Orchid Ivy Floors
by M/S Orchid Infrastructure Developers Pvt. Ltd. · M-Block, Mayfield Gardens, Sector 51
- RERA registration
- Applied, not granted yet
- Applied on
- 30 Oct 2021
- Application status
- Withdrawn
- Project ID
- RERA-GRG-936-2021
- Apartments
- 316
- Completion (as filed)
- 31 Dec 2024
- Estimated cost
- ₹ 147.37 Cr
This project has applied for RERA registration but has not been granted it yet. Under RERA it cannot be advertised, marketed or sold until it is registered.
RERA registration
| Registration certificate | Not issued yet: the application is being processed by HRERA Gurugram |
|---|---|
| Project ID | RERA-GRG-936-2021 |
| Authority | HRERA Gurugram |
| Project type (as filed) | New |
| Project name | Orchid Ivy Floors |
| Promoter | M/S Orchid Infrastructure Developers Pvt. Ltd. |
| Promoter’s registered office | N-2, South Extension, Part-I, New Delhi - 110049 |
| CIN | U40102DL1993PTC052875 |
| Site address | M-Block, Mayfield Gardens, Sector 51 |
| Sector | Sector 51 |
| Tehsil / District | Gurgaon / Gurugram |
| Layout plan approved | 19 Oct 2021 |
| Building plans approved | 19 Oct 2021 |
| Construction start (as filed) | 1 Jan 2022 |
| Completion (as filed) | 31 Dec 2024 |
| Application submitted | 30 Oct 2021 |
Authority, hearings & orders
- Application submitted online
- Application received by HRERA Gurugram
-
Hearing
Examination By Authority
Proceedings
The hearing is adjourned and matter to come up on 07.12.2021.
-
Hearing
Adjournment
Proceedings
The matter is adjourned for 13.12.2021
-
Hearing
Adjournment
Proceedings
Proceedings datedMs. Prachi Singh, Planning Executive briefed about the facts of the project.Temp ID- RERA-GRG-PROJ-936-2021Project Name- Orchid IVF FloorsSh. Dhruv Gupta (MD), Sh. Ajay Goel (Director), Sh. Pankaj Bajoria (CFO), Sh. Arun Nijhawan (VPProject), Sh. Ujai Pratap Singh (Sr. Legal Mangar) and Sh. Keshav Gupta (Legal Associate) arepresent on behalf of the promoter.The reply to the deficiency notice is not yet submitted. The AR submits that requisite reply alongwith necessary documents will be submitted shortly and accordingly request for a shortadjournment.Accordingly, the matter to come up on 20.12.2021.
-
Hearing
Withdrawn View order
Proceedings
Ms. Prachi Singh, Planning Executive briefed about the facts of the project. The AR Sh. Ajay Goyal on behalf of M/s Orchid Infrastructure Developers Pvt. Ltd. submitted an application providing for following: As per the market conditions, we are willing to go for small lots of plots registration and thus we need to submit a fresh application for the same. Also, for some other reasons as required and stipulated in “Detailed Project Information” (DPI) to which we have reviewed, and certain observations were taken and reconsidered as per the Project details, so we have reassessed our self for withdrawal of present application. We humbly request to allow us to withdraw our application. The Authority decided to allow the withdrawal of the project subject to forfeiture of processing fee.
Land, licence & cost
| Licence | N/A |
|---|---|
| Estimated project cost | ₹ 147.37 Cr |
| Cost of land | ₹ 0 Cr |
| Cost of construction | ₹ 141.35 Cr |
| Infrastructure and other structures | ₹ 6.02 Cr |
How the land will be used
| Use | Area (as filed) | Share |
|---|---|---|
| Land Area To Be Used For Construction Of Apartments | 18,302.656 | 73.1% |
| Construction Of Roads | 3,607.22 | 14.4% |
| Pavements | 2,824.98 | 11.3% |
| Electricity Sub-Station | 97.5 | 0.4% |
| Any Other | 217.7 | 0.9% |
Apartments 316 units
| Type | Carpet area (sq m) | Carpet area (sq ft) | Units |
|---|---|---|---|
| Apartment/Shops/Other Buildings | 107.13 | 1,153 | 20 |
| Apartment/Shops/Other Buildings | 108.13 | 1,164 | 72 |
| Apartment/Shops/Other Buildings | 107.89 | 1,161 | 116 |
| Apartment/Shops/Other Buildings | 112.18 | 1,207 | 32 |
| Apartment/Shops/Other Buildings | 110.74 | 1,192 | 28 |
| Apartment/Shops/Other Buildings | 143.10 | 1,540 | 48 |
Areas are as filed with HRERA.
