by SS Group Private Limited · Sector-90, Village Badha & Nawada, Fatehpur
RERA registration
Applied, not granted yet
Applied on
6 Jul 2026
Application status
Return
Project ID
RERA-GRG-2283-2026
Land area
5.046 acres
Apartments
512 in 5 towers
Completion (as filed)
30 Sep 2031
Estimated cost
₹ 786.41 Cr
This project has applied for RERA registration but has not been granted it yet. Under RERA it cannot be advertised, marketed or sold until it is registered.
RERA registration
Registration certificate
Not issued yet: the application is being processed by HRERA Gurugram
Sh. Sumeet, Engineering Officer and Ms. Asha, Chartered Accountant briefed about the facts of the project. Sh. Ashok Jaunapuria (AR), Sh. Manoj Shukla (AR) and Sh. Sunil Shekhawat (AR) are present on behalf of the promoter. The Authority observes that the approval of building plans for the project, as required to be issued by DTCP, Haryana, has not been submitted by the promoter along with the application dated 24.06.2026 & 07.07.2026 filed under Section 4 of the Act, 2016 for amendment of registration of the project. The submission of approved building plans is a prerequisite for the grant of amendment of registration of project. The Authorized Representative of the promoter submits that the application for approval of building plans has already been filed before the concerned department and in-principle approval for the purpose of considering objections/suggestions, has been obtained on 08.06.2026. However, the final approval has not been received till date and is expected to be received shortly. After considering the submissions, the Authority is of the view that in the absence of approved building plans, the application is incomplete and cannot be processed for amendment of registration. Accordingly, the application dated 24.06.2026 & 07.07.2026 is hereby returned being incomplete, with liberty to the promoter to file a fresh application upon obtaining the requisite approvals. Further, the processing fee, which is to be calculated based on FAR as per the approved building plans, stands forfeited since the application was submitted without the requisite basic approval necessary for its processing. The balance fee, if any, shall be adjusted as and when the fresh application is received in the Authority for amendment of registration of the project.
Land, licence & cost
Land area of the project
5.046 acres
Total licensed area
6.417 acres
Licence
265 of 2023 (19-12-2023)
FAR permissible / proposed
3.62 / 3.48
Estimated project cost
₹ 786.41 Cr
Cost of land
₹ 14.01 Cr
Cost of construction
₹ 484.98 Cr
Infrastructure and other structures
₹ 81.8 Cr
EDC, taxes, levies and other costs
₹ 205.62 Cr
How the land will be used
Use
Acres
Share
Land Area To Be Used For Construction Of Apartments
0.739
16.1%
Construction Of Roads
1.745
38%
Parks And Playgrounds
1.8
39.2%
Vehicle Parkings
0.312
6.8%
Apartments 512 units · 5 towers
Type
Carpet area (sq m)
Carpet area (sq ft)
Units
Apartment/Shops/Other Buildings
137.95
1,485
512
Areas are as filed with HRERA.
External services
Service
Provided by
Approval taken
Roads
GMDA
Yes
Water Supply
GMDA
Yes
Electricity
DHVBN
Yes
Sewage Disposal
GMDA
Yes
Storm Water Drainage
GMDA
Yes
Facilities in the service plan
Facility
Estimated cost
Status
Internal Roads And Pavements
₹ 5.06 Cr
As Per Project Report
Water Supply System
₹ 2.89 Cr
As Per Project Report
Storm Water Drainage
₹ 1.44 Cr
As Per Project Report
Electricity Supply System
₹ 7.22 Cr
As Per Project Report
Sewage Treatment & Garbage Disposal
₹ 11.12 Cr
As Per Project Report
Street Lighting
₹ 1.44 Cr
As Per Project Report
Security And Fire Fighting
₹ 72 lakh
As Per Project Report
Playgrounds And Parks
₹ 5.78 Cr
As Per Project Report
Statutory approvals
Approval
Status
Date
I. Building Plan
Already Been Obtained
12 Aug 2024
II. Zoning Plan
Already Been Obtained
5 Jun 2024
III. License From Town & Country Planning Haryana
Already Been Obtained
19 Dec 2023
IV. Phasing Plan Approval
Already Been Obtained
17 Jul 2024
V. Fire Scheme Approval
Already Been Obtained
17 Oct 2024
Specifications (as filed)
Flooring Details Of Various Parts Of House
Vitrified Tile
Wall Finishing Details
Oil Bound Distemper
Kitchen Details
Stone Counter Top With Single Lever Cp Fitings And Sink
Bathroom Fittings
Stone Counter Top With Single Lever Cp Fittings, Wash Basin, Wall Hung Wc
Each Tower Has Been Provided 03 Nos Passanger Lifts And 1 Service Lift
External Glazings
Upvc Frames With Sliding Glass Shutters
Windows/Glazings
Upvc Frames With Sliding Glass Shutters
Doors
Marandi Wood Door Frame With Enamel Paint Shutter
Main Doors
Marandi Wood Door Frame With Enamel Paint Shutter
Internal Doors
Marandi Wood Door Frame With Enamel Paint Shutter
Air Conditioning
Split Air-Conditioners In Living Room And Bed Rooms
Electrical Fittings
Isi Marked Fittings
Cng Pipe Line
Not Applicable
Provision Of Wifi And Broadband Facility
Not Applicable
External Finishing/Colour Scheme
Textured Paint
Internal Finishing
Oil Bound Distemper
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about SS Camasa?
This project has applied for RERA but is not registered yet. An advisor can tell you what that means for booking, and suggest registered alternatives nearby. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.