Signature Global City 92
by Signature Infrbuild Pvt. Ltd. · Village Mevka, Wazirpur, Sector-92, Gurugram
- RERA registration
- GGM/470/202/2021/38
- Registered on
- 27 Jul 2021
- Valid till
- 27 Apr 2026
- Project ID
- RERA-GRG-860-2021
- Land area
- 10.3 acres
- Plots
- 191
- Completion (as filed)
- 30 Apr 2023
- Estimated cost
- ₹ 107.54 Cr
RERA registration
| Registration certificate | GGM/470/202/2021/38, dated 27 Jul 2021 |
|---|---|
| Registration valid till | 27 Apr 2026 |
| Project ID | RERA-GRG-860-2021 |
| Authority | HRERA Gurugram |
| Project type (as filed) | New |
| Project name | Signature Global City 92 |
| Promoter | Signature Infrbuild Pvt. Ltd. |
| Promoter’s registered office | 1310, 13TH Floor , Dr.gopal Das Bhawan, 28 Barakhambha Road, New Delhi-110001 |
| CIN | U70100DL2013PTC247676 |
| Site address | Village Mevka, Wazirpur, Sector-92, Gurugram |
| Sector | Sector 92 |
| Tehsil / District | Harsaru St / Gurugram |
| Construction start (as filed) | 1 May 2021 |
| Completion (as filed) | 30 Apr 2023 |
| Application submitted | 13 May 2021 |
Authority, hearings & orders
- Application submitted online
- Application received by HRERA Gurugram
- Notice sent to the promoter By Hand
-
Hearing
Examination By Authority
Proceedings
Sh. Gajender Bhatti, Planning Executive briefed the facts about the project.Sh. Anurag Srivastava is present on behalf of the promoter.The promoter M/s Signature Infrabuild Pvt Ltd applied for registration certificate of real estate project namely “Signature Global City – 92” for the area admeasuring 10.30 Acres located in villages Mewka, Wazirpur, Sector-92, Gurugram, under section 4 of the Real Estate (Regulation and Development) Act, 2016 vide central receipt no. 10412/19836 dated 11.06.2021 and RPIN-339. The Temp I.D. of REP-I (Part A-H) is RERA-GRG-Proj-860-2021, the application by the promoter was scrutinized and deficiency notice indicating major deficiencies and observations were conveyed vide notice no. HARERA/GGM/RPIN/339 dated 18.06.2021. The Department of Town and Country Planning, Haryana has granted the license to develop an affordable plotted colony under DDJAY scheme of 2016 for the area admeasuring 10.30 acres vide license no. 12 of 2021 dated 12.03.2021 to M/s S.A. Township Pvt. Ltd., M/s Ramprastha Estate Pvt. Ltd. and M/s Signature Infrabuild Pvt. Ltd, in collaboration with M/s Signature Infrabuild Pvt. Ltd. acting as promoter and collaborator in the case vide collaboration agreement no. G0C2019J3696 dated 03.10.2019 (irrevocable and registered). The project comprises of 191 plots out of which 100 plots are frozen and 91 plots are unfrozen.The approved copy of service plans and estimates needs to be provided. PERT chart indicating the progress of the project is not submitted. CA certificate for the equity infused by the promoter needs to be provided. The promoter has mortgaged the land and receivables from the project and in lieu of the same promoter has to submit the loan sanction letter, disbursement, and repayment schedule. The promoter needs to submit an affidavit keeping in view of section 4(2)(l)(D) mentioning all the three accounts. No reply has been received. On the request of the AR the matter is adjourned to 13.07.2021.
