Kashi

by Jai Ganga Realtech LLP · Village Badha And Hayatpur, Sector 89 & 93

RERA registration
GGM/977/709/2025/80
Registered on
27 Aug 2025
Valid till
11 Jan 2027
Project ID
RERA-GRG-2013-2025
Land area
5 acres
Plots
70
Completion (as filed)
11 Jan 2027
Estimated cost
₹ 142.08 Cr

RERA registration

Registration certificateGGM/977/709/2025/80, dated 27 Aug 2025
Registration valid till11 Jan 2027
Project IDRERA-GRG-2013-2025
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameKashi
Site addressVillage Badha And Hayatpur, Sector 89 & 93
SectorSector 89
Tehsil / DistrictGurgaon / Gurugram
Layout plan approved19 Jun 2025
Construction start (as filed)1 May 2025
Completion (as filed)11 Jan 2027
Application submitted19 Jul 2025

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Initial scrutinyFirst hearing on 18.08.2025
Next hearingNot Required
  1. Application submitted online
  2. Application received by HRERA Gurugram
  3. Notice sent to the promoter Dispatched
  1. Hearing Approved And Ready For Certificate Issuing Process View order
    Proceedings

    Ar. Neeraj Gautam, Associate Architectural Executive and Ms. Asha, Chartered Accountant briefed about the facts of the project. Sh. Neeraj Mishra (AR) and Sh. Ashwani Kumar (AR) are present on behalf of the promoter. The site of the project is visited by the concerned officials and it is confirmed that the site is accessible through service road of the existing 60 m wide road. The registration of the project is approved as proposed subject to rectification of deficiencies listed above at S. No. 21 and deposit of security amount of Rs.  25 lakhs on account of submission of approved service plans and estimates within four months from the issuance of registration certificate. The registration certificate shall be issued after the above compliance is made by the promoter.

  2. Registration granted GGM/977/709/2025/80
  3. Certificate uploaded RC Uploaded
  1. Registration valid till

Land, licence & cost

Land area of the project5 acres
Total licensed area5 acres
Licence7 OF 2022 DATED 19.01.2022
FAR permissible / proposed1 / 1
Estimated project cost₹ 142.08 Cr
Cost of land₹ 47.94 Cr
Infrastructure and other structures₹ 41.64 Cr
EDC, taxes, levies and other costs₹ 52.5 Cr

How the land will be used

UseAcresShare
Plots To Be Sold2.55151%
Construction Of Roads1.333526.7%
Parks And Playgrounds0.3757.5%
Electricity Sub-Station0.0370.7%
Area To Be Left For Transferring To The Government For Community Services0.510%
Commercialarea0.24%
Roadareatobetakeninlicensedarea0.00350.1%

Plots 70 plots

Plot size (sq m)Sq ydSq ftPlots
134.701611,4501
143.101711,5401
147.211761,5851
150.001791,61566
809.379688,7121