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | Yes | WATER SUPPLY |
| Yes | ELECTRICITY | Yes |
| Sewage Disposal | Yes | STORM WATER DRAINAGE |
| Yes | 4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report: | Sr. No. |
| Name of the facility | Estimated cost (In Lakhs)(Within the project area only) | Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C) |
| 1 | INTERNAL ROADS AND PAVEMENTS | 156 |
| As Per Project Report | 2 | WATER SUPPLY SYSTEM |
| 30 | AS PER PROJECT REPORT | 3 |
| Storm Water Drainage | 26 | AS PER PROJECT REPORT |
| 4 | ELECTRICITY SUPPLY SYSTEM | 280 |
| As Per Project Report | 5 | SEWAGE TREATMENT & GARBAGE DISPOSAL |
| 60 | AS PER PROJECT REPORT | 6 |
| Street Lighting | 25 | AS PER PROJECT REPORT |
| 7 | SECURITY AND FIRE FIGHTING | 10 |
| As Per Project Report | 8 | PLAYGROUNDS AND PARKS |
| 0 | AS PER PROJECT REPORT | 9 |
| Club House/Community Centre | 0 | AS PER PROJECT REPORT |
| 10 | SHOPPING AREA | 0 |
| As Per Project Report | 11 | RENEWABLE ENERGY SYSTEM |
| 0 | AS PER PROJECT REPORT | 12 |
| School | 0 | AS PER PROJECT REPORT |
| 13 | HOSPITAL/DISPENSARY | 0 |
| As Per Project Report | 14 | ANY OTHER |
| 15 | AS PER PROJECT REPORT | 5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed. |
| 19-10-2021 | (date) | 6. Date of approval of Building Plans |
| 19-10-2021 | (date) | 7. New projects: |
| i) Likely date of starting the construction work | 01-01-2022 | ii) Likely date of completing the project |
| 31-12-2024 | iii) Sizes of the plots to be offered in the project | Sr. No |
| Plot Area(In Square Meter) | Number of plots in the project | 1 |
| 0 | 0 | Total |
| 0 | iv. Type of apartments to be constructed in the project: | Type |
| Carpet area(In Square Meter) | Number of apartments | Number of towers |
| Apartment/Shops/Other Buildings | 107.133 | 20 |
| 0 | Apartment/Shops/Other Buildings | 108.129 |
| 72 | 0 | Apartment/Shops/Other Buildings |
| 107.889 | 116 | 0 |
| Apartment/Shops/Other Buildings | 112.18 | 32 |
| 0 | Apartment/Shops/Other Buildings | 110.739 |
| 28 | 0 | Apartment/Shops/Other Buildings |
| 143.103 | 48 | 0 |
| (vi) Quarterly schedule of development of whole/remaining part of the project: | (c) Apartments/Shops/Other Buildings | Expenditure incurred till the date of application (In Lakhs) |
| Particulars | Expenditure | Apartments |
| 0 | Shops | 0 |
| Plots | 0 | Expenditure to be made in each quarter (In Lakhs) |
| Particulars | Year-2021 | Jan-Mar |
| Apr-June | July-Sep | Oct-Dec |
| Apartments | 0 | Shops |
| 0 | Plots | 0 |
| (d) Infrastructure | Expenditure incurred till the date of application (In Lakhs) | Particulars |
| Expenditure | Roads & Pavements | 0 |
| Water Supply System | 0 | Sewerage treatment & garbage disposal |
| 0 | Electricity Supply System | 0 |
| Storm Water Drainage | 0 | Parks and Playgrounds |
| 0 | Clubhouse/community centres | 0 |
| Shopping area | 0 | Other |
| 0 | Expenditure to be made in each quarter (In Lakhs) | Particulars |
| Year-2021 | Jan-Mar | Apr-June |
| July-Sep | Oct-Dec | Roads & Pavements |
| 0 | Water Supply System | 0 |
| Sewerage treatment & garbage disposal | 0 | Electricity Supply System |
| 0 | Storm Water Drainage | 0 |
| Parks and Playgrounds | 0 | Clubhouse/community centres |
| 0 | Shopping area | 0 |
| Other | 0 | It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented. |
| Signature of the Applicant / Authorised Representative | Stamp _____________ | Date _____________ |
| Form Rep-I | Part - D | Accounts related information: |
| 1. Annex copy of the balance sheet of last 3 years | Yes | 2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D. |
| Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form. | No | 3. Bank account to which the deposits received from apartment buyers will be credited |
| Bank and Branch address | ICICI BANK | Bank Account number |
| 000705022439 | IFSC code | ICIC0000007 |
| MICR code | 110229002 | Branch code |
| 007 | 4. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority) | Ajay Goel (Director) |
| R.C.Sharma (Sr.V.P.Project) | 5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details) | Yes |
| I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative |
| Stamp _____________ | Date _____________ | FORM REP-I |
| Part - E | Details of the statutory approvals: | 1. Annex copies of the following in Folder E: |
| i. Lay out Plan | Yes | ii. Demarcation Plan |
| Yes | iii. Zoning Plan | Yes |
| iv. Building Plan | Yes | Site Plan |
| Yes | Floor Plan | Yes |
| Apartment Plans | No | Elevation Section |
| Yes | Detail of Permissible FAR | Yes |
| Detail of covered area achieved FAR | Yes | 2. Annex copies of the following in Folder E: |
| I. Roads And Pavement Plan | Yes | II. ELECTRICITY SUPPLY PLAN |
| Yes | III. WATER SUPPLY PLAN | Yes |
| IV. Sewerage And Garbage Disposal Plan | Yes | V. STROM WATER DRAINAGE |
| Yes | VI. 10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITY | No |
| Vii. Street Lighting Plan | No | VIII. PARKING PLAN |
| No | 3. Statutory Approvals Status | Statutory Approvals |
| Statutory Approvals Status | Date | I. BUILDING PLAN |
| Already Been Obtained | NA | II. FLOOR PLAN |
| Already Been Obtained | NA | III. APARTMENT PLANS |
| Already Been Obtained | NA | IV. ELEVATION SECTION |
| Already Been Obtained | NA | V. ELECTRICITY SUPPLY PLAN |
| Already Been Obtained | NA | VI. WATER SUPPLY PLAN |
| Already Been Obtained | NA | VII. SEWERAGE AND GARBAGE DISPOSAL PLAN |
| Already Been Obtained | NA | VIII. STORM WATER DRAINAGE |
| Already Been Obtained | NA | IX. PARKING PLAN |
| Already Been Obtained | NA | It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees. |
| Signature _____________ | Seal _____________ | Date _____________ |
| Form Rep-I | Part - F | 1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers. |
| Yes | 2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules) | (Annex a copy in Folder F) |
| Yes | 3. Gist of the important provisions of the Draft Agreement | (Annex a copy in Folder F) |
| As per the RERA sample | I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. |
| Signature of the Applicant / Authorised Representative | Stamp _____________ | Date _____________ |
| Form Rep-I | Part - G | Projects launched by the promoter in last five years: (No Projects) |
| I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | FORM REP-I | Part - H |
| Specification Of Construction | Specification of apartments and other buildings including the following: | 1 |
| Flooring Details Of Various Parts Of House | MARBLE/VITRIFIED TILES/MATT FINISH TILES/ ANTI SKID CERAMIC TILES | 2 |
| Wall Finishing Details | POP PUNNING FINISHED WITH PLASTIC / ACRYLIC EMULSION PAINT/ OBD | 3 |
| Kitchen Details | MODULAR KITCHEN WITH SS SINK AND C. P. FITTINGS, CERAMIC TILES IN DADO 2 FEET ABOVE GRANITE COUNTER | 4 |
| Bathroom Fittings | SUPERIOR CHINAWARE AND C. P. FITTINGS | 5 |
| Wood Work Etc | N A | 6 |
| Doors And Windos Frames | WINDOWS FRAMES IN POWDER COATED ALUMINUM OR EQUIVALENT / UPVC AND DOOR FRAMES IN MARANDI/HARDWOOD | 7 |
| Glass Work | 4-6 MM THICK GLASS WORK IN WINDOWS GLAZING | 8 |
| Electric Fittings | SUPERIOR ISI APPROVED / EQUIVALENT FITTINGS | 9 |