-
Hearing
Objection
Proceedings
Ms. Prachi Singh, Planning Executive briefed the facts about the project. Sh. Anurag Srivastava is present on behalf of the promoter. The promoter M/s Signature Infrabuild Pvt Ltd applied for registration certificate of real estate project namely “Signature Global City – 92” for the area admeasuring 10.30 Acres located in village Mewka, Wazirpur, Sector-92, Gurugram., under section 4 of the Real Estate (Regulation and Development) Act, 2016 vide central receipt no. 10412/19836 dated 11.06.2021 and RPIN-339. The Temp I.D. of REP-I (Part A-H) is RERA-GRG-Proj-860-2021, the application by the promoter was scrutinized and deficiency notice indicating major and minor deficiencies was conveyed vide notice no. HARERA/GGM/RPIN/339 dated 18.06.2021. The Department of Town and Country Planning, Haryana has granted the license to develop an affordable plotted colony under DDJAY scheme of 2016 for the area admeasuring 10.30 acres vide license no. 12 of 2021 dated 12.03.2021 to M/s S.A. Township Pvt. Ltd., M/s Ramprastha Estate Pvt. Ltd. and M/s Signature Infrabuild Pvt. Ltd, in collaboration with M/s Signature Infrabuild Pvt. Ltd. acting as promoter and collaborator in the case vide collaboration agreement no. G0C2019J3696 dated 03.10.2019. The project comprises of 191 plots out of which 100 plots are frozen and 91 plots are unfrozen. Some of the deficiencies in the project are the approved copy of service plans and estimates needs to be provided, PERT chart indicating the progress of the project is not submitted, CA certificate for the equity infused by the promoter needs to be provided, the promoter has mortgaged the land and receivables form the project and lieu of the same promoter has to submit the loan sanction letter, disbursement and repayment schedule. The promoter needs to submit an affidavit keeping in view of section 4(2)(l)(D) mentioning all the three accounts. As on date the promoter has submitted a reply dated 01.07.2021 for the first deficiency notice, most of the deficiencies have been rectified by the promoter except for the deficiencies mentioned below:- 1. Online corrections in REP-I (Part A-H) needs to be done. 2. Corrections in detailed project information needs to be done. 3. Copy of approved service plans and estimates/sanction letter needs to be provided. 4. PERT Chart needs to be submitted. 5. Cost of land needs to be clarified as per the area of the registration i.e 10.3 acre. 6. Cost of External Development charges needs to be mentioned as per Letter of Intent. 7. Repayment schedule of the loan needs to be provided. 8. Loan sanction letter needs to be submitted. 9. Escrow agreement executed with the bank needs to be provided. 10. An undertaking from the company that 10% of the total receipt in Separate RERA compliant account has been credited to the Haryana Government treasury against the EDC dues until it is fully paid. The promoter is directed to remove the above mentioned deficiencies by the next hearing and fill online DPI and the matter to come up on 27.07.2021.Samir Kumar (Member)Vijay Kumar Goyal (Member)Dr. K.K. Khandelwal (Chairman)
-
Hearing
Approved And Ready For Certificate Issuing Process
