Registration validHRERA Gurugram

Godrej Alira

by Godrej Properties Limited · Gh-01, Urban Estate II, Sector 39, Gurugram

RERA registration
GGM/959/691/2025/62
Registered on
26 Jun 2025
Valid till
30 Apr 2032
Project ID
RERA-GRG-1943-2025
Land area
1.975 acres
Apartments
134 in 1 tower
Completion (as filed)
30 Apr 2032
Estimated cost
₹ 586.82 Cr

RERA registration

Registration certificateGGM/959/691/2025/62, dated 26 Jun 2025
Registration valid till30 Apr 2032
Project IDRERA-GRG-1943-2025
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameGodrej Alira
PromoterGodrej Properties Limited
Promoter’s registered office3RD Floor, Um House, Plot No. 35-P, Sector 44, Gurugram-122002
CINL74120MH1985PLC035308
Site addressGh-01, Urban Estate II, Sector 39, Gurugram
SectorSector 39
Tehsil / DistrictWazirabad St / Gurugram
Building plans approved1 May 2025
Construction start (as filed)1 Oct 2025
Completion (as filed)30 Apr 2032
Application submitted20 May 2025

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Initial scrutinyFirst hearing
Next hearingNot Required
  1. Application submitted online
  2. Notice sent to the promoter Dispatched
  3. Hearing Approved And Ready For Certificate Issuing Process View order
    Proceedings

    Ar. Neeraj Gautam, Associate Architectural Executive and Ms. Asha, Chartered Accountant briefed about the facts of the project. Sh. Rohan (AR), Ms. Surabhi Kapoor (AR), Sh. Ayush Gupta (AR) are present on behalf of the promoter. It is noticed by the Authority that an advertisement for booking of the apartment in above project is on the website with the link https://www.godrejupcominglaunch.com/ which is in contravention with the section 3 of the Act of 2016. The AR submits that no advertisement has been issued by the promoter as the only authorized website of the promoter is www.godrejproperties.com and legal action against such unauthorized advertisements has already been taken and its details shall be submitted to the Authority. A show cause notice be issued for reply to the same along with action taken for the above advertisement including a disclaimer in the newspaper. No objection in respect of the public notice issued by the Authority on 28.05.2025 has been received and the site is purchased through open auction from HSVP with public health amenities in place. The registration of the project is approved as proposed subject to the submission of BG/DD of Rs. 25 lakhs each on account of submission of approved fire scheme and EC within four months. The RC shall be issued after the submission of rectified REP-I and above security amount.

  1. Registration granted GGM/959/691/2025/62
  2. Certificate uploaded RC Uploaded
  3. Registration valid till

Land, licence & cost

Land area of the project1.975 acres
Total licensed area1.975 acres
LicenceGH-01 of Sector 39
FAR permissible / proposed312 / 311
Estimated project cost₹ 586.82 Cr
Cost of land₹ 160.48 Cr
Cost of construction₹ 290.83 Cr
Infrastructure and other structures₹ 31.85 Cr
EDC, taxes, levies and other costs₹ 103.66 Cr

How the land will be used

UseSq mShare
Land Area To Be Used For Construction Of Apartments1,098.3213.7%
Construction Of Roads2,025.8625.4%
Parks And Playgrounds632.127.9%
Green Belts1,838.8923%
Vehicle Parkings21.450.3%
Club House342.734.3%
Sewage And Solid Waste Treatment Facility207.22.6%
Water Supply System74.870.9%
Storm Water Drainage210.032.6%
Street Lighting50.180.6%
Electricity Supply System74.870.9%
Security And Fire Fighting150.951.9%
Renewable Energy System199.912.5%
Rain Water Harvesting80.941%
Hardscape982.212.3%

Apartments 134 units · 1 tower

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings8,052.20-66
Apartment/Shops/Other Buildings3,000.63-19
Apartment/Shops/Other Buildings2,210.9923,79914
Apartment/Shops/Other Buildings5,024.36-31
Apartment/Shops/Other Buildings256.932,7662
Apartment/Shops/Other Buildings26.302832

Areas are as filed with HRERA. Some rows show a total built-up area rather than one home’s carpet area, as entered by the promoter.