| Conducting And Wiring Details | PVC CONDUIT AND COPPER WIRING | 10 |
| Cupboard Details | N.A. | 11 |
| Water Storage | AS PER DESIGN | 12 |
| Lift Details | PASSENGER ELEVATOR - 08 PERSONS | 13 |
| External Glazings | POWDER COATED AL / UPVC WITH 4-6 MM THICK GLASS | 13.1 |
| Windows/Glazings | 4-6 MM THICK GLASS | 14 |
| Doors | NA | 14.1 |
| Main Doors | MODULAR FLUSH DOOR / PANELED DOOR | 14.2 |
| Internal Doors | FLUSH DOORS / LAMINATED FLUSH DOORS. | 15 |
| Air Conditioning | SPLIT INVERTER A/C'S | 16 |
| Electrical Fittings | N.A. | 17 |
| Cng Pipe Line | PROVISION TO BE LEFT | 18 |
| Provision Of Wifi And Broadband Facility | TO BE PROVIDED | 19 |
| External Finishing/Colour Scheme | WPC / TEXTURED PAINT | 20 |
| Internal Finishing | ACRYLIC / PLASTIC EMULSION PAINT / OBD | SPECIFICATION UNIT WISE |
| 1 . Living/Dining/Foyer/Family Lounge | 1 . 1 | FLOOR |
| 18 Mm Imported Marble / Equivalent Marble | 1 . 2 | WALLS |
| Pop Punning With Plastic / Acrylic Emulsion Paint | 1 . 3 | CEILING |
| Pop Punning With Obd | 2 . MASTER BEDROOM/DRESSROOM | 2 . 1 |
| Floor | 18 MM IMPORTED MARBLE / EQUIVALENT MARBLE | 2 . 2 |
| Walls | POP PUNNING WITH PLASTIC / ACRYLIC EMULSION PAINT | 2 . 3 |
| Ceiling | POP PUNNING WITH OBD | 2 . 4 |
| Modular Wardrobes | N.A. | 3 . MASTER TOILET |
| 3 . 1 | FLOOR | MATT FINISH TILES 2FTX2FT |
| 3 . 2 | WALLS | CERAMIC / PORCELAIN TILES 2 FTX1 FT UPTO 7 FEET HIGH |
| 3 . 3 | CEILING | MR PAINTED FALSE CEILING WITH TRAP DOOR FOR SERVICING |
| 3 . 4 | COUNTERS | GRANITE / EQUIVALENT STONE |
| 3 . 5 | SANITARY WARE/CP FITTINGS | BRANDED SANITARY WARE AND C. P. FITTINGS |
| 3 . 6 | FITTING/FIXTURES | REPUTED BRANDS |
| 4 . Bed Rooms | 4 . 1 | FLOOR |
| Vitrified Tiles 2 FTX2FT With 3 Feet High Skirting | 4 . 2 | WALLS |
| Pop Punning With Plastic / Acrylic Emulsion Paint | 4 . 3 | CEILING |
| Pop Punning With Obd Paint | 4 . 4 | WARDROBES |
| N.a. | 5 . TOILET | 5 . 1 |
| Floor | MATT FINISH TILES 2 FTX2 FT | 5 . 2 |
| Walls | CERAMIC / PORCELAIN TILES 2 FTX1 FT UPTO 7 FEET HIGH | 5 . 3 |
| Ceiling | MR PAINTED FALSE CEILING WITH SERVICE TRAP DOOR | 5 . 4 |
| Counters | GRANITE / EQUIVALENT STONE | 5 . 5 |
| Sanitary Ware/Cp Fittings | REPUTED BRAND | 5 . 6 |
| Fixtures | REPUTED BRAND | 6 . KITCHEN |
| 6 . 1 | FLOOR | VITRIFIED TILES FLOORING SAME TILE SKIRTING 3 FEET HIGH |
| 6 . 2 | WALLS | PORCELAIN / CERAMIC TILES 2 FT ABOVE COUNTER TOP, REST IN POP PUNNING WITH EMULSION PAINT |
| 6 . 3 | CEILING | POP PUNNING WITH OBD PAINT |
| 6 . 4 | COUNTERS | GRANITE COUNTER WITH SS DOUBLE BOWL SINK WITH FIXTURE AND FITTED WITH MODULAR KITCHEN |
| 6 . 5 | FIXTURES | REPUTED BRAND |
| 6 . 6 | KITCHEN APPLIANCES | HOB AND CHIMNEY |
| 7 . Utility Rooms/Utility Balcony/Toilet | 7 . 1 | FLOOR |
| Anti Skid Ceramic Tile With 4 Feet High Skirting | 7 . 2 | WALLS & CEILING |
| Pop With Obd Paint | 7 . 3 | TOILET |
| Plain Ceramic Tile Upto 4 Feet High And Rest In Pop Punning With Obd Paint. | 7 . 4 | BALCONY |
| Anti Skid Ceramic Tiles, With M.s. / Toughened Glass Metal Railing | 8 . SIT-OUTS | 8 . 1 |
| Floor | ANTI SKID CERAMIC TILES WITH 4 FEET HIGH SKIRTING | 8 . 2 |
| Walls & Ceiling | EXTERNAL TEXTURE PAINT POP PUNNING WITH OBD | 8 . 3 |
| Railings | M.S. METAL / GLASS | 8 . 4 |
| Fixtures | REPUTED BRAND | I hereby declare that the above information and particulars are based on record and are true to the |
| best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | List of Uploaded Documents | Sr. No. |
| Document Description | Date of Document Upload | View Document |
| 1 | DEMARCATION PLAN | 30-10-2021 |
| View Document | 2 | DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. |
