other Buildings |
| 273.22 | 1 | 1 |
| Apartment/Shops/Other Buildings | 274.02 | 1 |
| 1 | Apartment/Shops/Other Buildings | 287.72 |
| 1 | 1 | Apartment/Shops/Other Buildings |
| 289.59 | 1 | 1 |
| Apartment/Shops/Other Buildings | 290.55 | 1 |
| 1 | Apartment/Shops/Other Buildings | 339.40 |
| 1 | 1 | Apartment/Shops/Other Buildings |
| 340.83 | 1 | 1 |
| Apartment/Shops/Other Buildings | 341.29 | 1 |
| 1 | Apartment/Shops/Other Buildings | 343.50 |
| 1 | 1 | Apartment/Shops/Other Buildings |
| 344.51 | 1 | 1 |
| Apartment/Shops/Other Buildings | 350.00 | 1 |
| 1 | Apartment/Shops/Other Buildings | 362.15 |
| 1 | 1 | Apartment/Shops/Other Buildings |
| 362.45 | 1 | 1 |
| Apartment/Shops/Other Buildings | 6.50 | 1 |
| 1 | Apartment/Shops/Other Buildings | 17.91 |
| 1 | 1 | Apartment/Shops/Other Buildings |
| 22.50 | 1 | 1 |
| Apartment/Shops/Other Buildings | 25.24 | 1 |
| 1 | Apartment/Shops/Other Buildings | 27.15 |
| 1 | 1 | Apartment/Shops/Other Buildings |
| 134.49 | 1 | 1 |
| (vi) Quarterly schedule of development of whole/remaining part of the project: | (c) Apartments/Shops/Other Buildings | Expenditure incurred till the date of application (In Lakhs) |
| Particulars | Expenditure | Expenditure to be made in each quarter (In Lakhs) |
| Particulars | Year-2026 | Jan-Mar |
| Apr-June | July-Sep | Oct-Dec |
| Apartments | 1678 | 1678 |
| 1678 | Shops | 0 |
| 0 | 0 | Plots |
| 0 | 0 | 0 |
| Particulars | Year-2027 | Jan-Mar |
| Apr-June | July-Sep | Oct-Dec |
| Apartments | 5034 | 5034 |
| 6712 | 6712 | Shops |
| 0 | 0 | 0 |
| 0 | Plots | 0 |
| 0 | 0 | 0 |
| Particulars | Year-2028 | Jan-Mar |
| Apr-June | July-Sep | Oct-Dec |
| Apartments | 6712 | 6712 |
| 6712 | 11745 | Shops |
| 0 | 0 | 0 |
| 0 | Plots | 0 |
| 0 | 0 | 0 |
| Particulars | Year-2029 | Jan-Mar |
| Apr-June | July-Sep | Oct-Dec |
| Apartments | 11745 | 11745 |
| 11745 | 10067 | Shops |
| 0 | 0 | 0 |
| 0 | Plots | 0 |
| 0 | 0 | 0 |
| Particulars | Year-2030 | Jan-Mar |
| Apr-June | July-Sep | Oct-Dec |
| Apartments | 8389 | 8389 |
| 6712 | 6712 | Shops |
| 0 | 0 | 0 |
| 0 | Plots | 0 |
| 0 | 0 | 0 |
| Particulars | Year-2031 | Jan-Mar |
| Apr-June | July-Sep | Oct-Dec |
| Apartments | 11812.27 | 5034 |
| 5034 | 5034 | Shops |
| 0 | 0 | 0 |
| 0 | Plots | 0 |
| 0 | 0 | 0 |
| Particulars | Year-2032 | Jan-Mar |
| Apr-June | July-Sep | Oct-Dec |
| Apartments | 3356 | 1678 |
| 1678 | 1678 | Shops |
| 0 | 0 | 0 |
| 0 | Plots | 0 |
| 0 | 0 | 0 |
| Particulars | Year-2033 | Jan-Mar |
| Apr-June | July-Sep | Oct-Dec |
| Apartments | 1678 | 0 |
| Shops | 0 | 0 |
| Plots | 0 | 0 |
| (d) Infrastructure | Expenditure incurred till the date of application (In Lakhs) | Particulars |
| Expenditure | Expenditure to be made in each quarter (In Lakhs) | Particulars |
| Year-2030 | Jan-Mar | Apr-June |
| July-Sep | Oct-Dec | Roads & Pavements |
| 38.11 | Water Supply System | 2.47 |
| Sewerage treatment & garbage disposal | 6.36 | Electricity Supply System |
| 35.33 | Storm Water Drainage | 6.16 |
| Parks and Playgrounds | 0 | Clubhouse/community centres |
| 536.80 | Shopping area | 0 |
| Other | 0 | STP |
Facilities in the service plan
| Facility | Estimated cost | Status |
|---|---|---|
| Internal Roads And Pavements | ₹ 5.35 Cr | As Per Project Report |
| Water Supply System | ₹ 26.41 lakh | As Per Project Report |
