Registration validHRERA Gurugram

Kashi Residences

by Jai Ganga Realtech LLP · Village Badha And Hayatpur, Sector 89 & 93

RERA registration
GGM/978/710/2025/81
Registered on
29 Aug 2025
Valid till
5 Jan 2028
Project ID
RERA-GRG-1963-2025
Land area
2.551 acres
Apartments
138 in 1 tower
Completion (as filed)
5 Jan 2028
Estimated cost
₹ 572.29 Cr

RERA registration

Registration certificateGGM/978/710/2025/81, dated 29 Aug 2025
Registration valid till5 Jan 2028
Project IDRERA-GRG-1963-2025
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameKashi Residences
Site addressVillage Badha And Hayatpur, Sector 89 & 93
SectorSector 89
Tehsil / DistrictGurgaon / Gurugram
Layout plan approved19 Jun 2025
Building plans approved21 Jul 2025
Construction start (as filed)1 Jun 2025
Completion (as filed)5 Jan 2028
Application submitted25 Jul 2025

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Initial scrutinyFirst hearing
Next hearingNot Required
  1. Application submitted online
  2. Application received by HRERA Gurugram
  3. Notice sent to the promoter By Hand
  1. Hearing Approved And Ready For Certificate Issuing Process View order
    Proceedings

    Proceedings dated 25.08.2025. Sh. Shashank Sharma, Associate Engineer Executive and Ms. Asha, Chartered Accountant briefed about the facts of the case. Sh. Neeraj (AR), Sh. Ashwani (AR) are present on behalf of promoter. The site of the project was visited physically on 19.08.2025 by the concerned Associate Engineer Executive along with Chartered Accountant and it has been noted that the project i.e., Independent Residential Floors namely “Kashi Residences” has the access from the service road of 60m wide existing road. Further, barricading has been done at the site by the promoter and apart from that no development has been carried out at the site. The AR present on behalf of promoter states that approved service plans and estimates for the whole project i.e., 5 acres has been applied in the concerned department and project namely “Kashi” and “Kashi Residences” both exists on the same license no 07 of 2022 and promoter of both the projects are also the same. The AR present further requests the Authority to consider the Security amount of Rs 25 lakhs which is already submitted vide DD no 500186 dated 19.08.2025 of ICICI Bank in respect of service plans and estimates of project namely “Kashi” in this project also i.e., “Kashi Residences”. In view of the same, request is allowed, and promoter shall submit the BG/DD of Rs 25 lakhs as a security amount to submit the environmental clearance within four months of the issuance of registration certificate. Approved as proposed. The registration certificate shall be issued after the submission of form A-H, DPI and other deficit documents along with BG/DD as above.

  2. Registration granted GGM/978/710/2025/81
  3. Certificate uploaded RC Uploaded
  1. Registration valid till

Land, licence & cost

Land area of the project2.551 acres
Total licensed area5 acres
Licence7 OF 2022 DATED 19.01.2022
FAR permissible / proposed2.64 / 2.64
Estimated project cost₹ 572.29 Cr
Cost of land₹ 0 Cr
Cost of construction₹ 254.01 Cr
Infrastructure and other structures₹ 251.83 Cr
EDC, taxes, levies and other costs₹ 66.45 Cr

How the land will be used

UseArea (as filed)Share
Land Area To Be Used For Construction Of Apartments2.551451%
Construction Of Roads1.063521.3%
Parks And Playgrounds0.53610.7%
Electricity Sub-Station0.03710.7%
Sewage And Solid Waste Treatment Facility0.11122.2%
Any Other0.700914%

Apartments 138 units · 1 tower

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings24,734.73-69
Apartment/Shops/Other Buildings23,752.08-66
Apartment/Shops/Other Buildings308.023,3151
Apartment/Shops/Other Buildings332.383,5781
Apartment/Shops/Other Buildings342.263,6841

Areas are as filed with HRERA. Some rows show a total built-up area rather than one home’s carpet area, as entered by the promoter.