External services

ServiceProvided byApproval taken
RoadsNoWATER SUPPLY
GMDAYesELECTRICITY
NoSEWAGE DISPOSALGMDA
YesSTORM WATER DRAINAGEGMDA
Yes4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:Sr. No.
Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS657.32
Yet To Be Prepared2WATER SUPPLY SYSTEM
535.78YET TO BE PREPARED3
Storm Water Drainage282.90YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM426.47
Yet To Be Prepared5SEWAGE TREATMENT & GARBAGE DISPOSAL
566.57YET TO BE PREPARED6
Street Lighting27.20YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING187.02
Yet To Be Prepared8PLAYGROUNDS AND PARKS
136.49YET TO BE PREPARED9
Club House/Community Centre0YET TO BE PREPARED
10SHOPPING AREA0
Yet To Be Prepared11RENEWABLE ENERGY SYSTEM
0YET TO BE PREPARED12
School0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0
Yet To Be Prepared14ANY OTHER
0YET TO BE PREPARED15
Underground Water Tank627.27YET TO BE PREPARED
16RAIN WATER HARVESTING82.41
Yet To Be Prepared17ELECTRICAL SUB STATION
426.47YET TO BE PREPARED18
Sewerage Sysytem208.19YET TO BE PREPARED
5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.19-06-2025(date)
6. Date of approval of Building PlansNA(date)
7. New projects:i) Likely date of starting the construction work01-05-2025
ii) Likely date of completing the project11-01-2027iii) Sizes of the plots to be offered in the project
Sr. NoPlot Area(In Square Meter)Number of plots in the project
1150.0066
2134.7031
3143.0961
4147.2071
5809.371
Total70iv. Type of apartments to be constructed in the project:
TypeCarpet area(In Square Meter)Number of apartments
Number of towersApartment/Shops/Other Buildings0
00(vi) Quarterly schedule of development of whole/remaining part of the project:
(c) Apartments/Shops/Other BuildingsExpenditure incurred till the date of application (In Lakhs)Particulars
ExpenditureApartments0
Shops0Plots
0Expenditure to be made in each quarter (In Lakhs)Particulars
Expenditure to be made in each quarter ()Apr-June
July-SepOct-DecJan-Mar
(d) InfrastructureExpenditure incurred till the date of application (In Lakhs)Particulars
ExpenditureRoads & Pavements0
Water Supply System0Sewerage treatment & garbage disposal
0Electricity Supply System0
Storm Water Drainage0Parks and Playgrounds
0Clubhouse/community centres0
Shopping area0Other
0Expenditure to be made in each quarter (In Lakhs)Particulars
Year-2025Jan-MarApr-June
July-SepOct-DecRoads & Pavements
2.92134.39Water Supply System
109.54109.54Sewerage treatment & garbage disposal
42.5642.56Electricity Supply System
217.97208.50Storm Water Drainage
57.8457.84Parks and Playgrounds
00Clubhouse/community centres
00Shopping area
00Other
00STP
193.05193.05Street lighting
00.60Security and Fire Fighting
04.16Electrical Sub Station
07.11Underground Water Tank
213.74213.74Particulars
Year-2026Jan-MarApr-June
July-SepOct-DecRoads & Pavements
131.46132.93134.39
121.24Water Supply System107.16
108.35101.200
Sewerage treatment & garbage disposal41.6442.10
39.320Electricity Supply System
000
0Storm Water Drainage56.58
57.2153.440
Parks and Playgrounds056.87
69.769.86Clubhouse/community centres
000
0Shopping area0
000
Other00
00Electrical Sub Station
159.93161.7097.73
Security and Fire Fighting93.5189.35
Street Lighting13.6012.99
Rainwater Harvesting2.2050.00
30.22STP180.46
Underground Water Tank199.80It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - DAccounts related information:
1. Annex copy of the balance sheet of last 3 yearsYes2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.
Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No3. Bank account to which the deposits received from apartment buyers will be credited
Bank and Branch addressICICI BANK LTD, SHOP NO. 6 ,MAGNUM CITY CENTRE, SEC 63A,GURGAON-122011Bank Account number
777705539616IFSC codeICIC0005396
MICR code110229411Branch code
53964. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)SATISH KUMAR, MOHIT GARG,
