LapsedHRERA GurugramInterim Rera

Sovereign Next

by Vatika Ltd. · Sector 82A, Village Shikohpur, Gurugram

RERA registration
280 OF 2017
Registered on
9 Oct 2017
Valid till
31 Mar 2021
Project ID
RERA-GRG-501-2019
Land area
7.5 acres
Estimated cost
₹ 190.18 Cr

RERA registration

Registration certificate280 OF 2017, dated 9 Oct 2017
Registration valid till31 Mar 2021
Project IDRERA-GRG-501-2019
AuthorityHRERA Gurugram (Interim Rera)
Project type (as filed)Ongoing
Project nameSovereign Next
PromoterVatika Limited
Promoter’s registered officeVatika Triangle, 4TH Floor, Sushant Lok, Phase-I, Block-A, M. G. Road, Gurugram-122 002.
CINU74899HR1998PLC054821
Site addressSector 82A, Village Shikohpur
SectorSector 82A
Tehsil / DistrictManesar / Gurugram
Layout plan approved22 Dec 2014
Building plans approved22 Dec 2014
Application submitted27 Jan 2020

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Next hearingNot Required
  1. Registration granted 280 OF 2017
  2. Application submitted online
  3. Registration valid till

Land, licence & cost

Land area of the project7.5 acres
Total licensed area326.031 acres
LicencePart of License No 113 of 2008 dated 01.06.2008,
FAR permissible / proposed175 / 115.468
Estimated project cost₹ 190.18 Cr
Cost of land₹ 8.43 Cr
Cost of construction₹ 110.18 Cr
Infrastructure and other structures₹ 4.82 Cr
EDC, taxes, levies and other costs₹ 66.75 Cr

How the land will be used

UseSq mShare
Land Area To Be Used For Construction Of Apartments4,289.19214.1%
Parks And Playgrounds5,934.49519.6%
Vehicle Parkings1,445.9494.8%
Any Other18,681.73961.6%

External services

ServiceProvided byApproval taken
RoadsHUDA/HSVPNo
Water SupplyHUDA/HSVPNo
ElectricityDHBVNYes
Sewage DisposalHUDA/HSVPNo
Storm Water DrainageHUDA/HSVPNo

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 1.35 CrAs Per Project Report
Water Supply System₹ 43.42 lakhAs Per Project Report
Storm Water Drainage₹ 48.25 lakhAs Per Project Report
Electricity Supply System₹ 77.2 lakhAs Per Project Report
Sewage Treatment & Garbage Disposal₹ 43.42 lakhAs Per Project Report
Street Lighting₹ 28.95 lakhAs Per Project Report
Security And Fire Fighting₹ 9.65 lakhAs Per Project Report
Playgrounds And Parks₹ 28.95 lakhAs Per Project Report
Rain Water Harvesting₹ 19.3 lakhAs Per Project Report
Electrical Sub Station₹ 48.25 lakhAs Per Project Report

Statutory approvals

ApprovalStatusDate
Lay Out PlanAlready Been Obtained22 Dec 2014
Zoning PlanAlready Been Obtained19 Apr 2012
Building PlanAlready Been Obtained22 Dec 2014
Site PlanAlready Been Obtained22 Dec 2014
Floor PlanAlready Been Obtained22 Dec 2014
Apartment PlansAlready Been Obtained22 Dec 2014
Elevation SectionAlready Been Obtained22 Dec 2014
Service EstimateAlready Been Obtained9 Dec 2012

Specifications (as filed)

Flooring Details Of Various Parts Of HouseRefer Section Below
Wall Finishing DetailsRefer Section Below
Kitchen DetailsRefer Section Below
Bathroom FittingsRefer Section Below
Wood Work EtcNot Applicable
Doors And Windos FramesRefer Point 14 Below.
Glass WorkRefer Point 13 Below.
Electric FittingsIs Compliant Modular Switches / Sockets, Distribution Boxes And Circuit Breakers From Standard Makes And Brands. Adequate Provision For Light Points, Fan Points, Receptacles And Power Points In All Rooms
Conducting And Wiring DetailsIs Compliant Copper Wiring In Concealed Conduits.
Cupboard DetailsNot Applicable
Water StorageUnderground & Overhead Tanks
Lift DetailsSpacious Elevators With Pleasing Interiors.
Windows/GlazingsPowder Coated Aluminum Frame Or Upvc Frame Windows With Clear Glass
Main DoorsPolished Hardwood Frame With Polished Veneered Doors.
Internal DoorsPolished / Painted Hardwood Frame With Molded Skin Shutters.
Air ConditioningCentralized Air-Conditioning Through Vrv/Vrf Systems In All Bedrooms And Living Rooms.
Electrical FittingsRefer Point 8 Above.
Cng Pipe LineNot Applicable
Provision Of Wifi And Broadband FacilityNot Applicable
External Finishing/Colour SchemeExternal Grade Anti Fungal / Anti Algal Paint From Reputed Makes And Brands.
Internal FinishingRefer Section Below

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Sovereign Next?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.