Woodview Residencies
by Orris Infrastructure Private Limited · Sector 89-90, Gurugram
- RERA registration
- GGM/418/150/2020/34
- Registered on
- 6 Oct 2020
- Valid till
- 15 Jul 2023
- Project ID
- RERA-GRG-640-2020
- Land area
- 114.506 acres
- Estimated cost
- ₹ 397.1 Cr
RERA registration
| Registration certificate | GGM/418/150/2020/34, dated 6 Oct 2020 |
|---|---|
| Registration valid till | 15 Jul 2023 |
| Project ID | RERA-GRG-640-2020 |
| Authority | HRERA Gurugram |
| Project type (as filed) | Ongoing |
| Project name | Woodview Residencies |
| Promoter | Orris Infrastructure Private Limited |
| Promoter’s registered office | J-10/5,DLF Phase-2, Mg Road , Gurugram , Haryana-122002 |
| CIN | U70109DL2006PTC151295 |
| Site address | Sector 89-90, Gurugram |
| Sector | Sector 89 |
| Tehsil / District | Gurgaon / Gurugram |
| Layout plan approved | 2 Aug 2019 |
| Application submitted | 16 Jun 2020 |
Authority, hearings & orders
- Application submitted online
- Application received by HRERA Gurugram
-
Hearing
Examination By Authority
Proceedings
Next date of hearing on 05.08.2020
-
Hearing
Adjournment
Proceedings
Adjourned for 13.08.2020.
-
Hearing
Adjournment
Proceedings
During online hearing, Ms. Priyanka Aggarwal is present on behalf of the promoter. The promoter is directed to submit the deficit documents along with corrected detailed project report. The promoter has applied for the registration of 60.1055 acres plotted colony out of the total licensed area measuring 114.506 acres. The promoter has divided the total licensed area into 3 phases but regarding projects to be developed in phases following provision exists in rule 14 (1) (e) (i) (A) to be published on the website of the authority “authenticated copy of the license or land use permission, sanctioned building(s) plan and other sanctions from the competent authority obtained in accordance with the laws applicable and where the project is proposed to be developed in phases, an authenticated copy of the license or land use permission, sanctioned layout plan/building(s) plan as the case may be for each of such phase(s)” Accordingly, the registration of above phase is not considered by the authority without approvals as quoted above phase wise which needs to be obtained by the promoter from Director of Town and Country Planning, Haryana. Also, out of 3 phases, phase 1 measuring an area 3.86 acres is registered vide RC no. 38 of 2018, phase 2 measuring an area 50.54 acres applied for registration by M/s Bright Buildtech Pvt Ltd and phase 3 measuring an area 60.1055 acres applied for registration by M/s Orris Infrastructure Pvt Ltd. The promoter is required to submit the status of internal development work along with details of sold and unsold inventory on the affidavit. The authority has decided to come up the matter on 01.09.2020
-
Hearing
Objection
Proceedings
During online hearing, Ms. Priyanka Aggarwal is present on behalf of the promoter. The promoter is directed to submit the deficit documents along with corrected detailed project report. The promoter has applied for the registration of 60.1055 acres plotted colony out of the total licensed area measuring 114.506 acres. The promoter has divided the total licensed area into 3 phases but regarding projects to be developed in phases following provision exists in rule 14 (1) (e) (i) (A) to be published on the website of the authority “authenticated copy of the license or land use permission, sanctioned building(s) plan and other sanctions from the competent authority obtained in accordance with the laws applicable and where the project is proposed to be developed in phases, an authenticated copy of the license or land use permission, sanctioned layout plan/building(s) plan as the case may be for each of such phase(s)” Accordingly, the registration of above phase is not considered by the authority without approvals as quoted above phase wise which needs to be obtained by the promoter from Director of Town and Country Planning, Haryana. Also, out of 3 phases, phase 1 measuring an area 3.86 acres is registered vide RC no. 38 of 2018, phase 2 measuring an area 50.54 acres applied for registration by M/s Bright Buildtech Pvt Ltd and phase 3 measuring an area 60.1055 acres applied for registration by M/s Orris Infrastructure Pvt Ltd. The promoter is required to submit the status of internal development work along with details of sold and unsold inventory on the affidavit. The authority has decided to come up the matter on 09.09.2020.
-
Hearing
Adjournment
Proceedings
The matter fixed for 06.10.2020
-
Hearing
Adjournment
Proceedings
During the online hearing, Mr. Akhil Aggrawal (General Manager) representative of the promoter was present. It has come to the notice of the authority that the promoter has still not removed the deficiencies conveyed to them through 1st deficiency notice dated 20.01. 2020.Therefore, the authority has decided to issue a show cause for rejection of the application of the registration of the project.
