Orchid Ivy- 2
by M/S Orchid Infrastructure Developers Pvt. Ltd. · M-Block, Sector-51, Gurugram
- RERA registration
- GGM/646/378/2022/121
- Registered on
- 13 Dec 2022
- Valid till
- 31 Dec 2026
- Project ID
- RERA-GRG-1141-2022
- Apartments
- 72 in 18 towers
- Plots
- 18
- Completion (as filed)
- 31 Dec 2026
- Estimated cost
- ₹ 108.18 Cr
RERA registration
| Registration certificate | GGM/646/378/2022/121, dated 13 Dec 2022 |
|---|---|
| Registration valid till | 31 Dec 2026 |
| Project ID | RERA-GRG-1141-2022 |
| Authority | HRERA Gurugram |
| Project type (as filed) | New |
| Project name | Orchid Ivy- 2 |
| Promoter | M/S Orchid Infrastructure Developers Pvt. Ltd. |
| Promoter’s registered office | Level-II Global Arcade, Mehrauli Gurugram Road, Gurugram, Haryana |
| CIN | U40102DL1993PTC052875 |
| Site address | M-Block, Sector-51, Gurugram |
| Sector | Sector 51 |
| Tehsil / District | Gurgaon / Gurugram |
| Layout plan approved | 24 Oct 2017 |
| Building plans approved | 13 May 2022 |
| Construction start (as filed) | 15 Oct 2022 |
| Completion (as filed) | 31 Dec 2026 |
| Application submitted | 6 Sep 2022 |
Authority, hearings & orders
- Application submitted online
- Application received by HRERA Gurugram
-
Hearing
Examination By Authority View order
Proceedings
Proceedings dated 03.10.2022 : Ar. Neeraj Gautam, Associate Architectural Executive and Ms. Asha, Chartered Accountant briefed the facts of the case. Sh. Dhruv Gupta, Sh. Ajay Goel (Director), Sh. Arun Nijhawan (Director) and Sh. Keshav Gupta are present on behalf of the promoter. The legal capacity papers as have been submitted earlier needs to be perused by the Members. The matter to come up on 10.10.2022. (Sanjeev Kumar Arora) Member, HARERA, Gurugram (Ashok Sangwan) Member, HARERA, Gurugram (Dr. K.K. Khandelwal) Chairman, HARERA, Gurugram
-
Hearing
Objection
Proceedings
The matter is adjourned for 12.10.2022.
-
Hearing
Adjournment View order
Proceedings
The matter was considered and it was decided to adjourned the same for 14.11.2022. Matter to come up on 14.11.2022.
-
Hearing
Adjournment View order
Proceedings
The matter is adjourned for 15.11.2022.
-
Hearing
Adjournment View order
Proceedings
Proceedings dated 15.11.2022 Ms. Prachi Singh, Planning Executive briefed about the facts of the project. Sh. Dhruv Gupta (Managing Director) Sh. Ajay Goel (Director), Sh. Arun Nijhawan (Sr. VP) and Sh. Keshav Gupta (Legal Associate) are present on behalf of the promoter. The AR submits that after removing deficiencies, the requisite documents and DPI stands submitted in the Authority on 03.10.2022 but the concerned Planning Executive is not aware about the same who is directed to link up and put up the matter within three days along with details of any deficit document which still remains to be supplied. The matter to come up on 21.11.2022. (Sanjeev Kumar Arora) Member, HARERA, Gurugram (Ashok Sangwan) Member, HARERA, Gurugram (Vijay Kumar Goyal) Member, HARERA, Gurugram
-
Hearing
Approved And Ready For Certificate Issuing Process View order
Proceedings
Approved as proposed.
- Registration granted GGM/646/378/2022/121
- Certificate uploaded RC Uploaded
- Registration valid till
Land, licence & cost
| Licence | N/A |
|---|---|
| FAR permissible / proposed | 11160.08 / 256 |
| Estimated project cost | ₹ 108.18 Cr |
| Cost of land | ₹ 14.56 Cr |
| Cost of construction | ₹ 59.08 Cr |
| EDC, taxes, levies and other costs | ₹ 34.54 Cr |
How the land will be used
| Use | Area (as filed) | Share |
|---|---|---|
| Land Area To Be Used For Construction Of Apartments | 4,387.69 | 100% |
Apartments 72 units · 18 towers
| Type | Carpet area (sq m) | Carpet area (sq ft) | Units |
|---|---|---|---|
| Apartment/Shops/Other Buildings | 9,955.33 | - | 72 |
Areas are as filed with HRERA. Some rows show a total built-up area rather than one home’s carpet area, as entered by the promoter.
Plots 18 plots
| Plot size (sq m) | Sq yd | Sq ft | Plots |
|---|---|---|---|
| 208.75 | 250 | 2,247 | 4 |
| 223.59 | 267 | 2,407 | 8 |
| 293.99 | 352 | 3,164 | 6 |
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | ALREADY LAID AND EXISTING ROADS AND INFRASTRUCTURE WORKS | Yes |
| Water Supply | ALREADY LAID AND EXISTING WATER SUPPY AND INFRASTRUCTURE WORKS | Yes |
| Electricity | ALREADY LAID AND EXISTING ELECTRICITY AND INFRASTRUCTURE WORKS | Yes |
| Sewage Disposal | ALREADY LAID AND EXISTING SEWAGE AND INFRASTRUCTURE WORKS | Yes |
| Storm Water Drainage | ALREADY LAID AND EXISTING STORM WATER DRAINAGE AND INFRASTRUCTURE WORKS | Yes |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| Building Plan M-746 | Already Been Obtained | 3 May 2022 |
| Building Plan M-747 | Already Been Obtained | 3 May 2022 |
| Building Plan M-748 | Already Been Obtained | 3 May 2022 |
| Building Plan M-749 | Already Been Obtained | 3 May 2022 |
| Building Plan M-750 | Already Been Obtained | 3 May 2022 |
| Building Plan M-751 | Already Been Obtained | 3 May 2022 |
| Building Plan M-752 | Already Been Obtained | 3 May 2022 |
| Building Plan M-753 | Already Been Obtained | 3 May 2022 |
| Building Plan M-754 | Already Been Obtained | 19 Oct 2021 |
| Building Plan M-755 | Already Been Obtained | 3 May 2022 |
| Building Plan M-756 | Already Been Obtained | 3 May 2022 |
| Building Plan M-757 | Already Been Obtained | 3 May 2022 |
| Building Plan M-794 | Already Been Obtained | 13 May 2022 |
| Building Plan M-795 | Already Been Obtained | 13 May 2022 |
| Building Plan M-796 | Already Been Obtained | 19 Oct 2021 |
| Building Plan M-797 | Already Been Obtained | 13 May 2022 |
| Building Plan M-798 | Already Been Obtained | 13 May 2022 |
| Building Plan M-799 | Already Been Obtained | 13 May 2022 |
Specifications (as filed)
| Flooring Details Of Various Parts Of House | Marble /Vitrified Tiles/Matt Finish Tiles/ Anti Skid Ceramic Tiles |
|---|---|
| Wall Finishing Details | Pop Punning Finish With Plastic /Acrylic Emulsion Paint/Obd |
| Kitchen Details | Modular Kitchen With SS Skip And C.p Fitting, Ceramic Tiles In Ddo 2FT. Above Granite Counter |
| Bathroom Fittings | Superior Chinaware And C.p Fittings |
| Wood Work Etc | Seasoned Wood Door Frames |
| Doors And Windos Frames | Windows Frames In Powder Coated Aluminium Or Equivalent /Upvc And Door Frames In Marandi/ Hardwood |
| Glass Work | 4-6 Mm Thick Glass Work In Windows Flazing |
| Electric Fittings | Superior Isi Approved/ Equivalent Fittings |
| Conducting And Wiring Details | Pvc Conduit And Copper Wiring |
| Cupboard Details | N/A |
| Water Storage | As Per Design |
| Lift Details | Passenger Elevator -08 Persons |
| External Glazings | Powder Coated Al/Upvc With 4-6 Mm Thick Glass |
| Windows/Glazings | 4-6 Mm Thick Glass |
| Doors | Flush Door Shutters |
| Main Doors | Modular Flush Door/ Panele Door |
| Internal Doors | Flush Doors/ Laminated Flush Doors |
| Air Conditioning | Spilt Inverter Acs |
| Electrical Fittings | All Modular Switches, Sockets And Fixtures |
| Cng Pipe Line | Provision To Be Left |
| Provision Of Wifi And Broadband Facility | To Be Provided |
| External Finishing/Colour Scheme | Wpc/Texttured Paint |
| Internal Finishing | Acrylic/Plastic Emulsion Paint/ Obd |
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.