Godrej Samaris
by Godrej Properties Limited · Gh-24, Urban Estate, Sector 53, Gurugram
- RERA registration
- GGM/1059/791/2026/31
- Registered on
- 4 May 2026
- Valid till
- 31 Aug 2033
- Project ID
- RERA-GRG-2216-2026
- Apartments
- 494 in 1 tower
- Completion (as filed)
- 31 Aug 2033
- Estimated cost
- ₹ 3,646.75 Cr
RERA registration
| Registration certificate | GGM/1059/791/2026/31, dated 4 May 2026 |
|---|---|
| Registration valid till | 31 Aug 2033 |
| Project ID | RERA-GRG-2216-2026 |
| Authority | HRERA Gurugram |
| Project type (as filed) | New |
| Project name | Godrej Samaris |
| Promoter | Godrej Properties Limited |
| Promoter’s registered office | 3RD Floor, Plot No. 35, Um House, Sector 44, Gurugram, Haryana 122002 |
| CIN | L74120MH1985PLC035308 |
| Site address | Gh-24, Urban Estate, Sector 53, Gurugram |
| Sector | Sector 53 |
| Tehsil / District | Wazirabad St / Gurugram |
| Layout plan approved | 30 Mar 2026 |
| Building plans approved | 30 Mar 2026 |
| Construction start (as filed) | 1 Apr 2026 |
| Completion (as filed) | 31 Aug 2033 |
| Application submitted | 2 Apr 2026 |
Authority, hearings & orders
- Application submitted online
- Notice sent to the promoter Deficiency notice
-
Hearing
Approved And Ready For Certificate Issuing Process View order
Proceedings
Sh. Sumeet, Engineering Officer and Ms. Asha, Chartered Accountant briefed about the facts of the project. Sh. Gautam Babbar (Regional Head), Sh. Ranjit Bhambhu (AR) and Ms. Anjana Gulati (AR) are present on behalf of the promoter. The Authorized Representative of the promoter states that HSVP has allotted a land parcel area measuring 7.413 acres (29999.46 sqm) to M/s Godrej Properties Limited vide conveyance deed no. 19437 dated 17.02.2026 and accordingly promoter obtained the approval of building plans for the project. The project site is located on 24 mt wide road and the road is metaled and motorable as on date. So, there is no need for separate access permission and affidavit to this affect has also been submitted to the Authority. Further states that the fire scheme approval, approved electrification plan, and mining permission are under process, and the said approvals have not yet been obtained as on date. Further, the Authorized Representative of the promoter undertakes to obtain and submit: i. Fire Scheme approval within 3 months from the date of grant of registration; ii. Approved Electrification plan within 3 months from the date of grant of registration; and iii. Mining permission before start of construction of project. Further, he undertakes to submit the Demand Draft amounting to Rs. 25 lakhs, as a security deposit for timely compliance with the above requirements at point (i). It is also expressly undertaken that in the event of failure to obtain and submit the aforesaid approval within the stipulated time frame, the said security amount shall be liable to be forfeited by the Authority. The Authority has taken note of the submissions made by the AR of the promoter regarding the non-availability of the aforesaid statutory approvals as on date. In view of the above, and in the interest of regulatory compliance, the Authority hereby directs that the promoter shall submit the Demand Draft amounting to Rs. 25,00,000/- (Rupees Twenty-Five Lakhs only), in favour of the Authority as security amount for timely submission of fire scheme approval within 3 months from the date of grant of registration. In the event of non-submission of the above approval within the prescribed time frames, the said security amount shall stand forfeited by the Authority, and such failure may also attract additional regulatory action as permissible under the Act of 2016, rules and regulations made thereunder. Further, the promoter shall submit: 1. Approved electrification plan within 3 months from the date of grant of registration; 2. Mining permission before start of construction of project. Approved as proposed subject to rectification of deficiencies mentioned above. The Registration Certificate shall be issued after submission of the remaining deficiencies mentioned above including correction in Form A–H, online DPI and submission of Demand Draft of Rs. 25,00,000/- (Rupees Twenty-Five Lakhs only) for submission of fire scheme approval within the time frame mentioned above, along with the deficiency mentioned at S. No. 34.
