RERA registration
Registration certificateHRERA-PKL-FBD-170-2019
Registration valid till31 Dec 2025
Project IDRERA-PKL-605-2019
AuthorityHRERA Panchkula
Project type (as filed)New
Project nameHabitat Residences
PromoterConscient Infrastructure Private Limited
Promoter’s registered office10TH Floor, Tower-D, Global Business Park M.g Road Gurugram 122002 Hr
CINU74899DL1990PTC039324
Site addressVillage-Faridpur, Sector-78, Faridabad
SectorSector 78
Tehsil / DistrictFaridabad / Faridabad
Layout plan approved10 Jun 2019
Building plans approved20 Sep 2019
Construction start (as filed)1 Apr 2020
Completion (as filed)31 Dec 2025
Application submitted25 Oct 2019
Authority, hearings & orders
Current status Approved And Certificate Uploaded
Initial scrutiny Listed for first hearing.
Next hearing Not Required
9 Sep 2019
Application received by HRERA Panchkula
16 Sep 2019
Hearing
Examination By Authority View order Proceedings Adjourned to 07.10.2019.
7 Oct 2019
Hearing
Approved And Ready For Certificate Issuing Process View order Proceedings Registration Certificate to be issued.
25 Oct 2019
Application submitted online
31 Dec 2025
Registration valid till
Land, licence & cost
Land area of the project5.081 acres
Total licensed area5.081 acres
Licence63 of 2019 dated 05/06/2019
FAR permissible / proposed225 / 258.75
Estimated project cost₹ 133 Cr
Cost of land₹ 30 Cr
Cost of construction₹ 86.75 Cr
Infrastructure and other structures₹ 8.25 Cr
EDC, taxes, levies and other costs₹ 8 Cr
How the land will be used
Use Sq m Share
Land Area To Be Used For Construction Of Apartments5,353 26% Construction Of Roads4,945.2 24% Parks And Playgrounds1,800 8.8% Green Belts2,565.4 12.5% Vehicle Parkings2,518 12.2% Electricity Sub-Station364 1.8% Sewage And Solid Waste Treatment Facility15 0.1% Any Other1,017 4.9% Community186 0.9% Commercial1,554.5 7.6% Electrical31.3 0.2% Anganwadi Cum Creche186.5 0.9% Milk Booth27.5 0.1%
Apartments 732 units · 9 towers
Type Carpet area (sq m) Carpet area (sq ft) Units
Apartment/Shops/Other Buildings59.08 636 345 Apartment/Shops/Other Buildings60.00 646 347 Apartment/Shops/Other Buildings48.07 517 20 Apartment/Shops/Other Buildings48.98 527 20
Areas are as filed with HRERA.
External services
Service Provided by Approval taken
RoadsHUDA No Water SupplyHUDA No ElectricityDHBVN No Sewage DisposalHUDA No Storm Water DrainageHUDA No LicenseDTCP Yes Building PlanDTCP No Zoning PlanDTCP Yes Demarcation PlanDTCP Yes Power AssuranceDHBVN Yes License Entry In Revenue RecordREVENUE DEPARTMENT Yes Water AssuranceHUDA Yes
Facilities in the service plan
Facility Estimated cost Status
Internal Roads And Pavements₹ 1.27 Cr Yet To Be Prepared Water Supply System₹ 1.68 Cr Yet To Be Prepared Storm Water Drainage₹ 45.92 lakh Yet To Be Prepared Electricity Supply System₹ 25 lakh Yet To Be Prepared Sewage Treatment & Garbage Disposal₹ 1.16 Cr Yet To Be Prepared Street Lighting₹ 19.49 lakh Yet To Be Prepared Security And Fire Fighting₹ 50 lakh Yet To Be Prepared Playgrounds And Parks₹ 3.49 lakh Yet To Be Prepared Club House/Community Centre₹ 27 lakh Yet To Be Prepared Shopping Area₹ 2.26 Cr Yet To Be Prepared Renewable Energy System₹ 14.5 lakh Yet To Be Prepared Any Other₹ 3 lakh Yet To Be Prepared
Statutory approvals
Approval Status Date
LicenseAlready Been Obtained 10 Jun 2019
Zoning PlanAlready Been Obtained 10 Jun 2019
Power AssuranceAlready Been Obtained 25 Jun 2019
License Entry In Revenue RecordAlready Been Obtained 14 Jun 2019
Water AssuranceAlready Been Obtained 11 Jul 2019
Building PlanApplied For But Yet To Receive 11 Jun 2019
Specifications (as filed)
Flooring Details Of Various Parts Of HouseTiles - 600 X 600 Vitrified And 300 X 300 Ceramic Wall Finishing DetailsExternal Walls - Apex / Weather Exterior Texture Emulsion Paint And Internal Walls - White Wash / Color Wash. Kitchen DetailsStone Counter-Top With 2 Feet Tiles Above The Counter. The Floors Are Made Up Of Tiles Bathroom FittingsCp Fitting And Fixtures Isi Marked Doors And Windos FramesMs/Aluminium Are Finished With Enamel Paint Glass WorkFixed Glass - 4/5/6 Mm Conducting And Wiring DetailsPvc Conduits With Pvc Insulated Wiring. Water StorageUnderground Tanks (Raw + Treated + Fire) + Oh Tanks (Treated + Fire) Lift Details18 Lifts, In Which 9 Are Passenger And Remaining 9 Are Stretcher Lift. Windows/GlazingsMs/Aluminium Windows With Glass 4/5/6 Mm. DoorsMs Door Frame & Flush Door Shutters Are Finished With Enamel Paint Main DoorsMs Door Frame & Flush Door Shutters Are Finished With Enamel Paint Internal DoorsMs Door Frame & Flush Door Shutters Are Finished With Enamel Paint Electrical FittingsIsi Marked Fitting External Finishing/Colour SchemeWeather Exterior Texture Emulsion Paint Internal FinishingWhite Wash / Color Wash
Source: HRERA Panchkula, Form REP-I , read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.