Proceedings
Proceedings dated: 27.07.2021 Mr. Gajender Bhatti, Associate Planning Executive briefed the facts about the project. The promoter M/s Signature Infrabuild Pvt Ltd applied for registration certificate of real estate project namely “Signature Global City – 92” for the area admeasuring 10.30 Acres located in village Mewka, Wazirpur, Sector-92, Gurugram., under section 4 of the Real Estate (Regulation and Development) Act, 2016 vide central receipt no. 10412/19836 dated 11.06.2021 and RPIN-339. The Temp I.D. of REP-I (Part A-H) is RERA-GRG-Proj-860-2021, the application by the promoter was scrutinized and deficiency notice indicating major and minor deficiencies was conveyed vide notice no. HARERA/GGM/RPIN/339 dated 18.06.2021. The Department of Town and Country Planning, Haryana has granted the license to develop an affordable plotted colony under DDJAY scheme of 2016 for the area admeasuring 10.30 acres vide license no. 12 of 2021 dated 12.03.2021 to M/s S.A. Township Pvt. Ltd., M/s Ramprastha Estate Pvt. Ltd. and M/s Signature Infrabuild Pvt. Ltd, in collaboration with M/s Signature Infrabuild Pvt. Ltd. acting as promoter and collaborator in the case vide collaboration agreement no. G0C2019J3696 dated 03.10.2019. The project comprises of 191 plots out of which 100 plots are frozen and 91 plots are unfrozen. Some of the major deficiencies in the project are the approved copy of service plans and estimates needs to be provided, PERT chart indicating the progress of the project is not submitted, CA certificate for the equity infused by the promoter needs to be provided, the promoter has mortgaged the land and receivables form the project and lieu of the same promoter has to submit the loan sanction letter, disbursement and repayment schedule. The promoter needs to submit an affidavit keeping in view of section 4(2)(l)(D) mentioning all the three accounts. As on date the promoter has submitted a reply dated 01.07.2021 for the first deficiency notice. In the last hearing dated 13.07.2021 the promoter was directed to remove the remaining deficiencies, and the matter was fixed for 27.07.2021. The promoter has submitted a reply dated 22.07.2021 the same was scrutinized and deficiency which are still pending on behalf of the promoter are mentioned as under:- 1. Copy of approved service plans and estimates/sanction letter needs to be provided. The Authority decided to grant conditional registration certificate for the project with the following conditions mentioned above and directed the promoter to comply within three months from issuance of the registration certificate. The promoter is advised to submit detailed project information duly binded and also fill up online DPI information at hrera.in/app1/sign_up within 7 days.Samir Kumar (Member)Vijay Kumar Goyal (Member)Dr. K.K. Khandelwal (Chairman)
- Registration granted GGM/470/202/2021/38
- Registration valid till
Land, licence & cost
| Land area of the project | 10.3 acres |
|---|---|
| Total licensed area | 10.3 acres |
| Licence | 12 of 2021 dated 12.03.2021 Endst. No. LC-4248/Asstt.(MS)/2021/6671 Dated 15/03/2021 |
| FAR permissible / proposed | 1 / 1 |
| Estimated project cost | ₹ 107.54 Cr |