- Registration granted GGM/1059/791/2026/31
- Certificate uploaded RC uploaded
- Registration valid till
Land, licence & cost
| Licence | Group Housing Site No. 24 in Sector-53 Gurugram Allotment from HSVP and Conveyance deed vide no. 19437 dated 12.02.2026 |
|---|---|
| FAR permissible / proposed | 4.13 / 4.05 |
| Estimated project cost | ₹ 3,646.75 Cr |
| Cost of land | ₹ 1,218.74 Cr |
| Cost of construction | ₹ 1,677.88 Cr |
| Infrastructure and other structures | ₹ 137.05 Cr |
| EDC, taxes, levies and other costs | ₹ 613.08 Cr |
How the land will be used
| Use | Area (as filed) | Share |
|---|---|---|
| Land Area To Be Used For Construction Of Apartments | 4,821.03 | 16.1% |
| Construction Of Roads | 6,081.21 | 20.3% |
| Electricity Sub-Station | 1,626.84 | 5.4% |
| Commercial | 147.71 | 0.5% |
| Stp | 768.9 | 2.6% |
| Rain | 538.23 | 1.8% |
| Softscapes | 4,463.68 | 14.9% |
| Hardscapes | 6,534.05 | 21.8% |
| Community | 5,017.75 | 16.7% |
Apartments 494 units · 1 tower
| Type | Carpet area (sq m) | Carpet area (sq ft) | Units |
|---|---|---|---|
| Apartment/Shops/Other Buildings | 217.33 | 2,339 | 31 |
| Apartment/Shops/Other Buildings | 218.15 | 2,348 | 34 |
| Apartment/Shops/Other Buildings | 214.66 | 2,311 | 3 |
| Apartment/Shops/Other Buildings | 341.29 | 3,674 | 1 |
| Apartment/Shops/Other Buildings | 340.83 | 3,669 | 1 |
| Apartment/Shops/Other Buildings | 222.66 | 2,397 | 31 |
| Apartment/Shops/Other Buildings | 223.04 | 2,401 | 34 |
| Apartment/Shops/Other Buildings | 219.00 | 2,357 | 3 |
| Apartment/Shops/Other Buildings | 362.15 | 3,898 | 1 |
| Apartment/Shops/Other Buildings | 362.45 | 3,901 | 1 |
| Apartment/Shops/Other Buildings | 168.67 | 1,816 | 33 |
| Apartment/Shops/Other Buildings | 170.67 | 1,837 | 30 |
| Apartment/Shops/Other Buildings | 168.68 | 1,816 | 1 |
| Apartment/Shops/Other Buildings | 170.67 | 1,837 | 1 |
| Apartment/Shops/Other Buildings | 170.68 | 1,837 | 3 |
| Apartment/Shops/Other Buildings | 269.19 | 2,898 | 1 |
| Apartment/Shops/Other Buildings | 273.22 | 2,941 | 1 |
| Apartment/Shops/Other Buildings | 194.57 | 2,094 | 34 |
| Apartment/Shops/Other Buildings | 192.44 | 2,071 | 29 |
| Apartment/Shops/Other Buildings | 200.01 | 2,153 | 5 |
| Apartment/Shops/Other Buildings | 339.40 | 3,653 | 1 |
| Apartment/Shops/Other Buildings | 344.51 | 3,708 | 1 |
| Apartment/Shops/Other Buildings | 152.93 | 1,646 | 34 |
| Apartment/Shops/Other Buildings | 152.19 | 1,638 | 30 |
| Apartment/Shops/Other Buildings | 127.13 | 1,368 | 3 |
| Apartment/Shops/Other Buildings | 289.59 | 3,117 | 1 |
| Apartment/Shops/Other Buildings | 287.72 | 3,097 | 1 |
| Apartment/Shops/Other Buildings | 192.31 | 2,070 | 34 |
| Apartment/Shops/Other Buildings | 193.47 | 2,082 | 29 |
| Apartment/Shops/Other Buildings | 202.56 | 2,180 | 5 |
| Apartment/Shops/Other Buildings | 343.50 | 3,697 | 1 |
| Apartment/Shops/Other Buildings | 350.00 | 3,767 | 1 |
| Apartment/Shops/Other Buildings | 153.35 | 1,651 | 30 |
| Apartment/Shops/Other Buildings | 148.55 | 1,599 | 34 |
| Apartment/Shops/Other Buildings | 127.35 | 1,371 | 3 |
| Apartment/Shops/Other Buildings | 290.55 | 3,127 | 1 |
| Apartment/Shops/Other Buildings | 274.02 | 2,950 | 1 |
| Apartment/Shops/Other Buildings | 22.50 | 242 | 1 |
| Apartment/Shops/Other Buildings | 34.99 | 377 | 1 |
| Apartment/Shops/Other Buildings | 6.50 | 70 | 1 |
| Apartment/Shops/Other Buildings | 25.24 | 272 | 1 |
| Apartment/Shops/Other Buildings | 27.15 | 292 | 1 |
| Apartment/Shops/Other Buildings | 17.91 | 193 | 1 |
Areas are as filed with HRERA.