| 30-10-2021 | View Document | 3 |
| Service Plans Showing The Services On The Layout Plan | 30-10-2021 | View Document |
| 4 | IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN | 30-10-2021 |
| View Document | 5 | ZONING PLAN |
| 30-10-2021 | View Document | 6 |
| Copy Of License Along With Schedule Of Land | 30-10-2021 | View Document |
| 7 | DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD | 30-10-2021 |
| View Document | 8 | IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN |
| 30-10-2021 | View Document | 9 |
| Certificate From A Chartered Accountant Certifying That The Informstion Provided By The Applicant In Form Rep-1-C-X Is Correct As Per The Books Of Accounts/ Balance Sheet Of The Applicant | 30-10-2021 | View Document |
| 10 | A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS | 30-10-2021 |
| View Document | 11 | CASH FLOW STATEMENT OF THE PROPOSED PROJECT |
| 30-10-2021 | View Document | 12 |
| Non Default Certificate From A Chartered Accountant | 30-10-2021 | View Document |
| I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative |
| Stamp _____________ | Date _____________ |
Facilities in the service plan
| Facility | Estimated cost | Status |
|---|---|---|
| Internal Roads And Pavements | ₹ 1.56 Cr | As Per Project Report |
| Water Supply System | ₹ 30 lakh | As Per Project Report |
| Storm Water Drainage | ₹ 26 lakh | As Per Project Report |
| Electricity Supply System | ₹ 2.8 Cr | As Per Project Report |
| Sewage Treatment & Garbage Disposal | ₹ 60 lakh | As Per Project Report |
| Street Lighting | ₹ 25 lakh | As Per Project Report |
| Security And Fire Fighting | ₹ 10 lakh | As Per Project Report |
| Any Other | ₹ 15 lakh | As Per Project Report |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| Building Plan | Already Been Obtained | |
| Floor Plan | Already Been Obtained | |
| Apartment Plans | Already Been Obtained | |
| Elevation Section | Already Been Obtained | |
| Electricity Supply Plan | Already Been Obtained | |
| Water Supply Plan | Already Been Obtained | |
| Sewerage And Garbage Disposal Plan | Already Been Obtained | |
| Storm Water Drainage | Already Been Obtained | |
| Parking Plan | Already Been Obtained |
Specifications (as filed)
| Flooring Details Of Various Parts Of House | Marble/Vitrified Tiles/Matt Finish Tiles/ Anti Skid Ceramic Tiles |
|---|---|
| Wall Finishing Details | Pop Punning Finished With Plastic / Acrylic Emulsion Paint/ Obd |
| Kitchen Details | Modular Kitchen With SS Sink And C. P. Fittings, Ceramic Tiles In Dado 2 Feet Above Granite Counter |
| Bathroom Fittings | Superior Chinaware And C. P. Fittings |
| Wood Work Etc | N A |
| Doors And Windos Frames | Windows Frames In Powder Coated Aluminum Or Equivalent / Upvc And Door Frames In Marandi/Hardwood |
| Glass Work | 4-6 Mm Thick Glass Work In Windows Glazing |
| Electric Fittings | Superior Isi Approved / Equivalent Fittings |
| Conducting And Wiring Details | Pvc Conduit And Copper Wiring |
| Water Storage | As Per Design |
| Lift Details | Passenger Elevator - 08 Persons |
| External Glazings | Powder Coated Al / Upvc With 4-6 Mm Thick Glass |
| Windows/Glazings | 4-6 Mm Thick Glass |
| Main Doors | Modular Flush Door / Paneled Door |
| Internal Doors | Flush Doors / Laminated Flush Doors. |
| Air Conditioning | Split Inverter A/C's |
| Cng Pipe Line | Provision To Be Left |
| Provision Of Wifi And Broadband Facility | To Be Provided |
| External Finishing/Colour Scheme | Wpc / Textured Paint |
| Internal Finishing | Acrylic / Plastic Emulsion Paint / Obd |
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.