External services

ServiceProvided byApproval taken
RoadsCONNECTEDNo
Water SupplyGMDAYes
ElectricityNoSEWAGE DISPOSAL
GMDAYesSTORM WATER DRAINAGE
GMDAYes4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:
Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)1INTERNAL ROADS AND PAVEMENTS
0YET TO BE PREPARED2
Water Supply System0YET TO BE PREPARED
3STORM WATER DRAINAGE0
Yet To Be Prepared4ELECTRICITY SUPPLY SYSTEM
0YET TO BE PREPARED5
Sewage Treatment & Garbage Disposal0YET TO BE PREPARED
6STREET LIGHTING0
Yet To Be Prepared7SECURITY AND FIRE FIGHTING
0YET TO BE PREPARED8
Playgrounds And Parks0YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE0
Yet To Be Prepared10SHOPPING AREA
0YET TO BE PREPARED11
Renewable Energy System0YET TO BE PREPARED
12SCHOOL0
Yet To Be Prepared13HOSPITAL/DISPENSARY
0YET TO BE PREPARED14
Any Other0YET TO BE PREPARED
15UNDERGROUND WATER TANK0
Yet To Be Prepared16RAIN WATER HARVESTING
0YET TO BE PREPARED17
Electrical Sub Station0YET TO BE PREPARED
18SEWERAGE SYSYTEM0
Yet To Be Prepared5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.19-06-2025
(date)6. Date of approval of Building Plans21-07-2025
(date)7. New projects:i) Likely date of starting the construction work
01-06-2025ii) Likely date of completing the project05-01-2028
iii) Sizes of the plots to be offered in the projectSr. NoPlot Area(In Square Meter)
Number of plots in the project10
0Total0
iv. Type of apartments to be constructed in the project:TypeCarpet area(In Square Meter)
Number of apartmentsNumber of towersApartment/Shops/Other Buildings
24734.728691
Apartment/Shops/Other Buildings23752.08066
1Apartment/Shops/Other Buildings308.016
11Apartment/Shops/Other Buildings
332.37611
Apartment/Shops/Other Buildings342.2561
1(vi) Quarterly schedule of development of whole/remaining part of the project:(c) Apartments/Shops/Other Buildings
Expenditure incurred till the date of application (In Lakhs)ParticularsExpenditure
Apartments0Shops
0Plots0
Expenditure to be made in each quarter (In Lakhs)ParticularsExpenditure to be made in each quarter (
)Apr-JuneJuly-Sep
Oct-DecJan-Mar(d) Infrastructure
Expenditure incurred till the date of application (In Lakhs)ParticularsExpenditure
Roads & Pavements0Water Supply System
0Sewerage treatment & garbage disposal0
Electricity Supply System0Storm Water Drainage
0Parks and Playgrounds0
Clubhouse/community centres0Shopping area
0Other0
Expenditure to be made in each quarter (In Lakhs)ParticularsYear-2025
Jan-MarApr-JuneJuly-Sep
Oct-DecRoads & Pavements0
0Water Supply System0
0Sewerage treatment & garbage disposal0
0Electricity Supply System0
72.66Storm Water Drainage0
0Parks and Playgrounds0
0Clubhouse/community centres0
0Shopping area0
0Other0
0STP47.21
144.79Underground Water Tank52.27
160.30ParticularsYear-2026
Jan-MarApr-JuneJuly-Sep
Oct-DecRoads & Pavements0
000
Water Supply System028.57
164.30164.30Sewerage treatment & garbage disposal
011.1063.84
63.84Electricity Supply System71.08
71.8772.6672.66
Storm Water Drainage015.09
86.7686.76Parks and Playgrounds
000
0Clubhouse/community centres0
000
Shopping area00
00Other
000
0Underground Water Tank156.82
158.5699.320
Security and Fire Fighting00
046.13STP
141.64143.2289.71
0ParticularsYear-2027
Jan-MarApr-JuneJuly-Sep
Oct-DecRoads & Pavements292.14
332.3132.87Water Supply System
