HearingExamination By AuthorityView order Proceedings
Sh. Sumeet, Engineering Officer and Ms. Asha, Chartered Accountant briefed about the facts of the project. Ms. Anjana Gulati, Ms. Ekansh Mishra, Sh. Ranjit and Sh. Sumit Khatri are present on behalf of the promoter. A public notice regarding registration of project was issued in three newspapers dated 15.07.2025 against which no objections have been received in the Authority and none appeared in person before the Authority today i.e., 04.08.2025. The site of project has been inspected by the concerned official of the Authority and it is reported that the project site has access from 18 mt wide road only which is connected to Golf Course Road. The road is operational as on date yet road access permission has not been submitted by the promoter. As the road access permission has not been submitted, the promoter is directed to submit the status of 18 mt road with documentary proof i.e., either the road is revenue road or the promoter has obtained any access permission for the same. The promoter is also directed to submit the remaining deficit documents before next date of hearing. The matter to come up on 11.08.2025.
HearingApproved And Ready For Certificate Issuing ProcessView order Proceedings
Sh. Sumeet, Engineering Officer and Ms. Asha, Chartered Accountant briefed about the facts of the project. Ms. Anjana Gulati, Sh. Gautam Babbar and Sh. Ranjit Bhambhu are present on behalf of the promoter. The AR of the promoter submits the clarification for road access permission issued by DTP, Gurugram dated 08.08.2025 wherein it is submitted that the Group Housing Site (GH-21) is approachable from existing revenue rasta (proposed to be widened upto 18 mt wide road from its existing width) as per layout plan of Sector-52A & 53, Gurugram bearing drawing no. DTP(G) 2200/2014 dated 05.06.2014. Further, as on date the 18 mt wide road is constructed upto project site. Further the promoter states that they will submit the DD of Rs 25 lakh each as a security amount for submission of approved environment clearance and fire scheme approval within four months from the issuance of registration certificate. Approved as proposed. The Registration Certificate shall be issued upon submission of the corrected Forms A to H, DPI, and compliance with other requirements as mentioned above.
Registration grantedGGM/976/708/2025/79
Certificate uploadedRC Uploaded
Registration valid till
Land, licence & cost
Licence
Group Housing Site No. 21 in Sector-53 Gurugram
FAR permissible / proposed
4.12 / 4.1
Estimated project cost
₹ 1,570.18 Cr
Cost of land
₹ 469.32 Cr
Cost of construction
₹ 785.65 Cr
Infrastructure and other structures
₹ 61.41 Cr
EDC, taxes, levies and other costs
₹ 253.8 Cr
How the land will be used
Use
Area (as filed)
Share
Land Area To Be Used For Construction Of Apartments
Laminated/Painted Flush Doors/ Moulded Shutter With Wooden Frame
Doors And Windos Frames
Main Door: Designer Door Shutter With Veneer Finish Internal Doors: Laminated Door Shutter External Door & Windows: Glazed Windows Aluminum/ Upvc/Ms Frame
Glass Work
4MM And Above As Per Specifications
Electric Fittings
As Per Building Norms
Conducting And Wiring Details
As Per Building Norms
Water Storage
Underground And Overhead Water Tanks
Lift Details
3 Passenger Lifts And 1 Service Lift
Windows/Glazings
Powder Coated/Painted Aluminum/Upvc Windows With 4MM Or Above Thick Glazing As Per Specifications
Doors
Laminated/Painted Flush Doors/ Moulded Shutter With Wooden Frame
Main Doors
Laminated/Painted/Polished Flush Doors/ Moulded Shutter With Wooden Frame
Internal Doors
Laminated/Painted Flush Doors/ Moulded Shutter With Wooden Frame
Air Conditioning
As Per Specification Of Standard Make
Electrical Fittings
As Per Specification Of Standard Make
External Finishing/Colour Scheme
External Grade Paints
Internal Finishing
10 To 12MM Thick Plaster On Blockworks, Rcc Walls And Columns With Cement Mortar Of 1:5
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Godrej Sora?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.