Sh. Sumeet, Engineering Officer and Ms. Suruchi Pandey, Chartered Accountant briefed about the facts of the case. Sh. Abhijeet Singh (AR), Sh. Bharat Vigmal (AR) and Sh. Manik Sharma (AR) are present on behalf of the promoter. The AR of the promoter states that reply to the deficiencies has been submitted on 07.03.2024. The office to examine the same. Meanwhile the promoter is directed to publish a public notice of ten days in two leading newspapers one Hindi and one English regarding the objections if any from the existing allottees with respect to revision in building plans and 2/3rd consents submitted thereof. The matter to come on 27.03.2024 at 3.00 PM.
HearingApproved And Ready For Certificate Issuing ProcessView order Proceedings
Sh. Sumeet, Engineering Officer and Ms. Suruchi Pandey, Chartered Accountant briefed about the facts of the case. Sh. Abhijeet Singh (AR), Sh. Manik Sharma (AR) and Sh. Bharat Vigmal (AR) are present on behalf of the promoter. The AR of the promoter states that the approval of service plans and estimates is in advance stage of approval and the BG demanded by DTCP for approval of same has been deposited. The promoter will submit the approved service plan & estimates within three months of grant of registration of project. Approved as proposed.
Registration grantedGGM/803/535/2024/30
Certificate uploadedRC Uploaded
Registration valid till
Land, licence & cost
Land area of the project
4 acres
Total licensed area
4 acres
Licence
84 of 2022 dated 06-07-2022 and 213 of 2023 dated 20-10-2023
FAR permissible / proposed
1.93 / 1.91
Estimated project cost
₹ 392.33 Cr
Cost of land
₹ 20.62 Cr
Cost of construction
₹ 197.71 Cr
Infrastructure and other structures
₹ 21.96 Cr
EDC, taxes, levies and other costs
₹ 152.04 Cr
How the land will be used
Use
Acres
Share
Areaundercommercialunits
2.2188
55.5%
Construction Of Roads
1.7812
44.5%
External services
Service
Provided by
Approval taken
Roads
GMDA
Yes
Water Supply
GMDA
Yes
Electricity
DHBVN
Yes
Sewage Disposal
GMDA
Yes
Storm Water Drainage
GMDA
Yes
Facilities in the service plan
Facility
Estimated cost
Status
Internal Roads And Pavements
₹ 3.08 Cr
As Per Project Report
Water Supply System
₹ 1.2 Cr
As Per Project Report
Storm Water Drainage
₹ 1.25 Cr
As Per Project Report
Electricity Supply System
₹ 3.28 Cr
As Per Project Report
Sewage Treatment & Garbage Disposal
₹ 1.38 Cr
As Per Project Report
Street Lighting
₹ 25 lakh
As Per Project Report
Security And Fire Fighting
₹ 85 lakh
As Per Project Report
Hardscape And Softscape
₹ 2.43 Cr
As Per Project Report
Boundary Wall
₹ 90.2 lakh
As Per Project Report
Parking
₹ 6.7 lakh
As Per Project Report
Stp
₹ 72 lakh
As Per Project Report
Underground Water Tank
₹ 45 lakh
As Per Project Report
Rain Water Harvesting
₹ 20 lakh
As Per Project Report
Electrical Sub Station
₹ 2.3 Cr
As Per Project Report
Consultancy
₹ 2.86 Cr
As Per Project Report
Infra And Establishment
₹ 73.95 lakh
As Per Project Report
Statutory approvals
Approval
Status
Date
Licence No. 84 Of 2022
Already Been Obtained
6 Jul 2022
Licence 213 Of 2023
Already Been Obtained
20 Oct 2023
Revised Building Plan
Already Been Obtained
12 Feb 2024
Revised Fire Scheme
Already Been Obtained
20 Mar 2024
Revised Zoning
Already Been Obtained
9 Feb 2024
Specifications (as filed)
Flooring Details Of Various Parts Of House
Bare R.c.c. Slab
Wall Finishing Details
Lavel Plast / White Putty
Doors And Windos Frames
Aluminium Frame
Glass Work
Glass With Aluminium Frame
Electric Fittings
Led Type Fittings In Common Area Only
Conducting And Wiring Details
Pvc/Ms Conduit With Fr / Frls Pvc Wires
Water Storage
Ugt (Fire, Raw & Domastic) = 550 Klrecycled Water = 385 Kloht = 90 Kl
Lift Details
3 Nos Passenger & 5 Nos Service Lifts
External Glazings
Single/Double Glazed Units
Main Doors
Aluminium And Glass For Retail
Internal Doors
Aluminium And Glass For Retail / Flus Laminated Doors
Air Conditioning
Provision In Retail & Common Area Non A/C
Electrical Fittings
Led Type Fitting Common Area Only
Cng Pipe Line
F&b / Food Court
Provision Of Wifi And Broadband Facility
As Applicable
External Finishing/Colour Scheme
Glass With Stone / Aluminium Cladding
Internal Finishing
Plaster & Paint
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about M3M ROUTE65?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.