160.7317.860
Sewerage treatment & garbage disposal62.466.94
0Electricity Supply System41.86
00Storm Water Drainage
84.879.430
Parks and Playgrounds30.33106.16
0Clubhouse/community centres0
00Shopping area
000
Other00
0Security and Fire Fighting112.21
28.680Street Lighting
20.256.950
Electrical Sub Station158.74215.60
52.12Rain Water Harvesting0
26.1056.31It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - DAccounts related information:
1. Annex copy of the balance sheet of last 3 yearsYes2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.
Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No3. Bank account to which the deposits received from apartment buyers will be credited
Bank and Branch addressICICI BANK LTD, UNIVERSAL TRADE TOWER, SECTOR-49, SOHNA ROAD, GURGAON 122010Bank Account number
777705165105IFSC codeICIC0001651
MICR code110229194Branch code
0016514. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)SATISH KUMAR, MOHIT GARG,
Vikas Garg, Mayank Garg5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)ATTACHED
I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________FORM REP-I
Part - EDetails of the statutory approvals:1. Annex copies of the following in Folder E:
i. Lay out PlanYesii. Demarcation Plan
Yesiii. Zoning PlanYes
iv. Building PlanYesSite Plan
NoFloor PlanNo
Apartment PlansNoElevation Section
NoDetail of Permissible FARYes
Detail of covered area achieved FARYes2. Annex copies of the following in Folder E:
I. Roads And Pavement PlanYesII. ELECTRICITY SUPPLY PLAN
YesIII. WATER SUPPLY PLANYes
IV. Sewerage And Garbage Disposal PlanYesV. STROM WATER DRAINAGE
YesVI. 10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYYes
Vii. Street Lighting PlanNoVIII. PARKING PLAN
No3. Statutory Approvals StatusStatutory Approvals
Statutory Approvals StatusDateI. LICENSE NO. 7 OF 2022
Already Been Obtained19-01-2022II. DEMARCATION CUM ZONING 11260
Already Been Obtained16-07-2025It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees.
Signature _____________Seal _____________Date _____________
Form Rep-IPart - F1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.
Yes2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)(Annex a copy in Folder F)
Yes3. Gist of the important provisions of the Draft Agreement(Annex a copy in Folder F)
Agreement AttachedI hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - GProjects launched by the promoter in last five years:
1. Name and location of the projectANANTAM,VILLAGE BADHA, SECTOR-85, GURUGRAM2. Particulars of the project in brief:
i. Total area of the project5.29375ii. Total number of apartments
617iii. Total number of plots0
3. The number of plots/ apartments booked/sold to the allottees:(a) Apartments100
(b) Plots04. Details of the expenditure incurred upto date:
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project(Other than cost of land)116794.61
00Cost of the apartments
82407.7802343.01
Cost of the infrastructure11762.260
0Others costs22624.66
05273.035. Total amount of money collected from current allottees of the apartments/ plots upto the date of filing this application.
134778 Lakhs6. Remaining amount of sale price money to be collected from the current allottees of the apartments.9932.58 Lakhs