Vikas Garg, Mayank Garg5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)ATTACHED
I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________FORM REP-I
Part - EDetails of the statutory approvals:1. Annex copies of the following in Folder E:
i. Lay out PlanYesii. Demarcation Plan
Yesiii. Zoning PlanYes
iv. Building PlanNoSite Plan
YesFloor PlanNo
Apartment PlansNoElevation Section
NoDetail of Permissible FARNo
Detail of covered area achieved FARNo2. Annex copies of the following in Folder E:
I. Roads And Pavement PlanYesII. ELECTRICITY SUPPLY PLAN
NoIII. WATER SUPPLY PLANYes
IV. Sewerage And Garbage Disposal PlanYesV. STROM WATER DRAINAGE
YesVI. 10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYYes
Vii. Street Lighting PlanNoVIII. PARKING PLAN
No3. Statutory Approvals StatusStatutory Approvals
Statutory Approvals StatusDateI. LICENSE NO. 7 OF 2022
Already Been Obtained19-01-2022II. DEMARCATION CUM ZONING 11260
Already Been Obtained16-07-2025III. REVISED LAYOUT PLAN
Already Been Obtained19-06-2025IV. REVISED ZOINING
Already Been Obtained17-07-2025It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees.
Signature _____________Seal _____________Date _____________
Form Rep-IPart - F1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.
Yes2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)(Annex a copy in Folder F)
Yes3. Gist of the important provisions of the Draft Agreement(Annex a copy in Folder F)
Agreement AttachedI hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - GProjects launched by the promoter in last five years:
1. Name and location of the projectANANTAM,VILLAGE NAURANGPUR, SECTOR-78, GURUGRAM2. Particulars of the project in brief:
i. Total area of the project5.29375ii. Total number of apartments
617iii. Total number of plots0
3. The number of plots/ apartments booked/sold to the allottees:(a) Apartments100
(b) Plots04. Details of the expenditure incurred upto date:
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project(Other than cost of land)116794.61
00Cost of the apartments
82407.7802343.01
Cost of the infrastructure11762.260
0Others costs22624.66
05273.035. Total amount of money collected from current allottees of the apartments/ plots upto the date of filing this application.
134778 Lakhs6. Remaining amount of sale price money to be collected from the current allottees of the apartments.9932.58 Lakhs
7. Loan sanctioned by the banks/ other financial institutions against the project.0 Lakhs8. Amount drawn from the banks/ other financial institutions till the date of filing this application.
0 Lakhs9. Whether any litigation is pending against the Project:Yes/No
(If yes-give Annex details in folder G)No10. Initial date of completion of the project.
21-10-202811. Likely date of completion of the project.21-10-2028
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - H
Specification Of ConstructionSpecification of apartments and other buildings including the following:1
Flooring Details Of Various Parts Of HouseNA2
Wall Finishing DetailsNA3
Kitchen DetailsNA4
Bathroom FittingsNA5
Wood Work EtcNA6
Doors And Windos FramesNA7
Glass WorkNA8
Electric FittingsNA9
Conducting And Wiring DetailsNA10
Cupboard DetailsNA11
Water StorageNA12
Lift DetailsNA13
External GlazingsNA13.1
Windows/GlazingsNA14
DoorsNA14.1
Main DoorsNA14.2
Internal DoorsNA15
Air ConditioningNA16
Electrical FittingsNA17
Cng Pipe LineNA18
Provision Of Wifi And Broadband FacilityNA19
External Finishing/Colour SchemeNA20
Internal FinishingNASPECIFICATION UNIT WISE
1 . Living/Dining/Foyer/Family Lounge1 . 1FLOOR
Na1 . 2WALLS
Na1 . 3CEILING
Na2 . MASTER BEDROOM/DRESSROOM2 . 1
FloorNA2 . 2
WallsNA2 . 3
CeilingNA2 . 4
Modular WardrobesNA3 . MASTER TOILET
3 . 1FLOORNA
3 . 2WALLSNA
3 . 3CEILINGNA
3 . 4COUNTERSNA
3 . 5SANITARY WARE/CP FITTINGSNA
3 . 6FITTING/FIXTURESNA
4 . Bed Rooms4 . 1FLOOR
Na4 . 2WALLS
Na4 . 3CEILING
Na4 . 4WARDROBES
Na5 . TOILET5 . 1
FloorNA5 . 2
WallsNA5 . 3
CeilingNA5 . 4
