Initial scrutinyFirst hearing is fixed for 29.08.2022.
Next hearingNot Required
Application submitted online
Notice sent to the promoter1st deficiency notice
HearingApproved And Ready For Certificate Issuing ProcessProceedings
Ms. Geeta Rathee Singh, Sr. Legal Officer and Sh. Sumeet, Engineer Executive briefed about the facts of the case. Sh. Manik Sharma (AR – Manager), Sh. Abhijeet Singh (AR) and Sh. Vineet Maheshwari (AR) are present on behalf of the promoter. The Authority observes that the applicant promoter has applied for registration of Phase-1 measuring 27291.73 sq.m. of FAR and the balance permissible FAR of 2978.708 Sq.m. is proposed to be registered under Phase-2. However, it is noticed that in the building plans approved by DTCP, there is a common basement proposed under Phase-1 as well as Phase-2 and neither any phasing has been shown in the plans or lay out plan and hence the promoter is advised to seek registration of above entire licensed area measuring 4.0 acres. The AR submits that the requisite amendments in application forms shall be made today itself as fees has been paid for the entire area. Accordingly, as recommended above, the Authority decides to grant registration after submission of application for the entire area and BG/Cheques of Rs. 25 lakh each for submission of approved fire NOC as well as service plan estimates within 3 months of grant of registration.
Registration grantedGGM/605/337/2022/80
Certificate uploadedRC Uploaded
Registration valid till
Land, licence & cost
Land area of the project
4 acres
Total licensed area
4 acres
Licence
84 of 2022 dated 06-07-2022
Estimated project cost
₹ 229.13 Cr
Cost of land
₹ 33.67 Cr
Cost of construction
₹ 117.48 Cr
Infrastructure and other structures
₹ 11.3 Cr
EDC, taxes, levies and other costs
₹ 66.67 Cr
How the land will be used
Use
Acres
Share
Construction Of Roads
1.011
25.3%
Parks And Playgrounds
1.036
25.9%
Area Under Commercial Units
1.953
48.8%
Apartments 727 units
Type
Carpet area (sq m)
Carpet area (sq ft)
Units
Apartment/Shops/Other Buildings
18,531.37
-
727
Areas are as filed with HRERA. Some rows show a total built-up area rather than one home’s carpet area, as entered by the promoter.
External services
Service
Provided by
Approval taken
Roads
GMDA
Yes
Water Supply
GMDA
Yes
Electricity
DHBVN
Yes
Sewage Disposal
GMDA
Yes
Storm Water Drainage
GMDA
Yes
Facilities in the service plan
Facility
Estimated cost
Status
Internal Roads And Pavements
₹ 3.08 Cr
As Per Project Report
Water Supply System
₹ 1.53 Cr
As Per Project Report
Storm Water Drainage
₹ 60.54 lakh
As Per Project Report
Electricity Supply System
₹ 58.34 lakh
As Per Project Report
Sewage Treatment & Garbage Disposal
₹ 1.59 Cr
As Per Project Report
Street Lighting
₹ 15.35 lakh
As Per Project Report
Security And Fire Fighting
₹ 50.36 lakh
As Per Project Report
Playgrounds And Parks
₹ 2.89 lakh
As Per Project Report
Parking
₹ 6.56 lakh
As Per Project Report
Stp
₹ 41.45 lakh
As Per Project Report
Underground Water Tank
₹ 27.63 lakh
As Per Project Report
Rain Water Harvesting
₹ 12.28 lakh
As Per Project Report
Electrical Sub Station
₹ 1.32 Cr
As Per Project Report
Boundary Wall
₹ 8.8 lakh
As Per Project Report
Consultancy
₹ 93.76 lakh
As Per Project Report
Statutory approvals
Approval
Status
Date
Licence
Already Been Obtained
6 Jul 2022
Zoning Plan
Already Been Obtained
6 Jul 2022
Loi
Already Been Obtained
8 Apr 2022
Aravali Noc
Already Been Obtained
7 Jul 2018
Forest Noc
Already Been Obtained
4 Jul 2018
Building Plan Approval
Already Been Obtained
16 Aug 2022
Environment Clearance
Already Been Obtained
17 Feb 2020
Specifications (as filed)
Flooring Details Of Various Parts Of House
Bare R.c.c. Slab
Wall Finishing Details
Lavel Plast / White Putty
Doors And Windos Frames
Aluminium Frame
Glass Work
Glass With Aluminium Frame
Electric Fittings
Led Type Fittings In Common Area Only
Conducting And Wiring Details
Pvc/Ms Conduit With Fr / Frls Pvc Wires
Water Storage
Ugt (Fire, Raw & Domastic) = 550 Klrecycled Water = 385 Kloht = 90 Kl
Lift Details
3 Nos Passenger & 5 Nos Service Lifts
External Glazings
External FaçAde - Sgu
Main Doors
Aluminium And Glass For Retail
Internal Doors
Aluminium And Glass For Retail / Flus Laminated Doors
Air Conditioning
Provision In Retail & Common Area Non A/C
Electrical Fittings
Led Type Fitting Common Area Only
Cng Pipe Line
F&b / Food Court
Provision Of Wifi And Broadband Facility
Broad Band Provided
External Finishing/Colour Scheme
Glass With Stone / Aluminium Cladding
Internal Finishing
Gypsum Plaster & Paint
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about M3M ROUTE65?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.