| Cost of land | ₹ 54.41 Cr |
| Infrastructure and other structures | ₹ 9.13 Cr |
| EDC, taxes, levies and other costs | ₹ 44.01 Cr |
How the land will be used
| Use | Acres | Share |
|---|---|---|
| Plots To Be Sold | 4.964 | 48.2% |
| Construction Of Roads | 2.85 | 27.6% |
| Green Belts | 0.782 | 7.6% |
| Electricity Sub-Station | 0.12 | 1.2% |
| Sewage And Solid Waste Treatment Facility | 0.15 | 1.5% |
| Area To Be Left For Transferring To The Government For Community Services | 1.03 | 10% |
| Commercial Area | 0.412 | 4% |
Plots 191 plots
| Plot size (sq m) | Sq yd | Sq ft | Plots |
|---|---|---|---|
| 70.17 | 84 | 755 | 1 |
| 77.97 | 93 | 839 | 1 |
| 77.97 | 93 | 839 | 1 |
| 77.97 | 93 | 839 | 1 |
| 77.97 | 93 | 839 | 1 |
| 77.97 | 93 | 839 | 1 |
| 77.97 | 93 | 839 | 1 |
| 79.50 | 95 | 856 | 1 |
| 85.90 | 103 | 925 | 1 |
| 85.90 | 103 | 925 | 1 |
| 95.59 | 114 | 1,029 | 1 |
| 95.79 | 115 | 1,031 | 1 |
| 99.20 | 119 | 1,068 | 26 |
| 99.20 | 119 | 1,068 | 41 |
| 99.20 | 119 | 1,068 | 37 |
| 103.38 | 124 | 1,113 | 1 |
| 103.38 | 124 | 1,113 | 1 |
| 103.38 | 124 | 1,113 | 1 |
| 113.97 | 136 | 1,227 | 1 |
| 117.25 | 140 | 1,262 | 15 |
| 126.88 | 152 | 1,366 | 1 |
| 148.04 | 177 | 1,593 | 1 |
| 177.25 | 212 | 1,908 | 54 |
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | No | WATER SUPPLY |
| GMDA Memo No. 198 Dated 08/04/2021 | Yes | ELECTRICITY |
| DHBVN CH.141/Drg.-Plc Dated 03/04/2021 | Yes | SEWAGE DISPOSAL |
| GMDA/Sew/2021/395 Dated 25/03/2021 | Yes | STORM WATER DRAINAGE |
| No | STP | GMDA/SEW/2021/397 DATED 25/03/2021 |
| Yes | 4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report: | Sr. No. |
| Name of the facility | Estimated cost (In Lakhs)(Within the project area only) | Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C) |
| 1 | INTERNAL ROADS AND PAVEMENTS | 257.71 |
| Submitted To HUDA | 2 | WATER SUPPLY SYSTEM |
| 188.81 | SUBMITTED TO HUDA | 3 |
| Storm Water Drainage | 58.26 | SUBMITTED TO HUDA |
| 4 | ELECTRICITY SUPPLY SYSTEM | 0 |
| Yet To Be Prepared | 5 | SEWAGE TREATMENT & GARBAGE DISPOSAL |
| 106.59 | SUBMITTED TO HUDA | 6 |
| Street Lighting | 15.81 | SUBMITTED TO HUDA |
| 7 | SECURITY AND FIRE FIGHTING | 0 |
| Yet To Be Prepared | 8 | PLAYGROUNDS AND PARKS |
| 0 | YET TO BE PREPARED | 9 |
| Club House/Community Centre | 0 | YET TO BE PREPARED |
| 10 | SHOPPING AREA | 0 |
| Yet To Be Prepared | 11 | RENEWABLE ENERGY SYSTEM |
| 0 | YET TO BE PREPARED | 12 |
| School | 0 | YET TO BE PREPARED |
| 13 | HOSPITAL/DISPENSARY | 0 |
| Yet To Be Prepared | 14 | ANY OTHER |
| 0 | YET TO BE PREPARED | 15 |
| Parking And Horticulture | 21.56 | SUBMITTED TO HUDA |
| 16 | MAINTENANCE OF SERVICES | 263.93 |
| Submitted To HUDA | 5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed. | NA |
| (date) | 6. Date of approval of Building Plans | NA |
| (date) | 7. New projects: | i) Likely date of starting the construction work |
| 01-05-2021 | ii) Likely date of completing the project | 30-04-2023 |
| iii) Sizes of the plots to be offered in the project | Sr. No | Plot Area(In Square Meter) |
| Number of plots in the project | 1 | 117.248 |
| 15 | 2 | 177.248 |
| 54 | 3 | 99.2 |
| 26 | 4 | 99.2 |
| 41 | 5 | 99.2 |
| 37 | 6 | 77.965 |
