Orchid Ivy
by M/S Orchid Infrastructure Developers Pvt. Ltd. · M Block, Mayfield Garden, Sector-51, Gurgaon, Haryana
- RERA registration
- GGM/597/329/2022/72
- Registered on
- 1 Aug 2022
- Valid till
- 31 Dec 2026
- Project ID
- RERA-GRG-996-2021
- Apartments
- 76 in 19 towers
- Plots
- 19
- Completion (as filed)
- 31 Dec 2025
- Estimated cost
- ₹ 59.83 Cr
RERA registration
| Registration certificate | GGM/597/329/2022/72, dated 1 Aug 2022 |
|---|---|
| Registration valid till | 31 Dec 2026 |
| Project ID | RERA-GRG-996-2021 |
| Authority | HRERA Gurugram |
| Project type (as filed) | New |
| Project name | Orchid Ivy |
| Promoter | M/S Orchid Infrastructure Developers Pvt. Ltd. |
| Promoter’s registered office | Level II Global Arcade, Mehrauli Gurgaon Road, Gurugram |
| CIN | U40102DL1993PTC052875 |
| Site address | M Block, Mayfield Garden, Sector-51, Gurgaon, Haryana |
| Sector | Sector 51 |
| Tehsil / District | Gurgaon / Gurugram |
| Layout plan approved | 24 Oct 2017 |
| Building plans approved | 23 Feb 2022 |
| Construction start (as filed) | 2 Apr 2022 |
| Completion (as filed) | 31 Dec 2025 |
| Application submitted | 28 Feb 2022 |
Authority, hearings & orders
- Application submitted online
- Application received by HRERA Gurugram
- Notice sent to the promoter Show cause notice
-
Hearing
Examination By Authority
Proceedings
Ms. Prachi Singh Planning Executive briefed about the case.Sh. Dhruv Gupta (Director), Sh. Ajay Goel (Director) and Sh. Arun Nijhawan (VP) are present onbehalf of the promoter.The promoter has applied for registration of the residential floors project namely “Orchid IvyFloors” dated 12.11.2021 comprising of 79 residential plots situated at M-Block, Mayfield Gardens,Sector-51, Gurugram, Haryana. Further, the promoter has submitted the request of withdrawn ofthe application of registration of project in the hearing held on 20.12.2021 mentioning the reasonfor the same and which was allowed by the authority.The promoter has resubmitted the fresh application for registration of 19 plots on 04.03.2022under Section 4 of the Real Estate (Regulation and Development) Act, 2016.On scrutiny of the application, some of the deficiencies and observations were observed whichwere conveyed to the promoter vide notice no. HARERA/GGM/RPIN/403/show cause dated08.04.2022. The promoter has submitted the reply dated 26.04.2022 which be scrutinized in theoffice and legal opinion w.r.t. the ownership through the court decree be obtained. The promoterwas also advised to submit his arguments regarding admissibility to apply for registration andprovisioning of services to the prospective buyers/allottees as CC or Part CC of the said colony isnot yet received.The matter to come up on 23.05.2022.
-
Hearing
Adjournment
Proceedings
Ms. Prachi Singh Planning Executive briefed about the case. Sh. Dhruv Gupta (Director) and Ajay Goel (Director) are present on behalf of the promoter, who requests for short adjournment to clarify the issue of obtaining title over the plots where floors are to be constructed for floor wise sale and applied for registration. In view of above request, the case is adjourned to 30.05.2022.
-
Hearing
Adjournment
Proceedings
Ms. Prachi Singh Planning Executive briefed about the case. Sh. Dhruv Gupta (MD), Sh. Arun Kumar (Sr.VP) and Sh. Ajay Goel (Director) are present on behalf of the promoter. The promoter has applied for registration of the residential floors project namely “Orchid Ivy Floors” Dated 12.11.2021 comprising of 79 residential plots situated at M-Block, Mayfield Gardens, Sector-51, Gurugram, Haryana. Further, the promoter has submitted the request of withdrawn of the application of registration of project in the hearing held on 20.12.2021 mentioning the reason for the same and which was allowed by the authority. The promoter has resubmitted the fresh application for registration of 19 plots on 04.03.2022 under Section 4 of the Real Estate (Regulation and Development) Act, 2016. On scrutiny of the application, some of the deficiencies and observations were observed which were conveyed to the promoter vide notice no. HARERA/GGM/RPIN/403/show cause dated 08.04.2022. The promoter has submitted the reply dated 26.04.2022 and 19.05.20222. On hearing dated 16.05.2022, the promoter was directed to submit his arguments regarding admissibility to apply for registration and provisioning of services to the prospective buyers/allottees as CC or Part CC of the said colony is not yet received. Further, on hearing dated 23.05.2022, the promoter requested short adjournment to clarify the issue of obtaining title over the plots where floors are to be constructed for floor wise sale and applied for registration. The matter to come up on 06.06.2022.