| Storm Water Drainage | ₹ 67.93 lakh | As Per Project Report |
| Electricity Supply System | ₹ 4.84 Cr | As Per Project Report |
| Sewage Treatment & Garbage Disposal | ₹ 67.93 lakh | As Per Project Report |
| Street Lighting | ₹ 1.13 Cr | As Per Project Report |
| Security And Fire Fighting | ₹ 73.59 lakh | As Per Project Report |
| Renewable Energy System | ₹ 53.59 lakh | As Per Project Report |
| Parking | ₹ 1.53 Cr | As Per Project Report |
| Stp | ₹ 91.74 lakh | As Per Project Report |
| Underground Water Tank | ₹ 37.73 lakh | As Per Project Report |
| Rain Water Harvesting | ₹ 4.17 Cr | As Per Project Report |
| Softscape | ₹ 5.93 Cr | As Per Project Report |
| Hardscape | ₹ 1.15 Cr | As Per Project Report |
| Electrical Substation | ₹ 15.28 Cr | As Per Project Report |
| Signages | ₹ 2.28 Cr | As Per Project Report |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| Building Plan | Already Been Obtained | |
| Conveyance Deed | Already Been Obtained | 13 Feb 2026 |
| Assurance Of Water Supply | Already Been Obtained | 17 Jun 2025 |
| Assurance For Sewerage Connection | Already Been Obtained | 10 Jul 2025 |
| Assurance For Storm Water | Already Been Obtained | 9 Jul 2025 |
| HUDA Construction | Already Been Obtained | 10 Jul 2025 |
| Loi | Already Been Obtained | 23 Oct 2024 |
| Aai | Already Been Obtained | 11 Mar 2025 |
| Forest Noc | Already Been Obtained | 9 Oct 2025 |
| Environment Clearance | Already Been Obtained | 9 Mar 2026 |
| Fire Scheme Approval | Applied For But Yet To Receive |
Specifications (as filed)
| Flooring Details Of Various Parts Of House | Vitrified Tiling/Laminated Wooden Flooring/Skid Resistant Vitrified Tiles/Wooden Look Skid Resistant Tiles |
|---|---|
| Wall Finishing Details | Acrylic Emulsion Paint/Oil Bound Distemper |
| Kitchen Details | Floor: Vitrified Tiles, Wall: Tile Cladding 2' Above Counter And Oil Bound Distemper Above That, Ceiling: Oil Bound Distemper |
| Bathroom Fittings | Sanitary Fixtures & Fittings Of Repute Make |
| Wood Work Etc | Laminated/Painted Flush Doors/ Moulded Shutter With Wooden Frame |
| Doors And Windos Frames | Main Door: Designer Door Shutter With Veneer Finish Internal Doors: Laminated Door Shutter External Door & Windows: Glazed Windows Aluminum/ Upvc/Ms Frame |
| Glass Work | 4MM And Above As Per Specifications |
| Electric Fittings | As Per Building Norms |
| Conducting And Wiring Details | As Per Building Norms |
| Water Storage | Underground And Overhead Water Tanks |
| Lift Details | 3 Passenger Lifts And 1 Service Lift |
| Windows/Glazings | Powder Coated/Painted Aluminum/Upvc Windows With 4MM Or Above Thick Glazing As Per Specifications |
| Doors | Laminated/Painted Flush Doors/ Moulded Shutter With Wooden Frame |
| Main Doors | Laminated/Painted/Polished Flush Doors/ Moulded Shutter With Wooden Frame |
| Internal Doors | Laminated/Painted Flush Doors/ Moulded Shutter With Wooden Frame |
| Air Conditioning | As Per Specification Of Standard Make |
| Electrical Fittings | As Per Specification Of Standard Make |
| External Finishing/Colour Scheme | External Grade Paints |
| Internal Finishing | 10 To 12MM Thick Plaster On Blockworks, Rcc Walls And Columns With Cement Mortar Of 1:5 |
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.