| 1 | 7 | 77.965 |
| 1 | 8 | 77.965 |
| 1 | 9 | 77.965 |
| 1 | 10 | 77.965 |
| 1 | 11 | 77.965 |
| 1 | 12 | 70.172 |
| 1 | 13 | 79.497 |
| 1 | 14 | 95.786 |
| 1 | 15 | 95.586 |
| 1 | 16 | 148.036 |
| 1 | 17 | 126.882 |
| 1 | 18 | 103.379 |
| 1 | 19 | 103.379 |
| 1 | 20 | 85.901 |
| 1 | 21 | 85.901 |
| 1 | 22 | 113.972 |
| 1 | 23 | 103.379 |
| 1 | Total | 191 |
| iv. Type of apartments to be constructed in the project: | Type | Carpet area(In Square Meter) |
| Number of apartments | Number of towers | Apartment/Shops/Other Buildings |
| 0 | 0 | 0 |
| (vi) Quarterly schedule of development of whole/remaining part of the project: | (c) Apartments/Shops/Other Buildings | Expenditure incurred till the date of application (In Lakhs) |
| Particulars | Expenditure | Apartments |
| 0 | Shops | 0 |
| Plots | 0 | External Development Charges |
| 300.25 | Land Cost Expenditure | 3459.44 |
| Others Cost | 36 | Expenditure to be made in each quarter (In Lakhs) |
| Particulars | Year-2021 | Jan-Mar |
| Apr-June | July-Sep | Oct-Dec |
| Apartments | 0 | 0 |
| 0 | Shops | 0 |
| 0 | 0 | Plots |
| 0 | 0 | 0 |
| Others Cost | 295 | 295 |
| 295 | Land Cost Expenditure | 198.15 |
| 198.15 | 198.15 | Internal Development Works |
| 83.42 | 215.03 | 240.98 |
| External Development Charges | 150.10 | Particulars |
| Year-2022 | Jan-Mar | Apr-June |
| July-Sep | Oct-Dec | Apartments |
| 0 | 0 | 0 |
| 0 | Shops | 0 |
| 0 | 0 | 0 |
| Plots | 0 | 0 |
| 0 | 0 | Land Cost Expenditure |
| 198.15 | 198.15 | 198.15 |
| 198.15 | Internal Development Woks | 263.93 |
| Others Cost | 340 | 295 |
| 286 | 205 | External Development Charges |
| 150.10 | 150.10 | Internal Development Works |
| 109.31 | 200 | 150 |
| Particulars | Year-2023 | Jan-Mar |
| Apr-June | July-Sep | Oct-Dec |
| Apartments | 0 | 0 |
| 0 | 0 | Shops |
| 0 | 0 | 0 |
| 0 | Plots | 0 |
| 0 | 0 | 0 |
| Land Cost Expenditure | 198.15 | 198.15 |
| 198.15 | 0 | Others Cost |
| 212 | 165 | 137.75 |
| 0 | External Development Charges | 150.10 |
| 150.10 | 0 | Particulars |
| Year-2024 | Jan-Mar | Apr-June |
| July-Sep | Oct-Dec | Apartments |
| 0 | Shops | 0 |
| Plots | 0 | External Development Charges |
| 150.10 | Other cost | 9.00 |
| (d) Infrastructure | Expenditure incurred till the date of application (In Lakhs) | Particulars |
| Expenditure | Roads & Pavements | 0 |
| Water Supply System | 0 | Sewerage treatment & garbage disposal |
| 0 | Electricity Supply System | 0 |
| Storm Water Drainage | 0 | Parks and Playgrounds |
| 0 | Clubhouse/community centres | 0 |
| Shopping area | 0 | Other |
| 0 | Expenditure to be made in each quarter (In Lakhs) | Particulars |
| Year-2021 | Jan-Mar | Apr-June |
| July-Sep | Oct-Dec | Roads & Pavements |
| 31.21 | 81.54 | 95.63 |
| Water Supply System | 22.86 | 59.74 |
| 70.07 | Sewerage treatment & garbage disposal | 12.91 |
| 33.73 | 39.55 | Electricity Supply System |
| 0 | 0 | 0 |
| Storm Water Drainage | 10.01 | 24.38 |
| 21.77 | Parks and Playgrounds | 0 |
| 0 | 0 | Clubhouse/community centres |
| 0 | 0 | 0 |
| Shopping area | 0 | 0 |
| 0 | Other | 0 |
| 0 | 0 | Street Light |
| 2.72 | 6.62 | 5.91 |
| Parking and Horticulture | 3.71 | 9.02 |
| 8.05 | Particulars | Year-2022 |