7. Loan sanctioned by the banks/ other financial institutions against the project.0 Lakhs8. Amount drawn from the banks/ other financial institutions till the date of filing this application.
0 Lakhs9. Whether any litigation is pending against the Project:Yes/No
(If yes-give Annex details in folder G)No10. Initial date of completion of the project.
21-10-202811. Likely date of completion of the project.21-10-2028
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - H
Specification Of ConstructionSpecification of apartments and other buildings including the following:1
Flooring Details Of Various Parts Of HouseMARBLE/VITRIFIED TILES/ PORCELEINTILES
2WALL FINISHING DETAILSACRYLIC EMULSION PAINT/OBD
3KITCHEN DETAILSMARBLE/VITRIFIED TILES/ PORCELEIN
Tiles/Granite4BATHROOM FITTINGS
As Per Indian Standard/HINDWARE/ PARRYWARE EQUIVALENT5
Wood Work EtcNA6
Doors And Windos FramesALUMINUM /UPVC/WPC FRAMES WITHTOUGHENED GLASS
7GLASS WORKTOUGHENED/PERFORMANCE GLASS
8ELECTRIC FITTINGSISI MARKED
9CONDUCTING AND WIRING DETAILSISI MARKED
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSOTIS, KONE, SCHINDLER, JOHNSON OR EQUIVALENT
13EXTERNAL GLAZINGSALUMINUM/UPVC/WPC FRAMES WITH
Toughened/Performance Glass13.1WINDOWS/GLAZINGS
Aluminum/Upvc/Wpc Frames WithTOUGHENED/PERFORMANCE GLASS14
DoorsWOODEN/WPC DOORS14.1
Main DoorsLAMINATED WOODEN, WOODEN/WPC DOORS14.2
Internal DoorsWOODEN/WPC DOORS15
Air ConditioningISI MARKED16
Electrical FittingsISI MARKED17
Cng Pipe LineNA18
Provision Of Wifi And Broadband FacilityNA19
External Finishing/Colour SchemeEXTERNAL GRADE PAINT/ TEXTUREPAINT
20INTERNAL FINISHINGACRYLIC EMULSION PAINT/OBD
Specification Unit Wise1 . LIVING/DINING/FOYER/FAMILY LOUNGE1 . 1
FloorMARBLE/VITRIFIED TILES/ PORCELEIN TILES1 . 2
WallsACRYLIC EMULSION PAINT/OBD1 . 3
CeilingOIL BOUND DISTEMPER2 . MASTER BEDROOM/DRESSROOM
2 . 1FLOORMARBLE/VITRIFIED TILES/ PORCELEIN TILES/
Laminated Wooden Flooring2 . 2WALLS
Acrylic Emulsion Paint/Obd2 . 3CEILING
Oil Bound Distemper2 . 4MODULAR WARDROBES
Na3 . MASTER TOILET3 . 1
FloorANTI SKID CERAMIC TILES/ MARBLE3 . 2
WallsCERAMIC TILES & OIL BOUNDED DISTEMPER3 . 3
CeilingGRIS CEILIND/PAINTED FALL CEILING3 . 4
CountersNA3 . 5
Sanitary Ware/Cp FittingsISI MARKED3 . 6
Fitting/FixturesISI MARKED4 . BED ROOMS
4 . 1FLOORMARBLE/VITRIFIED TILES/ PORCELEIN TILES/
Laminated Wooden Flooring4 . 2WALLS
Acrylic Emulsion Paint/Obd4 . 3CEILING
Oil Bound Distemper4 . 4WARDROBES
Na5 . TOILET5 . 1
FloorANTI SKID CERAMIC TILES/ MARBLE5 . 2
WallsCERAMIC TILES & OIL BOUNDED DISTEMPER5 . 3
CeilingPAINTED FALSE CEILING/GRID CEILING5 . 4
CountersNA5 . 5
Sanitary Ware/Cp FittingsISI MARKED5 . 6
FixturesISI MARKED6 . KITCHEN
6 . 1FLOORMARBLE/VITRIFIED TILES/ PORCELEIN TILES/
Laminated Wooden Flooring6 . 2WALLS
Ceramic Tiles And Obd/ AcrylicEMULSION PAINT6 . 3
CeilingOIL BOUNDED DISTEMPER6 . 4
CountersGRANITE/MARBEL/TILES6 . 5
FixturesISI MARKED6 . 6
Kitchen AppliancesNA7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1FLOORCERAMIC TILES
7 . 2WALLS & CEILINGOIL BOUNDED DISTEMPER
7 . 3TOILETCERAMIC TILES
7 . 4BALCONYANTI SKID TILES
8 . Sit-Outs8 . 1FLOOR
Ceramic Tiles8 . 2WALLS & CEILING
Oil Bounded Distemper8 . 3RAILINGS
Ms Ralling/Glass Railing Or Equivalent8 . 4FIXTURES
NaI hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
List of Uploaded DocumentsSr. No.Document Description