CountersNA5 . 5
Sanitary Ware/Cp FittingsNA5 . 6
FixturesNA6 . KITCHEN
6 . 1FLOORNA
6 . 2WALLSNA
6 . 3CEILINGNA
6 . 4COUNTERSNA
6 . 5FIXTURESNA
6 . 6KITCHEN APPLIANCESNA
7 . Utility Rooms/Utility Balcony/Toilet7 . 1FLOOR
Na7 . 2WALLS & CEILING
Na7 . 3TOILET
Na7 . 4BALCONY
Na8 . SIT-OUTS8 . 1
FloorNA8 . 2
Walls & CeilingNA8 . 3
RailingsNA8 . 4
FixturesNAI hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________List of Uploaded DocumentsSr. No.
Document DescriptionDate of Document UploadView Document
1NOC ARAVLI26-08-2025
View Document2MUTATION 2025
26-08-2025View Document3
Zoning Plan19-07-2025View Document
4IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN26-08-2025
View Document5AFFIDAVIT FOR LANDOWNER SHARE
28-08-2025View Document6
In Case Of Group Housing/ Commercial Sites, A Copy Of The Approved Site Plan19-07-2025View Document
7A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS19-07-2025
View Document8DEMARCATION PLAN
19-07-2025View Document9
Documents Relating To The Entry Of License And Collaboration Agreement In The Revenue Record18-07-2025View Document
10SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN19-07-2025
View Document11UNDERTAKING NCZ, TREE CUTTING AND OTHERS
26-08-2025View Document12
Undertaking For No Sale Of Plot28-08-2025View Document
13COLLABORATION AGREEMENT26-08-2025
View Document14AFFIDAVIT 4(2)(1)(D)
26-08-2025View Document15
Undertaking Regarding 10% Edc26-08-2025View Document
16UNDERTAKING FOR NO CHARGE CREATION26-08-2025
View Document17BANK UNDERTAKING
26-08-2025View Document18
Jamabandi 25 8926-08-2025View Document
19SEWARAGE ASSURANCE26-08-2025
View Document20STP TREATED WATER ASSURANCE
26-08-2025View Document21
Aai Noc 5 Acres 89 DDJAY26-08-2025View Document
22WATER SUPPLY LAYOUT PLAN26-08-2025
View Document23CASH FLOW STATEMENT OF THE PROPOSED PROJECT
26-08-2025View Document24
Non Default Certificate From A Chartered Accountant26-08-2025View Document
25ANNEX C RULE 1426-08-2025
View Document26SIZRA 25
26-08-2025View Document27
Loi26-08-2025View Document
28DEMARCATION CUM ZONING PLAN SECTOR 89 & 9326-08-2025
View Document29LC IV AND LC IV B
26-08-2025View Document30
Current Jamabandi 2025 9326-08-2025View Document
31DRINKING WATER ASSURANCE26-08-2025
View Document32FOREST NOC
26-08-2025View Document33
Copy Of License Along With Schedule Of Land26-08-2025View Document
34NON ENCUMBRANCE26-08-2025
View Document35CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT
26-08-2025View Document36
Declaration Supported By Affidavit Duly Signed By The Promoter To Be Enclosed.26-08-2025View Document
37ROAD LAYOUT PLAN26-08-2025
View Document38ZONING APPROVAL LETTER SECTOR 89 & 93
26-08-2025View Document39
Sewer Layout Plan26-08-2025View Document
40SIZRA SUPERIMPOSED LAYOUT26-08-2025
View Document41STORM LAYOUT PLAN
26-08-2025View Document42
No Proposed Sale Affidavit28-08-2025View Document
I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________Print

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 6.57 CrYet To Be Prepared
Water Supply System₹ 5.36 CrYet To Be Prepared
Storm Water Drainage₹ 2.83 CrYet To Be Prepared
Electricity Supply System₹ 4.26 CrYet To Be Prepared
Sewage Treatment & Garbage Disposal₹ 5.67 CrYet To Be Prepared
Street Lighting₹ 27.2 lakhYet To Be Prepared
Security And Fire Fighting₹ 1.87 CrYet To Be Prepared
Playgrounds And Parks₹ 1.36 CrYet To Be Prepared
Underground Water Tank₹ 6.27 CrYet To Be Prepared
Rain Water Harvesting₹ 82.41 lakhYet To Be Prepared
Electrical Sub Station₹ 4.26 CrYet To Be Prepared
Sewerage Sysytem₹ 2.08 CrYet To Be Prepared

Statutory approvals

ApprovalStatusDate
License No. 7 Of 2022Already Been Obtained19 Jan 2022
Demarcation Cum Zoning 11260Already Been Obtained16 Jul 2025
Revised Layout PlanAlready Been Obtained19 Jun 2025
Revised ZoiningAlready Been Obtained17 Jul 2025

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Kashi?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.