| Jan-Mar | Apr-June | July-Sep |
| Oct-Dec | Roads & Pavements | 49.33 |
| Water Supply System | 36.14 | Sewerage treatment & garbage disposal |
| 20.40 | Electricity Supply System | 0 |
| Storm Water Drainage | 2.10 | Parks and Playgrounds |
| 0 | Clubhouse/community centres | 0 |
| Shopping area | 0 | Other |
| 0 | Parking and Horticulture | 0.78 |
| Street Light | 0.56 | It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented. |
| Signature of the Applicant / Authorised Representative | Stamp _____________ | Date _____________ |
| Form Rep-I | Part - D | Accounts related information: |
| 1. Annex copy of the balance sheet of last 3 years | Yes | 2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D. |
| Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form. | No | 3. Bank account to which the deposits received from apartment buyers will be credited |
| Bank and Branch address | HDFC BANK LIMITED 209-214 KAILASH BUILDING 26 KG MARG NEW DELHI-110001 | Bank Account number |
| 57500000653654 | IFSC code | HDFC0000003 |
| MICR code | 110240001 | Branch code |
| 000003 | 4. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority) | Lalit Kumar Aggarwal and Pradeep Kumar Aggarwal House No. 34, Road No.61, West Punjabi Bagh Delhi 110026 |
| 5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details) | Attached as Annexure | I hereby declare that the above information and particulars are based on record and are true to the |
| best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | FORM REP-I | Part - E |
| Details of the statutory approvals: | 1. Annex copies of the following in Folder E: | i. Lay out Plan |
| Yes | ii. Demarcation Plan | Yes |
| iii. Zoning Plan | Yes | iv. Building Plan |
| No | Site Plan | No |
| Floor Plan | No | Apartment Plans |
| No | Elevation Section | No |
| Detail of Permissible FAR | No | Detail of covered area achieved FAR |
| No | 2. Annex copies of the following in Folder E: | I. ROADS AND PAVEMENT PLAN |
| Yes | II. ELECTRICITY SUPPLY PLAN | No |
| III. Water Supply Plan | Yes | IV. SEWERAGE AND GARBAGE DISPOSAL PLAN |
| Yes | V. STROM WATER DRAINAGE | Yes |
| Vi. 10% Land To Be Transferred To The Govt. For Community Facility | Yes | VII. STREET LIGHTING PLAN |
| No | VIII. PARKING PLAN | No |
| 3. Statutory Approvals Status | Statutory Approvals | Statutory Approvals Status |
| Date | I. LICENSE APPROVAL 12 OF 2021 | ALREADY BEEN OBTAINED |
| 12-03-2021 | II. ZONING PLAN APPROVAL DRG. NO. DTCP7738 | ALREADY BEEN OBTAINED |
| 20-04-2021 | III. WATER SUPPLY MEMO NO. 198 | ALREADY BEEN OBTAINED |
| 08-04-2021 | IV. SEWAGE DISPOSAL GMDA/SEW/2021/395 | ALREADY BEEN OBTAINED |
| 25-03-2021 | V. STP TREATED WATER GMDA/SEW/2021/397 | ALREADY BEEN OBTAINED |
| 25-03-2021 | VI. ELECTRICAL LOAD AVAILABILITY CH.141/DRG.-PLC | ALREADY BEEN OBTAINED |
| 03-04-2021 | VII. FOREST NOC JFV-QFK-Y5YP | & JT8-DAD-BE2T |
| Already Been Obtained | 13-11-2020 | VIII. LAYOUT PLAN DTCP- |
| Already Been Obtained | 12-03-2021 | It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees. |
| Signature _____________ | Seal _____________ | Date _____________ |
| Form Rep-I | Part - F | 1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers. |
