Registration validHRERA Gurugram

Godrej Samaris

by Godrej Properties Limited · Gh-24, Urban Estate, Sector 53, Gurugram

RERA registration
GGM/1059/791/2026/31
Registered on
4 May 2026
Valid till
31 Aug 2033
Project ID
RERA-GRG-2216-2026
Apartments
494 in 1 tower
Completion (as filed)
31 Aug 2033
Estimated cost
₹ 3,646.75 Cr

RERA registration

Registration certificateGGM/1059/791/2026/31, dated 4 May 2026
Registration valid till31 Aug 2033
Project IDRERA-GRG-2216-2026
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameGodrej Samaris
PromoterGodrej Properties Limited
Promoter’s registered office3RD Floor, Plot No. 35, Um House, Sector 44, Gurugram, Haryana 122002
CINL74120MH1985PLC035308
Site addressGh-24, Urban Estate, Sector 53, Gurugram
SectorSector 53
Tehsil / DistrictWazirabad St / Gurugram
Layout plan approved30 Mar 2026
Building plans approved30 Mar 2026
Construction start (as filed)1 Apr 2026
Completion (as filed)31 Aug 2033
Application submitted2 Apr 2026

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Initial scrutinyFirst Hearing
Next hearingNot Required
  1. Application submitted online
  2. Notice sent to the promoter Deficiency notice
  3. Hearing Approved And Ready For Certificate Issuing Process View order
    Proceedings

    Sh. Sumeet, Engineering Officer and Ms. Asha, Chartered Accountant briefed about the facts of the project. Sh. Gautam Babbar (Regional Head), Sh. Ranjit Bhambhu (AR) and Ms. Anjana Gulati (AR) are present on behalf of the promoter. The Authorized Representative of the promoter states that HSVP has allotted a land parcel area measuring 7.413 acres (29999.46 sqm) to M/s Godrej Properties Limited vide conveyance deed no. 19437 dated 17.02.2026 and accordingly promoter obtained the approval of building plans for the project. The project site is located on 24 mt wide road and the road is metaled and motorable as on date. So, there is no need for separate access permission and affidavit to this affect has also been submitted to the Authority. Further states that the fire scheme approval, approved electrification plan, and mining permission are under process, and the said approvals have not yet been obtained as on date. Further, the Authorized Representative of the promoter undertakes to obtain and submit: i.           Fire Scheme approval within 3 months from the date of grant of registration; ii.         Approved Electrification plan within 3 months from the date of grant of registration; and iii.      Mining permission before start of construction of project. Further, he undertakes to submit the Demand Draft amounting to Rs. 25 lakhs, as a security deposit for timely compliance with the above requirements at point (i). It is also expressly undertaken that in the event of failure to obtain and submit the aforesaid approval within the stipulated time frame, the said security amount shall be liable to be forfeited by the Authority. The Authority has taken note of the submissions made by the AR of the promoter regarding the non-availability of the aforesaid statutory approvals as on date. In view of the above, and in the interest of regulatory compliance, the Authority hereby directs that the promoter shall submit the Demand Draft amounting to Rs. 25,00,000/- (Rupees Twenty-Five Lakhs only), in favour of the Authority as security amount for timely submission of fire scheme approval within 3 months from the date of grant of registration. In the event of non-submission of the above approval within the prescribed time frames, the said security amount shall stand forfeited by the Authority, and such failure may also attract additional regulatory action as permissible under the Act of 2016, rules and regulations made thereunder. Further, the promoter shall submit: 1.      Approved electrification plan within 3 months from the date of grant of registration; 2.      Mining permission before start of construction of project. Approved as proposed subject to rectification of deficiencies mentioned above. The Registration Certificate shall be issued after submission of the remaining deficiencies mentioned above including correction in Form A–H, online DPI and submission of Demand Draft of Rs. 25,00,000/- (Rupees Twenty-Five Lakhs only) for submission of fire scheme approval within the time frame mentioned above, along with the deficiency mentioned at S. No. 34.

  1. Registration granted GGM/1059/791/2026/31
  2. Certificate uploaded RC uploaded
  3. Registration valid till

Land, licence & cost

LicenceGroup Housing Site No. 24 in Sector-53 Gurugram Allotment from HSVP and Conveyance deed vide no. 19437 dated 12.02.2026
FAR permissible / proposed4.13 / 4.05
Estimated project cost₹ 3,646.75 Cr
Cost of land₹ 1,218.74 Cr
Cost of construction₹ 1,677.88 Cr
Infrastructure and other structures₹ 137.05 Cr
EDC, taxes, levies and other costs₹ 613.08 Cr

How the land will be used

UseArea (as filed)Share
Land Area To Be Used For Construction Of Apartments4,821.0316.1%
Construction Of Roads6,081.2120.3%
Electricity Sub-Station1,626.845.4%
Commercial147.710.5%
Stp768.92.6%
Rain538.231.8%
Softscapes4,463.6814.9%
Hardscapes6,534.0521.8%
Community5,017.7516.7%