-
Hearing
Adjournment
Proceedings
Ms. Prachi Singh Planning Executive briefed about the case.Sh. Anil Behl (Executive Director), Sh. Ajay Goyal (Director) and Sh. Arun Kumar Nijhawan (Sr. VP) arepresent on behalf of promoter.The matter is adjourned and to come up on 13.06.2022.
-
Hearing
Adjournment
Proceedings
Coram is incomplete. The matter is adjourned to 27.06.2022.
-
Hearing
Adjournment
Proceedings
The matter is adjourned to 11.07.2022.
-
Hearing
Adjournment
Proceedings
Ms. Prachi Singh Planning Executive briefed about the case.Sh. Dhruv Gupta (MD), Sh. Arun Kumar (Sr.VP) and Sh. Ajay Goel (Director) are present on behalf ofthe promoter.The matter stand referred for opinion of Ld. Additional Advocate General, Haryana, which is stillawaited.The matter to come up on 18.07.2022.
-
Hearing
Adjournment
Proceedings
Proceedings dated: 18.07.2022 Ms. Prachi Singh, Planning Executive briefed about the facts of the project. Sh. Arjun Nijhawan (AR) and Sh. Keshav Gupta (AR) are present on behalf of the promoter. The matter stand referred for opinion of Ld. Additional Advocate General, Haryana, which is still awaited. Additional information is sought for by AAG which is being sent to him. The matter to come up on 25.07.2022. Vijay Goyal (Member)KK Khandelwal (Chairman)
-
Hearing
Objection
Proceedings
Due to the administrative work of the authority, the matter is adjourned for 27.07.2022.
-
Hearing
Adjournment
Proceedings
Proceedings dated: 27.07.2022Ms. Prachi Singh, Planning Executive briefed about the facts of the project.Sh. Ajay Goel (Director), Sh. Arun Nijhawan (Sr.VP) and Sh. Keshav Gupta (Legal Associate) are present onbehalf of the promoter.The legal opinion sought from Addl. AG Haryana has been received and taken on record and it has beenadvised to consider registration of the project in the interest of allottees and also clarified that legal title ofthe applicant stands duly proved by way of decree passed by the competent court. The building plans of theplots proposed for floorwise construction already stand approved by the competent authority and are validupto 22.02.2024. The Authority decides to grant in principle the registration of the project subject torectification of the errors/deficiencies conveyed in the above office note and to come up on 01.08.2022 forconfirmation and compliance.
-
Hearing
Approved And Ready For Certificate Issuing Process
Proceedings
The promoter has applied earlier for registration of the residential floors project namely “Orchid Ivy Floors” dated 12.11.2021 comprising of 79 residential plots situated at M-Block, Mayfield Gardens, Sector-51, Gurugram, Haryana. Further, the promoter has submitted the request of withdrawn of the application of registration of project in the hearing held on 20.12.2021 mentioning the reason for the same and which was allowed by the authority. The promoter later resubmitted the fresh application for registration of 19 plots instead of 79 plots on 04.03.2022 under Section 4 of the Real Estate (Regulation and Development) Act, 2016. On scrutiny of the application, few of the deficiencies and observations were observed primarily w.r.t. the legal capacity of the applicant which were conveyed to the promoter vide notice no. HARERA/GGM/RPIN/403/show cause dated 08.04.2022. The promoter submitted the reply dated 26.04.2022,19.05.2022 and 07.06.2022 along with a court decree. The ambiguity w.r.t. the legal title still persisted. Therefore, during the hearing dated 27.06.2022, the authority referred the matter including court decree for legal clarification to Mr. Ankur Mittal (AAG). The legal opinion sought from Addl. AG Haryana has been received dated 25.07.2022 and taken on record and it has been advised by the AAG to consider registration of the project in the interest of allottees and also clarified that legal title ofthe applicant stands duly proved by way of decree passed by the competent court. During the hearing dated 27.07.2022, the Authority decides to grant in principle the registration of the project subject to rectification of the errors/deficiencies conveyed in the above office note and to come up on 01.08.2022 for confirmation and compliance. In compliance of the directions of the authority, the reply submitted by the promoter on the same day of hearing, which was scrutinized, and all the deficiencies are removed by the promoter. Keeping in view, the above facts the authority may grant the registration certificate to the promoter.