- Registration granted GGM/418/150/2020/34
- Certificate uploaded RC Approved and Certificate Uploaded
-
Hearing
Approved And Ready For Certificate Issuing Process
Proceedings
The promoter is directed to submit the binded copy of DPI cum declaration.
- Hearing Objection
- Registration valid till
Land, licence & cost
| Land area of the project | 114.506 acres |
|---|---|
| Total licensed area | 114.506 acres |
| Licence | 59 of 2013 and 115 0f 2019 |
| FAR permissible / proposed | 0 / 0 |
| Estimated project cost | ₹ 397.1 Cr |
| Cost of land | ₹ 175.57 Cr |
| Infrastructure and other structures | ₹ 27.67 Cr |
| EDC, taxes, levies and other costs | ₹ 193.86 Cr |
How the land will be used
| Use | Acres | Share |
|---|---|---|
| Plots To Be Sold | 56.02 | 48.9% |
| Construction Of Roads | 33.602 | 29.3% |
| Parks And Playgrounds | 7.813 | 6.8% |
| Electricity Sub-Station | 0.1 | 0.1% |
| Club House | 2 | 1.7% |
| Sewage And Solid Waste Treatment Facility | 0.4 | 0.3% |
| Hospital | 1.256 | 1.1% |
| School | 6.67 | 5.8% |
| Taxi | 1.05 | 0.9% |
| Religious | 0.2 | 0.2% |
| Milk | 0.297 | 0.3% |
| Creche | 0.2 | 0.2% |
| Nursing | 1.004 | 0.9% |
| Milk | 0.03 | 0% |
| Commercial | 3.86 | 3.4% |
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | HUDA | No |
| Water Supply | HUDA | Yes |
| Electricity | DHBVN | Yes |
| Sewage Disposal | HUDA | No |
| Storm Water Drainage | HUDA | No |
Facilities in the service plan
| Facility | Estimated cost | Status |
|---|---|---|
| Internal Roads And Pavements | ₹ 6.84 Cr | Submitted To Town & Country Planning |
| Water Supply System | ₹ 1.54 Cr | Submitted To Town & Country Planning |
| Storm Water Drainage | ₹ 2.29 Cr | Submitted To Town & Country Planning |
| Sewage Treatment & Garbage Disposal | ₹ 78.03 lakh | Submitted To Town & Country Planning |
| Street Lighting | ₹ 1.15 Cr | As Per Project Report |
| Security And Fire Fighting | ₹ 7.42 Cr | As Per Project Report |
| Playgrounds And Parks | ₹ 57.52 lakh | Submitted To Town & Country Planning |
| Club House/Community Centre | ₹ 21 Cr | Yet To Be Prepared |
| Renewable Energy System | ₹ 1.76 Cr | Yet To Be Prepared |
| School | ₹ 9.3 Cr | Yet To Be Prepared |
| Hospital/Dispensary | ₹ 4.3 Cr | Yet To Be Prepared |
| Stp | ₹ 1.82 Cr | Yet To Be Prepared |
| Ug Tank | ₹ 1.54 Cr | Yet To Be Prepared |
| Rwh | ₹ 77.22 lakh | Yet To Be Prepared |
| Electrical Sub Station | ₹ 1.17 Cr | Yet To Be Prepared |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| Forest | Already Been Obtained | 20 Jan 2014 |
| Electrical Load Availability | Already Been Obtained | 25 Jun 2020 |
| License | Already Been Obtained | 17 Jul 2013 |
| License | Already Been Obtained | 12 Sep 2019 |
| Environment Clearance | Already Been Obtained | 17 Oct 2014 |
| Service Estimate Plan | Already Been Obtained | 13 Jan 2014 |
| Revised Service Estimate Plan | Applied For But Yet To Receive | 14 Oct 2020 |
| Revised Environment Clearance | Applied For But Yet To Receive | 19 Oct 2019 |
Specifications (as filed)
| Flooring Details Of Various Parts Of House | N/A |
|---|---|
| Wall Finishing Details | N/A |
| Kitchen Details | N/A |
| Bathroom Fittings | N/A |
| Wood Work Etc | N/A |
| Doors And Windos Frames | N/A |
| Glass Work | N/A |
| Electric Fittings | N/A |
| Conducting And Wiring Details | N/A |
| Cupboard Details | N/A |
| Water Storage | N/A |
| Lift Details | N/A |
| External Glazings | N/A |
| Windows/Glazings | N/A |
| Doors | N/A |
| Main Doors | N/A |
| Internal Doors | N/A |
| Air Conditioning | N/A |
| Electrical Fittings | N/A |
| Cng Pipe Line | N/A |
| Provision Of Wifi And Broadband Facility | N/A |
| External Finishing/Colour Scheme | N/A |
| Internal Finishing | N/A |
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.