Registration validHRERA Gurugram

Elaira Residences Phase-1

by Conscient Infrastructure Private Limited · Village Naurangpur, Sector-80

RERA registration
GGM/917/649/2025/20
Registered on
20 Feb 2025
Valid till
31 Mar 2031
Project ID
RERA-GRG-1863-2025
Apartments
268 in 2 towers
Completion (as filed)
31 Dec 2031
Estimated cost
₹ 710.61 Cr

RERA registration

Registration certificateGGM/917/649/2025/20, dated 20 Feb 2025
Registration valid till31 Mar 2031
Project IDRERA-GRG-1863-2025
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameElaira Residences Phase-1
PromoterConscient Infrastructure Private Limited
Promoter’s registered office10TH Floor Global Business Park, Tower D, Mg Road, Gurugram-122002
CINU74899DL1990PTC039324
Site addressVillage Naurangpur, Sector-80
SectorSector 80
Tehsil / DistrictManesar / Gurugram
Layout plan approved17 Jan 2025
Building plans approved17 Jan 2025
Construction start (as filed)1 Sep 2025
Completion (as filed)31 Dec 2031
Application submitted23 Jan 2025

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Initial scrutinyFirst hearing on 17.02.2025
Next hearingNot Required
  1. Application submitted online
  2. Application received by HRERA Gurugram
  3. Notice sent to the promoter By Hand
  1. Hearing Approved And Ready For Certificate Issuing Process View order
    Proceedings

    Sh. Ashish Kush, Planning Executive and Ms. Asha, Chartered Accountant briefed about the facts of the case. Sh. SK Kaushik (AR), Sh, Ajay Gupta (AR) and Sh. Mukesh Tripathi (AR) are present on behalf of the promoter. Regarding the provisioning of services, HSIIDC vide letter dated 14.11.2024 has intimated that water and sewerage connection etc. will be supplied after completion of infrastructure services expected up to 30.04.2026. Approved as proposed subject to correction in A-H form, Online DPI and submission of BG/DD amounting to Rs. 25 lakhs as a security amount in lieu of submission of Approved Environment Clearance within 4 months from the grant of registration certificate. The promoter shall submit the mining permission before start of construction. The Registration Certificate shall be issued after submission of correction in A-H form, Online DPI and BG/DD of Rs. 25 lakhs for submission of Approved Environment Clearance.

  2. Registration granted GGM/917/649/2025/20
  3. Certificate uploaded RC Uploaded
  1. Registration valid till

Land, licence & cost

LicenceHSIIDC allotted the site vide Regular Allotment Letter (RLA) No. 9277 dated 29-07-2024, therefore, the very first license/RLA of the project is 29-07-2024
FAR permissible / proposed1.9 / 1.86
Estimated project cost₹ 710.61 Cr
Cost of land₹ 109.59 Cr
Cost of construction₹ 412.53 Cr
EDC, taxes, levies and other costs₹ 188.49 Cr

How the land will be used

UseArea (as filed)Share
Land Area To Be Used For Construction Of Apartments1,236.386.3%
Construction Of Roads7,497.50438%
Pavements1,860.4239.4%
Parks And Playgrounds1,413.137.2%
Green Belts4,527.91423%
Vehicle Parkings4912.5%
Electricity Sub-Station844.914.3%
Club House1,345.7436.8%
Sewage And Solid Waste Treatment Facility5022.5%

Apartments 268 units · 2 towers

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings104.551,12562
Apartment/Shops/Other Buildings114.281,23034
Apartment/Shops/Other Buildings114.431,23231
Apartment/Shops/Other Buildings127.031,36734
Apartment/Shops/Other Buildings126.981,36762
Apartment/Shops/Other Buildings138.591,49231
Apartment/Shops/Other Buildings138.591,4921
Apartment/Shops/Other Buildings114.431,2321
Apartment/Shops/Other Buildings104.841,1286
Apartment/Shops/Other Buildings127.271,3706

Areas are as filed with HRERA.

External services

ServiceProvided byApproval taken
RoadsALREADY CONNECTEDYes
Water SupplyHSIIDC/IMT/ESTATE/2024/1295Yes
ElectricityHSIIDC/ENGG./IMT/25/ 3788Yes
Sewage DisposalHSIIDC/IMT/ESTATE/2024/1295Yes
Storm Water DrainageHSIIDC/IMT/ESTATE/2024/1295Yes

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 1.95 CrAs Per Project Report
Water Supply System₹ 3.17 CrAs Per Project Report
Storm Water Drainage₹ 35.91 lakhAs Per Project Report
Electricity Supply System₹ 48 lakhAs Per Project Report
Sewage Treatment & Garbage Disposal₹ 38.78 lakhAs Per Project Report
Street Lighting₹ 21.48 lakhAs Per Project Report
Security And Fire Fighting₹ 32.8 lakhAs Per Project Report
Playgrounds And Parks₹ 5.6 lakhAs Per Project Report
Club House/Community Centre₹ 27.24 CrAs Per Project Report
Renewable Energy System₹ 60 lakhAs Per Project Report

Statutory approvals

ApprovalStatusDate
Electricity Load AvailabilityAlready Been Obtained7 Jan 2025
Storm Water DrainageAlready Been Obtained14 Nov 2024
Zoning Plan ApprovalAlready Been Obtained30 Oct 2024
Forest NocAlready Been Obtained14 Nov 2024
Water SupplyAlready Been Obtained14 Nov 2024
Sewage DisposalAlready Been Obtained14 Nov 2024

Specifications (as filed)

Flooring Details Of Various Parts Of HouseMarble/ Premium Quality Tiles/ Equivalent
Wall Finishing DetailsPaint Surface
Kitchen DetailsFloor Tiles & Paint
Bathroom FittingsStandard Cp Fitting + Wc+Washbasin
Wood Work EtcFlush Floor
Doors And Windos FramesDouble/Single Glass
Electric FittingsLed Fixtures
Conducting And Wiring DetailsFrls Insultated Copper Conductor Wire
Water StorageWater Tank Ug/Oh
Lift DetailsPassenger/Service/Fireman Lift
Windows/GlazingsAluminium/ Upvc/ Equivalent
Main DoorsFlush Door
Internal DoorsBoth Side Laminated
Air ConditioningVrv System
Electrical FittingsLed Fixtures
External Finishing/Colour SchemeTexture Paint
Internal FinishingPaint Surface

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Elaira Residences Phase-1?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.