- Registration granted GGM/597/329/2022/72
- Registration valid till
Land, licence & cost
| Licence | N/A |
|---|---|
| FAR permissible / proposed | 10963.26 / 264 |
| Estimated project cost | ₹ 59.83 Cr |
| Cost of land | ₹ 13.77 Cr |
| Cost of construction | ₹ 37.62 Cr |
| Infrastructure and other structures | ₹ 1.5 Cr |
| EDC, taxes, levies and other costs | ₹ 6.95 Cr |
How the land will be used
| Use | Area (as filed) | Share |
|---|---|---|
| Land Area To Be Used For Construction Of Apartments | 4,152.75 | 100% |
Apartments 76 units · 19 towers
| Type | Carpet area (sq m) | Carpet area (sq ft) | Units |
|---|---|---|---|
| Apartment/Shops/Other Buildings | 9,572.52 | - | 76 |
Areas are as filed with HRERA. Some rows show a total built-up area rather than one home’s carpet area, as entered by the promoter.
Plots 19 plots
| Plot size (sq m) | Sq yd | Sq ft | Plots |
|---|---|---|---|
| 215.25 | 257 | 2,317 | 1 |
| 4,152.75 | 4,967 | 44,700 | 18 |
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | ALREADY LAID AND EXISTING | Yes |
| Water Supply | ALREADY LAID AND EXISTING | Yes |
| Electricity | ALREADY LAID AND EXISTING | Yes |
| Sewage Disposal | ALREADY LAID AND EXISTING | Yes |
| Storm Water Drainage | ALREADY LAID AND EXISTING | Yes |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| Building Plan M-727 | Already Been Obtained | 22 Feb 2022 |
| Building Plan M-728 | Already Been Obtained | 22 Feb 2022 |
| Building Plan M-729 | Already Been Obtained | 22 Feb 2022 |
| Building Plan M-730 | Already Been Obtained | 22 Feb 2022 |
| Building Plan M-731 | Already Been Obtained | 22 Feb 2022 |
| Building Plan M-732 | Already Been Obtained | 22 Feb 2022 |
| Building Plan M-733 | Already Been Obtained | 22 Feb 2022 |
| Building Plan M-734 | Already Been Obtained | 22 Feb 2022 |
| Building Plan M-735 | Already Been Obtained | 27 Oct 2021 |
| Building Plan M-736 | Already Been Obtained | 6 Dec 2021 |
| Building Plan M-737 | Already Been Obtained | 3 Dec 2021 |
| Building Plan M-738 | Already Been Obtained | 3 Dec 2021 |
| Building Plan M-739 | Already Been Obtained | 17 Jan 2022 |
| Building Plan M-740 | Already Been Obtained | 22 Feb 2022 |
| Building Plan M-741 | Already Been Obtained | 22 Feb 2022 |
| Building Plan M-742 | Already Been Obtained | 23 Feb 2022 |
| Building Plan M-743 | Already Been Obtained | 14 Mar 2022 |
| Building Plan M-744 | Already Been Obtained | 23 Feb 2022 |
| Building Plan M-745 | Already Been Obtained | 23 Feb 2022 |
Specifications (as filed)
| Flooring Details Of Various Parts Of House | Marble/ Vitrified Tiles/Matt Finish Tiles/ Anti Skid Ceramic Tiles |
|---|---|
| Wall Finishing Details | Pop Punning Finished With Plastic/Acrylic Emulsion Paint /Obd |
| Kitchen Details | Modular Kitchen With SS Sink And C.p Fittings , Ceramic Tiles In Ddo 2 Ft. Above Granite Counter |
| Bathroom Fittings | Superior Chinaware And C.p Fittings |
| Wood Work Etc | Seasoned Wood Door Frames |
| Doors And Windos Frames | Windows Frames In Powder Coated Aluminium Or Equivalent / Upvc And Door Frames In Marandi / Hardwood |
| Glass Work | 4-6 Mm Thick Glass Work In Windows Flazing |
| Electric Fittings | Superior Isi Approved / Equivalent Fittings |
| Conducting And Wiring Details | Pvc Conduit And Copper Wiring |
| Cupboard Details | N/A |
| Water Storage | As Per Design |
| Lift Details | Passenger Elevator- 08 Persons |
| External Glazings | Powder Coated Al/Upvc With 4-6 Mm Thick Glass |
| Windows/Glazings | 4-6 Mm Thick Glass |
| Doors | Flush Door Shutters |
| Main Doors | Modular Flush Door/ Paneled Oor |
| Internal Doors | Flush Doors/ Laminated Flush Doors |
| Air Conditioning | Split Inverter Acs |
| Electrical Fittings | N/A |
| Cng Pipe Line | Provision To Be Left |
| Provision Of Wifi And Broadband Facility | To Be Provided |
| External Finishing/Colour Scheme | Wpc/Textured Paint |
| Internal Finishing | Acrylic/Plastic Emulsion Paint/ Obd |
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.




Questions about Orchid Ivy?