Registration validHRERA Gurugram

The Legacy Phase-I

by Silverglades Homes LLP · Village Behrampur, Sector 63A, Gurgaon

RERA registration
GGM/861/593/2024/88
Registered on
16 Aug 2024
Valid till
31 May 2031
Project ID
RERA-GRG-1689-2024
Land area
9.95 acres
Apartments
341 in 2 towers
Completion (as filed)
31 May 2031
Estimated cost
₹ 823.1 Cr

RERA registration

Registration certificateGGM/861/593/2024/88, dated 16 Aug 2024
Registration valid till31 May 2031
Project IDRERA-GRG-1689-2024
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameThe Legacy Phase-I
PromoterSilverglades Homes LLP
Promoter’s registered office506, 5TH Floor Time Square Building, B Block, Sushant Lok Phase 1, Gurgaon -122002
Site addressVillage Behrampur, Sector 63A, Gurgaon
SectorSector 63A
Tehsil / DistrictWazirabad St / Gurugram
Construction start (as filed)1 Sep 2024
Completion (as filed)31 May 2031
Application submitted11 Jul 2024

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Initial scrutinyFirst hearing
Next hearingNot Required
  1. Application submitted online
  2. Application received by HRERA Gurugram
  3. Hearing Approved And Ready For Certificate Issuing Process
    Proceedings

    Ms. Nikita Mittal, Planning Executive and Sh. Ashish Dubey, Chartered Accountant briefed about the facts of the case. Sh. V. Shokeen (AR) and Sh. Harsh Kumar Gupta (AR) are present on behalf of the promoter. Approved as proposed subject to submission of BG/DD of Rs. 25 lakhs each in lieu of submission of fire approval and approved SPE within 4 months along with rectification of other deficiencies. The approval of EC shall be submitted within 2 months as the same is already cleared by SIEAA in Gold rating. 

  1. Registration granted GGM/861/593/2024/88
  2. Certificate uploaded RC Uploaded
  3. Registration valid till

Land, licence & cost

Land area of the project9.95 acres
Total licensed area10.463 acres
Licence215 of 2023
FAR permissible / proposed2.21 / 2.08
Estimated project cost₹ 823.1 Cr
Cost of land₹ 53.84 Cr
Cost of construction₹ 530.68 Cr
Infrastructure and other structures₹ 81.21 Cr
EDC, taxes, levies and other costs₹ 157.38 Cr

How the land will be used

UseSq mShare
Land Area To Be Used For Construction Of Apartments5,410.2417.6%
Construction Of Roads15,329.4949.9%
Vehicle Parkings5,394.4617.5%
Electricity Sub-Station975.293.2%
Club House2,634.518.6%
Any Other1,003.633.3%

Apartments 341 units · 2 towers

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings149.981,614132
Apartment/Shops/Other Buildings220.512,3744
Apartment/Shops/Other Buildings205.432,211132
Apartment/Shops/Other Buildings309.393,3304
Apartment/Shops/Other Buildings261.092,81067
Apartment/Shops/Other Buildings386.834,1642

Areas are as filed with HRERA.

External services

ServiceProvided byApproval taken
RoadsGMDA, ALREADY EXISTING 60M ROAD ABERTING THE SITEYes
Water SupplyGMDAYes
ElectricityDHBVNYes
Sewage DisposalGMDAYes
Storm Water DrainageGMDAYes

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 8.05 CrAs Per Project Report
Water Supply System₹ 2.59 CrAs Per Project Report
Storm Water Drainage₹ 2.3 CrAs Per Project Report
Electricity Supply System₹ 3.74 CrAs Per Project Report
Sewage Treatment & Garbage Disposal₹ 2.88 CrAs Per Project Report
Street Lighting₹ 1.96 CrAs Per Project Report
Security And Fire Fighting₹ 2.3 CrAs Per Project Report
Playgrounds And Parks₹ 1.61 CrAs Per Project Report
Club House/Community Centre₹ 25.7 CrAs Per Project Report
Renewable Energy System₹ 4.6 CrAs Per Project Report
Any Other₹ 1.73 CrAs Per Project Report
Stp₹ 3.74 CrAs Per Project Report
Parking₹ 2.88 CrAs Per Project Report
Underground Water Tank₹ 2.88 CrAs Per Project Report
Rain Water Harvesting₹ 92 lakhAs Per Project Report
Electrical Sub Station₹ 4.6 CrAs Per Project Report

Statutory approvals

ApprovalStatusDate
LicenseAlready Been Obtained23 Oct 2023
Building Plan Approval (Br-III)Already Been Obtained5 Jul 2024
Electrical Load Availability ConnectionAlready Been Obtained3 Jan 2024
HUDA Construction Water NocAlready Been Obtained5 Dec 2023
Drinking Water SupplyAlready Been Obtained4 Dec 2023
Sewage DisposalAlready Been Obtained4 Dec 2023
Storm Water DrainageAlready Been Obtained4 Dec 2023
Noc AravaliAlready Been Obtained6 Jul 2022
Zoning PlanAlready Been Obtained18 Dec 2023
Airport Height ClearanceAlready Been Obtained26 Feb 2024
Forest NocAlready Been Obtained15 Feb 2022
Environment ClearanceApplied For But Yet To Receive18 Dec 2023
Service Plans And EstimatesYet To File For Approval
Fire Scheme ApprovalYet To File For Approval
Mining PermissionYet To File For Approval

Specifications (as filed)

Flooring Details Of Various Parts Of HouseCombination Of Laminated Wooden Flooring , Natural Stone &Tiles;
Wall Finishing DetailsCombination Of Acrylic Emulsion Paint , Pop Punning
Kitchen DetailsAntislip Vitrified Tiles;Acrylic Emulsion Paint, Granite Stone Counter, Single Lever Cp Fittings & Double Bowl SS Sink With Drain Board,Hob And Chimney, Modular Kitchen Cabinetry
Bathroom FittingsVanities With Mirror, Single Lever Cp Fittings With Wash Basin & European; Wc
Wood Work EtcModular Kitchen Cabinetry,
Doors And Windos FramesHardwood Door Frame For Internal Doors
Electric FittingsModular Switches
Conducting And Wiring DetailsUpvc Conduiting With Wiring
Cupboard DetailsModular Kitchen
Water StorageOht At Project Level
Lift Details12-18 Persons Approx. Each Lift Capacity
External GlazingsUpvc Frame / Aluminium Frame With Glass
Windows/GlazingsUpvc Frame / Aluminium Frame With Glass
DoorsWooden Panelled Door/Polished Veneer
Main DoorsWooden Panelled Door/Polished Veneer
Internal DoorsPolished Veneer/ Panelled/ Flush Shutter
Air ConditioningRv/Split Ac System
Electrical FittingsModular Switches
Cng Pipe LineProvision
Provision Of Wifi And Broadband FacilityProvision
External Finishing/Colour SchemeHigh Grade External Paint And Stone
Internal FinishingAcrylic Emulsion Paint On Pop Punning, Acrylic Emulsion Paint

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about The Legacy Phase-I?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.