| Yes | 2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules) | (Annex a copy in Folder F) |
| Yes | 3. Gist of the important provisions of the Draft Agreement | (Annex a copy in Folder F) |
| Yes | I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. |
| Signature of the Applicant / Authorised Representative | Stamp _____________ | Date _____________ |
| Form Rep-I | Part - G | Projects launched by the promoter in last five years: (No Projects) |
| I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | FORM REP-I | Part - H |
| Specification Of Construction | Specification of apartments and other buildings including the following: | 1 |
| Flooring Details Of Various Parts Of House | NA | 2 |
| Wall Finishing Details | NA | 3 |
| Kitchen Details | NA | 4 |
| Bathroom Fittings | NA | 5 |
| Wood Work Etc | NA | 6 |
| Doors And Windos Frames | NA | 7 |
| Glass Work | NA | 8 |
| Electric Fittings | NA | 9 |
| Conducting And Wiring Details | NA | 10 |
| Cupboard Details | NA | 11 |
| Water Storage | NA | 12 |
| Lift Details | NA | 13 |
| External Glazings | NA | 13.1 |
| Windows/Glazings | NA | 14 |
| Doors | NA | 14.1 |
| Main Doors | NA | 14.2 |
| Internal Doors | NA | 15 |
| Air Conditioning | NA | 16 |
| Electrical Fittings | NA | 17 |
| Cng Pipe Line | NA | 18 |
| Provision Of Wifi And Broadband Facility | NA | 19 |
| External Finishing/Colour Scheme | NA | 20 |
| Internal Finishing | NA | SPECIFICATION UNIT WISE |
| 1 . Living/Dining/Foyer/Family Lounge | 1 . 1 | FLOOR |
| Na | 1 . 2 | WALLS |
| Na | 1 . 3 | CEILING |
| Na | 2 . MASTER BEDROOM/DRESSROOM | 2 . 1 |
| Floor | NA | 2 . 2 |
| Walls | NA | 2 . 3 |
| Ceiling | NA | 2 . 4 |
| Modular Wardrobes | NA | 3 . MASTER TOILET |
| 3 . 1 | FLOOR | NA |
| 3 . 2 | WALLS | NA |
| 3 . 3 | CEILING | NA |
| 3 . 4 | COUNTERS | NA |
| 3 . 5 | SANITARY WARE/CP FITTINGS | NA |
| 3 . 6 | FITTING/FIXTURES | NA |
| 4 . Bed Rooms | 4 . 1 | FLOOR |
| Na | 4 . 2 | WALLS |
| Na | 4 . 3 | CEILING |
| Na | 4 . 4 | WARDROBES |
| Na | 5 . TOILET | 5 . 1 |
| Floor | NA | 5 . 2 |
| Walls | NA | 5 . 3 |
| Ceiling | NA | 5 . 4 |
| Counters | NA | 5 . 5 |
| Sanitary Ware/Cp Fittings | NA | 5 . 6 |
| Fixtures | NA | 6 . KITCHEN |
| 6 . 1 | FLOOR | NA |
| 6 . 2 | WALLS | NA |
| 6 . 3 | CEILING | NA |
| 6 . 4 | COUNTERS | NA |
| 6 . 5 | FIXTURES | NA |
| 6 . 6 | KITCHEN APPLIANCES | NA |
| 7 . Utility Rooms/Utility Balcony/Toilet | 7 . 1 | FLOOR |
| Na | 7 . 2 | WALLS & CEILING |
| Na | 7 . 3 | TOILET |
| Na | 7 . 4 | BALCONY |
| Na | 8 . SIT-OUTS | 8 . 1 |
| Floor | NA | 8 . 2 |
| Walls & Ceiling | NA | 8 . 3 |
| Railings | NA | 8 . 4 |
| Fixtures | NA | I hereby declare that the above information and particulars are based on record and are true to the |
| best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | List of Uploaded Documents | Sr. No. |
| Document Description | Date of Document Upload | View Document |
| 1 | DEMARCATION PLAN | 10-05-2021 |
| View Document | 2 | SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN |
| 10-05-2021 | View Document | 3 |
| Copy Of License Along With Schedule Of Land | 10-05-2021 | View Document |
| 4 | DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD | 10-05-2021 |