Apartments 494 units · 1 tower

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings217.332,33931
Apartment/Shops/Other Buildings218.152,34834
Apartment/Shops/Other Buildings214.662,3113
Apartment/Shops/Other Buildings341.293,6741
Apartment/Shops/Other Buildings340.833,6691
Apartment/Shops/Other Buildings222.662,39731
Apartment/Shops/Other Buildings223.042,40134
Apartment/Shops/Other Buildings219.002,3573
Apartment/Shops/Other Buildings362.153,8981
Apartment/Shops/Other Buildings362.453,9011
Apartment/Shops/Other Buildings168.671,81633
Apartment/Shops/Other Buildings170.671,83730
Apartment/Shops/Other Buildings168.681,8161
Apartment/Shops/Other Buildings170.671,8371
Apartment/Shops/Other Buildings170.681,8373
Apartment/Shops/Other Buildings269.192,8981
Apartment/Shops/Other Buildings273.222,9411
Apartment/Shops/Other Buildings194.572,09434
Apartment/Shops/Other Buildings192.442,07129
Apartment/Shops/Other Buildings200.012,1535
Apartment/Shops/Other Buildings339.403,6531
Apartment/Shops/Other Buildings344.513,7081
Apartment/Shops/Other Buildings152.931,64634
Apartment/Shops/Other Buildings152.191,63830
Apartment/Shops/Other Buildings127.131,3683
Apartment/Shops/Other Buildings289.593,1171
Apartment/Shops/Other Buildings287.723,0971
Apartment/Shops/Other Buildings192.312,07034
Apartment/Shops/Other Buildings193.472,08229
Apartment/Shops/Other Buildings202.562,1805
Apartment/Shops/Other Buildings343.503,6971
Apartment/Shops/Other Buildings350.003,7671
Apartment/Shops/Other Buildings153.351,65130
Apartment/Shops/Other Buildings148.551,59934
Apartment/Shops/Other Buildings127.351,3713
Apartment/Shops/Other Buildings290.553,1271
Apartment/Shops/Other Buildings274.022,9501
Apartment/Shops/Other Buildings22.502421
Apartment/Shops/Other Buildings34.993771
Apartment/Shops/Other Buildings6.50701
Apartment/Shops/Other Buildings25.242721
Apartment/Shops/Other Buildings27.152921
Apartment/Shops/Other Buildings17.911931

Areas are as filed with HRERA.

External services

ServiceProvided byApproval taken
RoadsALREADY CONNECTEDYes
Water SupplyMCGYes
ElectricityDHBVNNo
Sewage DisposalGMDAYes
Storm Water DrainageGMDAYes

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 5.35 CrAs Per Project Report
Water Supply System₹ 26.41 lakhAs Per Project Report
Storm Water Drainage₹ 67.93 lakhAs Per Project Report
Electricity Supply System₹ 4.84 CrAs Per Project Report
Sewage Treatment & Garbage Disposal₹ 67.93 lakhAs Per Project Report
Street Lighting₹ 1.13 CrAs Per Project Report
Security And Fire Fighting₹ 73.59 lakhAs Per Project Report
Club House/Community Centre₹ 89.47 CrAs Per Project Report
Renewable Energy System₹ 53.59 lakhAs Per Project Report
Parking₹ 1.53 CrAs Per Project Report
Stp₹ 91.74 lakhAs Per Project Report
Underground Water Tank₹ 37.73 lakhAs Per Project Report
Rain Water Harvesting₹ 4.17 CrAs Per Project Report
Softscape₹ 5.93 CrAs Per Project Report
Hardscape₹ 1.15 CrAs Per Project Report
Electrical Substation₹ 15.28 CrAs Per Project Report
Signages₹ 2.28 CrAs Per Project Report

Statutory approvals

ApprovalStatusDate
Building PlanAlready Been Obtained30 Mar 2026
Conveyance DeedAlready Been Obtained17 Feb 2026
Assurance Of Water SupplyAlready Been Obtained17 Jun 2025
Assurance For Sewerage ConnectionAlready Been Obtained10 Jul 2025
Assurance For Storm WaterAlready Been Obtained9 Jul 2025
HUDA ConstructionAlready Been Obtained10 Jul 2025
AaiAlready Been Obtained11 Mar 2025
Forest NocAlready Been Obtained9 Oct 2025
Environment ClearanceAlready Been Obtained9 Mar 2026
LoiAlready Been Obtained23 Oct 2024
Fire Scheme ApprovalApplied For But Yet To Receive22 Apr 2026

Specifications (as filed)

Flooring Details Of Various Parts Of HouseVitrified Tiling/Laminated Wooden Flooring/Skid Resistant Vitrified Tiles/Wooden Look Skid Resistant Tiles
Wall Finishing DetailsAcrylic Emulsion Paint/Oil Bound Distemper
Kitchen DetailsFloor: Vitrified Tiles, Wall: Tile Cladding 2' Above Counter And Oil Bound Distemper Above That, Ceiling: Oil Bound Distemper
Bathroom FittingsSanitary Fixtures & Fittings Of Repute Make
Wood Work EtcLaminated/Painted Flush Doors/ Moulded Shutter With Wooden Frame
Doors And Windos FramesMain Door: Designer Door Shutter With Veneer Finish Internal Doors: Laminated Door Shutter External Door & Windows: Glazed Windows Aluminum/ Upvc/Ms Frame
Glass Work4MM And Above As Per Specifications
Electric FittingsAs Per Building Norms
Conducting And Wiring DetailsAs Per Building Norms
Water StorageUnderground And Overhead Water Tanks
Lift Details4 Passenger Lifts And 1 Service Lift
Windows/GlazingsPowder Coated/Painted Aluminum/Upvc Windows With 4MM Or Above Thick Glazing As Per Specifications
DoorsLaminated/Painted Flush Doors/ Moulded Shutter With Wooden Frame
Main DoorsLaminated/Painted/Polished Flush Doors/ Moulded Shutter With Wooden Frame
Internal DoorsLaminated/Painted Flush Doors/ Moulded Shutter With Wooden Frame
Air ConditioningAs Per Specification Of Standard Make
Electrical FittingsAs Per Specification Of Standard Make
External Finishing/Colour SchemeExternal Grade Paints
Internal Finishing10 To 12MM Thick Plaster On Blockworks, Rcc Walls And Columns With Cement Mortar Of 1:5

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Godrej Samaris?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.