Date of Document UploadView Document1
A Complete Set Of The Last Approved Building Plans25-07-2025View Document
2DEMARCATION PLAN25-07-2025
View Document3ZONING PLAN
25-07-2025View Document4
In Case Of Plotted Colony, The Latest Layout Plan25-07-2025View Document
5SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN25-07-2025
View Document6IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN
25-07-2025View Document7
Copy Of License Along With Schedule Of Land02-09-2025View Document
8BUILDING PLAN APPROVAL (CONFIRMATION FROM DTP)02-09-2025
View Document9STORM LAYOUT PLAN
02-09-2025View Document10
Zoning Approval Letter Sector 89 & 9302-09-2025View Document
11DEMAND DRAFT RS. 992200- KASHI RESIDENCES02-09-2025
View Document12COLLABORATION AGREEMENT MRG CASTLE AND MRG ESTATES 5 ACRES
02-09-2025View Document13
Supplementary Agreement Jai Ganga Realtech LLP 13.04.202302-09-2025View Document
14PERT CHART KASHI RESIDENCES02-09-2025
View Document15SUPERIMPOSED
02-09-2025View Document16
Nec 2502-09-2025View Document
17REVISED LAYOUT PLAN02-09-2025
View Document18NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT
02-09-2025View Document19
Lc IV And Lc V02-09-2025View Document
20DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD02-09-2025
View Document21AAI NOC
02-09-2025View Document22
Balance Sheet -Mrg Estate LLP (Fy-21-22)02-09-2025View Document
23CASH FLOW STATEMENT OF THE PROPOSED PROJECT02-09-2025
View Document24CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT
02-09-2025View Document25
Demarcation Cum Zoning Plan Sector 89 & 9302-09-2025View Document
26DRINKING WATER APPROVAL02-09-2025
View Document27FOREST NOC
02-09-2025View Document28
Jai Ganga Realtech LLP Fy 2022-2302-09-2025View Document
29CURRENT JAMABANDI 2025 9302-09-2025
View Document30JAMABANDI 25 89
02-09-2025View Document31
LLP Agreement Mrg Estates LLP02-09-2025View Document
32LOI02-09-2025
View Document33MRG ESTATE AUDIT REPORT FY 21-22
02-09-2025View Document34
Mutation 202502-09-2025View Document
35NEC 202502-09-2025
View Document36POA MRG CASTLE AND MRG ESTATES
02-09-2025View Document37
Declaration Supported By Affidavit Duly Signed By The Promoter To Be Enclosed.02-09-2025View Document
38SEWARAGE APPROVAL-89 DDJAY02-09-2025
View Document39STP TREATED WATER-89 DDJAY
02-09-2025View Document40
Water Supply Layout Plan02-09-2025View Document
41NOC ARAVLI 89 & 9302-09-2025
View Document42NOC FOREST KASHI RESIDENCES
02-09-2025View Document43
Project Report Kashi Residences02-09-2025View Document
44REVISED CA CERTIFICATE COST INCUREED SECTOR 89 & 93 KASHI RESIDENCES02-09-2025
View Document45ROAD LAYOUT PLAN
02-09-2025View Document46
Sewer Layout Plan02-09-2025View Document
47SIZRA 2502-09-2025
View Document48SUPPLEMENTARY AGREEMENT MRG ESTATES 07.02.2023
02-09-2025View Document49
Title Search Report02-09-2025View Document
I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________Print

Statutory approvals

ApprovalStatusDate
License No. 7 Of 2022Already Been Obtained19 Jan 2022
Demarcation Cum Zoning 11260Already Been Obtained16 Jul 2025

Specifications (as filed)

Flooring Details Of Various Parts Of HouseMarble/Vitrified Tiles/ Porcelein

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Kashi Residences?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp