HearingApproved And Ready For Certificate Issuing ProcessView order Proceedings
Sh. Ashish Kush, Planning Executive briefed about the facts of the case. Sh. Abhijeet Singh (AR), Sh. Manik Sharma (AS) and Sh. Bharat Vigmal (AS) are present on behalf of the promoter. Approved as proposed subject to publication of notice in two prominent newspapers regarding inviting the objections from the allottees with regard to the revision of building plans. If any allotee have any objection than the allottee can visit the office of HARERA, Gurugram and see/check the consent of allottees submitted by the promoter alongwith the revised building plans within seven days from the date of publication.
Registration grantedGGM/688/420/2023/32
Registration valid till
Land, licence & cost
Land area of the project
14.413 acres
Total licensed area
14.413 acres
Licence
15 of 2017 dated 02.05.2017
FAR permissible / proposed
3.79 / 3.61
Estimated project cost
₹ 2,259.77 Cr
Cost of land
₹ 623.81 Cr
Cost of construction
₹ 854.34 Cr
Infrastructure and other structures
₹ 92.57 Cr
EDC, taxes, levies and other costs
₹ 689.05 Cr
How the land will be used
Use
Acres
Share
Land Area To Be Used For Construction Of Apartments
7.328
50.9%
Construction Of Roads
2.827
19.6%
Parks And Playgrounds
1.6529
11.5%
Any Other
2.6
18%
External services
Service
Provided by
Approval taken
Roads
GMDA
No
Water Supply
GMDA
Yes
Electricity
DHBVN
Yes
Sewage Disposal
GMDA
Yes
Storm Water Drainage
GMDA
Yes
Facilities in the service plan
Facility
Estimated cost
Status
Internal Roads And Pavements
₹ 7.37 Cr
As Per Project Report
Water Supply System
₹ 6.44 Cr
As Per Project Report
Storm Water Drainage
₹ 1.44 Cr
As Per Project Report
Electricity Supply System
₹ 19.44 Cr
As Per Project Report
Sewage Treatment & Garbage Disposal
₹ 4.69 Cr
As Per Project Report
Street Lighting
₹ 55.3 lakh
As Per Project Report
Security And Fire Fighting
₹ 96.7 lakh
As Per Project Report
Playgrounds And Parks
₹ 3 Cr
As Per Project Report
Hardscape And Softscape
₹ 6.93 Cr
As Per Project Report
Boundary
₹ 60.58 lakh
As Per Project Report
Main Entrance Work Guard House
₹ 52.4 lakh
As Per Project Report
Parking
₹ 5 lakh
As Per Project Report
Stp
₹ 6.2 Cr
As Per Project Report
Underground Tank
₹ 5.12 Cr
As Per Project Report
Rain Water Harvesting
₹ 88 lakh
As Per Project Report
Electrical Sub Station
₹ 28.36 Cr
As Per Project Report
Statutory approvals
Approval
Status
Date
Environment Clearance
Already Been Obtained
17 Nov 2022
Building Plan Approval
Already Been Obtained
16 Nov 2022
Assurance Construction Water
Already Been Obtained
11 May 2017
Assurance Strom Water
Already Been Obtained
8 Apr 2022
Assurance Drinking Water
Already Been Obtained
26 Mar 2022
Specifications (as filed)
Flooring Details Of Various Parts Of House
Rcc Slab/Tile
Wall Finishing Details
Painted/White Wash Masonry Wall/Partition
Bathroom Fittings
Standard Chinaware, Cp Fittings, With/ Without Wash Basin Counter
Doors And Windos Frames
Powder Coated Aluminium Frame/Wooden Frame
Glass Work
Glass Thickness Varies From 5 To 12MM
Electric Fittings
Public Areas & Toilets To Be Provided With Led Light Fixtures.
Conducting And Wiring Details
Is Approved Conduits & Wires
Water Storage
Rcc Tank
Lift Details
Schindler / Thyssenkrupp / Fujitec / Kone
External Glazings
Powder Coated Aluminium Glazing With Glass Of 5-12 Mm Thick Glass
Windows/Glazings
Powder Coated Aluminium Glazing With Glass Of 5-12 Mm Thick Glass
Doors
Aluminium Doors / Glass Doors
Main Doors
Aluminium Doors / Glass Doors
Internal Doors
Ms/Aluminium/Wooden
Air Conditioning
Chilled Water Ac System Upto Tap Off For Multiplex/Cinema & Food Court. Provision For Water Cooled Dx System Up To Tap Off Inside The Shop. Air Cooled Dx Split Ac System For Residential Block
Electrical Fittings
Provision Of Wire / Cable Up To Distribution Board Isi /Bis Approved
Provision Of Wifi And Broadband Facility
Provision Of Ont Box Only
External Finishing/Colour Scheme
Paint/Glass/Acp
Internal Finishing
Antiskid Tiles/Ips On Floor, Paint/White Wash Finish On Wall & Ceiling In Public Areas
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Mixed Land Use (Residential (M3M Heights, M3M Skycity) & Commercial (M3M 65TH Avenue))?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.