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | ALREADY CONNECTED | Yes |
| Water Supply | MCG | Yes |
| Electricity | DHBVN | No |
| Sewage Disposal | GMDA | Yes |
| Storm Water Drainage | GMDA | Yes |
Facilities in the service plan
| Facility | Estimated cost | Status |
|---|---|---|
| Internal Roads And Pavements | ₹ 5.35 Cr | As Per Project Report |
| Water Supply System | ₹ 26.41 lakh | As Per Project Report |
| Storm Water Drainage | ₹ 67.93 lakh | As Per Project Report |
| Electricity Supply System | ₹ 4.84 Cr | As Per Project Report |
| Sewage Treatment & Garbage Disposal | ₹ 67.93 lakh | As Per Project Report |
| Street Lighting | ₹ 1.13 Cr | As Per Project Report |
| Security And Fire Fighting | ₹ 73.59 lakh | As Per Project Report |
| Club House/Community Centre | ₹ 89.47 Cr | As Per Project Report |
| Renewable Energy System | ₹ 53.59 lakh | As Per Project Report |
| Parking | ₹ 1.53 Cr | As Per Project Report |
| Stp | ₹ 91.74 lakh | As Per Project Report |
| Underground Water Tank | ₹ 37.73 lakh | As Per Project Report |
| Rain Water Harvesting | ₹ 4.17 Cr | As Per Project Report |
| Softscape | ₹ 5.93 Cr | As Per Project Report |
| Hardscape | ₹ 1.15 Cr | As Per Project Report |
| Electrical Substation | ₹ 15.28 Cr | As Per Project Report |
| Signages | ₹ 2.28 Cr | As Per Project Report |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| Building Plan | Already Been Obtained | 30 Mar 2026 |
| Conveyance Deed | Already Been Obtained | 17 Feb 2026 |
| Assurance Of Water Supply | Already Been Obtained | 17 Jun 2025 |
| Assurance For Sewerage Connection | Already Been Obtained | 10 Jul 2025 |
| Assurance For Storm Water | Already Been Obtained | 9 Jul 2025 |
| HUDA Construction | Already Been Obtained | 10 Jul 2025 |
| Aai | Already Been Obtained | 11 Mar 2025 |
| Forest Noc | Already Been Obtained | 9 Oct 2025 |
| Environment Clearance | Already Been Obtained | 9 Mar 2026 |
| Loi | Already Been Obtained | 23 Oct 2024 |
| Fire Scheme Approval | Applied For But Yet To Receive | 22 Apr 2026 |
Specifications (as filed)
| Flooring Details Of Various Parts Of House | Vitrified Tiling/Laminated Wooden Flooring/Skid Resistant Vitrified Tiles/Wooden Look Skid Resistant Tiles |
|---|---|
| Wall Finishing Details | Acrylic Emulsion Paint/Oil Bound Distemper |
| Kitchen Details | Floor: Vitrified Tiles, Wall: Tile Cladding 2' Above Counter And Oil Bound Distemper Above That, Ceiling: Oil Bound Distemper |
| Bathroom Fittings | Sanitary Fixtures & Fittings Of Repute Make |
| Wood Work Etc | Laminated/Painted Flush Doors/ Moulded Shutter With Wooden Frame |
| Doors And Windos Frames | Main Door: Designer Door Shutter With Veneer Finish Internal Doors: Laminated Door Shutter External Door & Windows: Glazed Windows Aluminum/ Upvc/Ms Frame |
| Glass Work | 4MM And Above As Per Specifications |
| Electric Fittings | As Per Building Norms |
| Conducting And Wiring Details | As Per Building Norms |
| Water Storage | Underground And Overhead Water Tanks |
| Lift Details | 4 Passenger Lifts And 1 Service Lift |
| Windows/Glazings | Powder Coated/Painted Aluminum/Upvc Windows With 4MM Or Above Thick Glazing As Per Specifications |
| Doors | Laminated/Painted Flush Doors/ Moulded Shutter With Wooden Frame |
| Main Doors | Laminated/Painted/Polished Flush Doors/ Moulded Shutter With Wooden Frame |
| Internal Doors | Laminated/Painted Flush Doors/ Moulded Shutter With Wooden Frame |
| Air Conditioning | As Per Specification Of Standard Make |
| Electrical Fittings | As Per Specification Of Standard Make |
| External Finishing/Colour Scheme | External Grade Paints |
| Internal Finishing | 10 To 12MM Thick Plaster On Blockworks, Rcc Walls And Columns With Cement Mortar Of 1:5 |
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.