| View Document | 5 | IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN |
| 10-05-2021 | View Document | 6 |
| Zoning Plan | 10-05-2021 | View Document |
| 7 | IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN | 10-05-2021 |
| View Document | 8 | NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT |
| 10-05-2021 | View Document | 9 |
| Strom Water Drainage | 11-05-2021 | View Document |
| 10 | WATER SUPPLY PLAN | 11-05-2021 |
| View Document | 11 | SEWERAGE AND GARBAGE DISPOSAL PLAN |
| 11-05-2021 | View Document | 12 |
| Water Noc | 11-05-2021 | View Document |
| 13 | SEWERAGE NOC | 11-05-2021 |
| View Document | 14 | STP NOC |
| 11-05-2021 | View Document | 15 |
| Power Noc | 11-05-2021 | View Document |
| 16 | IRRIGATION PLAN | 11-05-2021 |
| View Document | 17 | FOREST NOC MEVKA |
| 11-05-2021 | View Document | 18 |
| Forest Noc Wazirpur | 11-05-2021 | View Document |
| 19 | BBA | 13-05-2021 |
| View Document | 20 | BR RERA ACCOUNT |
| 11-05-2021 | View Document | 21 |
| Declaration Supported By Affidavit Duly Signed By The Promoter To Be Enclosed. | 12-05-2021 | View Document |
| 22 | ALLOTMENT LETTER | 13-05-2021 |
| View Document | 23 | APPLICATION FORM |
| 13-05-2021 | View Document | I hereby declare that the above information and particulars are based on record and are true to the |
| best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | Documents Uploaded After Registration | Sr. No. |
| Document Description | Date of Document Upload | View Document |
| 1 | Extension No. 13 of 2023 dated 19.06.2023 | 05-07-2023 |
| View Document | 2 | PROJECT CONTINUATION- RC/REP/HARERA/GGM/38 OF 2021/7(3)/54/2024/13 DATED 08.08.2024 |
| 23-08-2024 | View Document | 3 |
| PROJECT CONTINUATION- RC/REP/HARERA/GGM/38 of 2021/7(3)/54/2024/13 DATED 13.08.2025 | 18-08-2025 | View Document |
| 4 | Completion certificate uploaded | 04-08-2026 |
| View Document | I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. |
| Signature of the Applicant / Authorised Representative | Stamp _____________ | Date _____________ |
Facilities in the service plan
| Facility | Estimated cost | Status |
|---|---|---|
| Internal Roads And Pavements | ₹ 2.58 Cr | Submitted To HUDA |
| Water Supply System | ₹ 1.89 Cr | Submitted To HUDA |
| Storm Water Drainage | ₹ 58.26 lakh | Submitted To HUDA |
| Sewage Treatment & Garbage Disposal | ₹ 1.07 Cr | Submitted To HUDA |
| Street Lighting | ₹ 15.81 lakh | Submitted To HUDA |
| Parking And Horticulture | ₹ 21.56 lakh | Submitted To HUDA |
| Maintenance Of Services | ₹ 2.64 Cr | Submitted To HUDA |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| License Approval 12 Of 2021 | Already Been Obtained | 12 Mar 2021 |
| Zoning Plan Approval Drg. No. DTCP7738 | Already Been Obtained | 20 Apr 2021 |
| Water Supply Memo No. 198 | Already Been Obtained | 8 Apr 2021 |
| Sewage Disposal GMDA/Sew/2021/395 | Already Been Obtained | 25 Mar 2021 |
| Stp Treated Water GMDA/Sew/2021/397 | Already Been Obtained | 25 Mar 2021 |
| Electrical Load Availability CH.141/Drg.-Plc | Already Been Obtained | 3 Apr 2021 |
| Forest Noc Jfv-Qfk-Y5YP | & JT8-Dad-BE2T |
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.