Registration validHRERA Gurugram

Elevate Reserve

by Conscient Infrastructure Private Limited · Sector-62, Village Ullhawas, Wazirabad, Gurugram, Haryana

RERA registration
GGM/757/489/2023/101
Registered on
6 Nov 2023
Valid till
30 Oct 2030
Project ID
RERA-GRG-1448-2023
Land area
4.844 acres
Apartments
474 in 2 towers
Completion (as filed)
1 Oct 2030
Estimated cost
₹ 1,083.59 Cr

RERA registration

Registration certificateGGM/757/489/2023/101, dated 6 Nov 2023
Registration valid till30 Oct 2030
Project IDRERA-GRG-1448-2023
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameElevate Reserve
PromoterConscient Infrastructure Private Limited
Promoter’s registered office10TH Floor Global Business Park, Tower D, Mg Road, Gurugram-122002
CINU74899DL1990PTC039324
Site addressSector-62, Village Ullhawas, Wazirabad, Gurugram, Haryana
SectorSector 62
Tehsil / DistrictWazirabad St / Gurugram
Layout plan approved31 Oct 2023
Building plans approved31 Oct 2023
Construction start (as filed)29 Feb 2024
Completion (as filed)1 Oct 2030
Application submitted21 Oct 2023

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Initial scrutinyFirst hearing
Next hearingNot Required
  1. Application submitted online
  2. Application received by HRERA Gurugram
  3. Notice sent to the promoter By Hand
  1. Hearing Approved And Ready For Certificate Issuing Process View order
    Proceedings

    Sh. Ashish Kush, Planning Executive and Ms. Asha, Chartered Accountant briefed about the facts of the case. Sh. S.K. Kaushik (AR) and Sh. Ajay Gupta (AR) are present on behalf of the promoter. The promoter shall submit the fire scheme approval within 4 months, Environment Clearance and approval of service plans and estimates within 6 months from the date of issuance of registration certificate and mining permission shall be submitted before the commencement of the construction. Approved as proposed. 

  2. Registration granted GGM/757/489/2023/101
  3. Certificate uploaded RC Uploaded
  1. Registration valid till

Land, licence & cost

Land area of the project4.844 acres
Total licensed area4.844 acres
LicenceLicence No. 114/2023 dated 02.06.2023 granted by Town and Country Planning Department, Haryana Government
FAR permissible / proposed3.228 / 3.228
Estimated project cost₹ 1,083.59 Cr
Cost of land₹ 301.49 Cr
Cost of construction₹ 464.4 Cr
Infrastructure and other structures₹ 67.25 Cr
EDC, taxes, levies and other costs₹ 250.45 Cr

How the land will be used

UseAcresShare
Land Area To Be Used For Construction Of Apartments0.43729%
Construction Of Roads1.024721.2%
Pavements0.762315.7%
Parks And Playgrounds0.96920%
Club House0.35257.3%
Any Other1.29826.8%

Apartments 474 units · 2 towers

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings35,866.64-240
Apartment/Shops/Other Buildings7,605.40-190
Apartment/Shops/Other Buildings1,426.6115,3561
Apartment/Shops/Other Buildings1,001.6010,78143

Areas are as filed with HRERA. Some rows show a total built-up area rather than one home’s carpet area, as entered by the promoter.

External services

ServiceProvided byApproval taken
RoadsALREADY CONNECTEDNo
Water SupplyGMDAYes
ElectricityDHBVNYes
Sewage DisposalGMDAYes
Storm Water DrainageGMDAYes

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 4.22 CrAs Per Project Report
Water Supply System₹ 3.02 CrAs Per Project Report
Storm Water Drainage₹ 70.64 lakhAs Per Project Report
Sewage Treatment & Garbage Disposal₹ 55.48 lakhAs Per Project Report
Street Lighting₹ 64 lakhAs Per Project Report
Security And Fire Fighting₹ 41.83 lakhAs Per Project Report
Playgrounds And Parks₹ 40.6 lakhAs Per Project Report
Club House/Community Centre₹ 35 CrAs Per Project Report
Renewable Energy System₹ 52 lakhAs Per Project Report
Parking₹ 9.27 CrAs Per Project Report
Stp₹ 60 lakhAs Per Project Report
Electrical Sub Station₹ 2.23 CrAs Per Project Report
Over Head Water Tanks₹ 38.22 lakhAs Per Project Report
Rain Water Harvesting₹ 51 lakhAs Per Project Report
Underground Water Tank₹ 42.16 lakhAs Per Project Report

Statutory approvals

ApprovalStatusDate
Electricity Load AvailabilityAlready Been Obtained9 Jun 2023
Storm Water DrainageAlready Been Obtained16 Jun 2023
Zoning Plan ApprovalAlready Been Obtained2 Jun 2023
Forest NocAlready Been Obtained28 Apr 2023
Tree Cutting PermissionAlready Been Obtained10 Jul 2023
Water SupplyAlready Been Obtained22 Jun 2023
Sewage DisposalAlready Been Obtained15 Jun 2023

Specifications (as filed)

Flooring Details Of Various Parts Of HouseMarble/ Premium Quality Tiles/ Equivalent
Wall Finishing DetailsPaint Surface
Kitchen DetailsFloor Tiles & Paint
Bathroom FittingsStandard Cp Fitting + Wc+Washbasin
Wood Work EtcFlush Floor
Doors And Windos FramesDouble/Single Glass
Electric FittingsLed Fixtures
Conducting And Wiring DetailsFrls Insultated Copper Conductor Wire
Water StorageWater Tank Ug/Oh
Lift DetailsPassenger/Service/Fireman Lift
Windows/GlazingsAluminium/ Upvc/ Equivalent
Main DoorsFlush Door
Internal DoorsBoth Side Laminated
Air ConditioningVrv System
Electrical FittingsLed Fixtures
External Finishing/Colour SchemeTexture Paint
Internal FinishingPaint Surface

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Elevate Reserve?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.