Vatika Triangle, 4TH Floor, Sushant Lok, Phase-I, Block-A, M. G. Road, Gurugram-122 002.
CIN
U74899HR1998PLC054821
Site address
Sector-88A & 88B
Sector
Sector 88
Tehsil / District
Kadipur St / Gurugram
Layout plan approved
5 May 2016
Building plans approved
5 May 2016
Application submitted
13 Feb 2020
Authority, hearings & orders
Current statusApproved And Certificate Uploaded
Next hearingNot Required
Registration granted271 OF 2017
Application submitted online
Registration valid till
Land, licence & cost
Land area of the project
9.548 acres
Total licensed area
100.576 acres
Licence
9.548 Acres is Part of License No. 94 of 2013 dated 31.10.2013
FAR permissible / proposed
100 / 45.78
Estimated project cost
₹ 124.64 Cr
Cost of land
₹ 6.38 Cr
Cost of construction
₹ 91.15 Cr
Infrastructure and other structures
₹ 8.85 Cr
EDC, taxes, levies and other costs
₹ 18.27 Cr
How the land will be used
Use
Area (as filed)
Share
Plots To Be Sold
20.1409
20.8%
Construction Of Roads
19.47
20.1%
Pavements
6.49
6.7%
Parks And Playgrounds
6.05
6.3%
Green Belts
1.21
1.3%
Sewage And Solid Waste Treatment Facility
0.5
0.5%
Built
8.71
9%
Booths
0.054
0.1%
Amenity
3.12
3.2%
Area
30.96
32%
External services
Service
Provided by
Approval taken
Roads
HUDA/HSVP
No
Water Supply
HUDA/HSVP
No
Electricity
DHBVN
Yes
Sewage Disposal
HUDA/HSVP
No
Storm Water Drainage
HUDA/HSVP
No
Facilities in the service plan
Facility
Estimated cost
Status
Internal Roads And Pavements
₹ 2.39 Cr
As Per Project Report
Water Supply System
₹ 79.67 lakh
As Per Project Report
Storm Water Drainage
₹ 97.38 lakh
As Per Project Report
Electricity Supply System
₹ 1.33 Cr
As Per Project Report
Sewage Treatment & Garbage Disposal
₹ 79.67 lakh
As Per Project Report
Street Lighting
₹ 61.97 lakh
As Per Project Report
Security And Fire Fighting
₹ 26.56 lakh
As Per Project Report
Playgrounds And Parks
₹ 44.26 lakh
As Per Project Report
Rain Water Harvesting
₹ 26.56 lakh
As Per Project Report
Electrical Sub Station
₹ 97.38 lakh
As Per Project Report
Statutory approvals
Approval
Status
Date
Lay Out Plan
Already Been Obtained
5 May 2016
Specifications (as filed)
Flooring Details Of Various Parts Of House
Refer Section Below
Wall Finishing Details
Refer Section Below
Kitchen Details
Refer Section Below
Bathroom Fittings
Refer Section Below
Wood Work Etc
Not Applicable
Doors And Windos Frames
Aluminum Or Upvc Frame Windows With Clear Glass
Glass Work
Not Applicable
Electric Fittings
Is Compliant Modular Switches / Sockets, Switchgear And Distribution Boxes From Reputed Makes And Brand
Conducting And Wiring Details
Is Compliant Copper Wiring In Concealed Conduits. Adequate Provision For Light Points, Fan Points, Receptacles And Power Points In All Rooms
Cupboard Details
Not Applicable
Water Storage
Oht
Lift Details
Elevator Access For Apartments From Stilt Level
Windows/Glazings
Aluminum Or Upvc Frame Windows With Clear Glass
Main Doors
Composite Door With Locks, Handles And Knobs From Reputed Makes And Brands
Internal Doors
Composite Door With Handles And Knobs From Reputed Makes And Brands
Air Conditioning
Not Applicable
Electrical Fittings
Refer Section Above
Cng Pipe Line
Not Applicable
Provision Of Wifi And Broadband Facility
Not Applicable
External Finishing/Colour Scheme
External Grade Anti Fungal / Anti Algal Paint From Reputed Makes And Brands
Internal Finishing
Refer Section Below
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Vatika Express City?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.