External services

ServiceProvided byApproval taken
RoadsGMDANo
Water SupplyMCGYes
ElectricityDHBVNYes
Sewage DisposalMCGYes
Storm Water DrainageGMDAYes

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 1.8 CrYet To Be Prepared
Water Supply System₹ 8.89 lakhYet To Be Prepared
Storm Water Drainage₹ 22.85 lakhYet To Be Prepared
Electricity Supply System₹ 3.86 CrYet To Be Prepared
Sewage Treatment & Garbage Disposal₹ 22.85 lakhYet To Be Prepared
Street Lighting₹ 38.09 lakhYet To Be Prepared
Security And Fire Fighting₹ 1.63 CrYet To Be Prepared
Playgrounds And Parks₹ 76.65 lakhYet To Be Prepared
Club House/Community Centre₹ 10.9 CrYet To Be Prepared
Shopping Area₹ 1.67 CrYet To Be Prepared
Renewable Energy System₹ 24.76 lakhYet To Be Prepared
Parking₹ 18.03 lakhYet To Be Prepared
Sewerage Treatment Plant₹ 51.44 lakhYet To Be Prepared
Underground Water Tank₹ 30.86 lakhYet To Be Prepared
Rain Water Harvesting₹ 12.69 lakhYet To Be Prepared
Soft Scape₹ 1.4 CrYet To Be Prepared
Hard Scape₹ 5.14 CrYet To Be Prepared
Electrical Sub Station₹ 1.99 CrYet To Be Prepared
Signages₹ 38.58 lakhYet To Be Prepared

Statutory approvals

ApprovalStatusDate
Building PlansAlready Been Obtained1 May 2025
Possession CertificateAlready Been Obtained7 Apr 2025
Allotment LetterAlready Been Obtained22 Jan 2025
Zoning PlanAlready Been Obtained14 Jan 2025

Specifications (as filed)

Flooring Details Of Various Parts Of HouseVitrified Tiling/Laminated Wooden Flooring/Skid Resistant Vitrified Tiles/Wooden Look Skid Resistant Tiles
Wall Finishing DetailsAcrylic Emulsion Paint/Oil Bound Distemper
Kitchen DetailsFloor: Vitrified Tiles, Wall: Tile Cladding 2' Above Counter And Oil Bound Distemper Above That, Ceiling: Oil Bound Distemper
Bathroom FittingsSanitary Fixtures & Fittings Of Repute Make
Wood Work EtcLaminated/Painted Flush Doors/ Moulded Shutter With Wooden Frame
Doors And Windos FramesMain Door: Designer Door Shutter With Veneer Finish Internal Doors: Laminated Door Shutter External Door & Windows: Glazed Windows Aluminum/ Upvc/Ms Frame
Glass Work4MM And Above As Per Specifications
Electric FittingsAs Per Building Norms
Conducting And Wiring DetailsAs Per Building Norms
Water StorageUnderground And Overhead Water Tanks
Lift Details3 Passenger Lifts And 1 Service Lift
Windows/GlazingsPowder Coated/Painted Aluminum/Upvc Windows With 4MM Or Above Thick Glazing As Per Specifications
DoorsLaminated/Painted Flush Doors/ Moulded Shutter With Wooden Frame
Main DoorsLaminated/Painted/Polished Flush Doors/ Moulded Shutter With Wooden Frame
Internal DoorsLaminated/Painted Flush Doors/ Moulded Shutter With Wooden Frame
Air ConditioningAs Per Specification Of Standard Make
Electrical FittingsAs Per Specification Of Standard Make
External Finishing/Colour SchemeExternal Grade Paints
Internal Finishing10 To 12MM Thick Plaster On Blockworks, Rcc Walls And Columns With Cement Mortar Of 1:5

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Godrej Alira?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.