Registration validHRERA Gurugram

Signature Global City 92-(1)

by Signature Infrbuild Pvt. Ltd. · Village Mevka, Wazirpur, Sector-92, Gurugram

RERA registration
GGM/471/203/2021/39
Registered on
27 Jul 2021
Valid till
28 Dec 2026
Project ID
RERA-GRG-879-2021
Land area
7.806 acres
Apartments
364 in 54 towers
Completion (as filed)
31 Dec 2023
Estimated cost
₹ 187.82 Cr

RERA registration

Registration certificateGGM/471/203/2021/39, dated 27 Jul 2021
Registration valid till28 Dec 2026
Project IDRERA-GRG-879-2021
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameSignature Global City 92-(1)
PromoterSignature Infrbuild Pvt. Ltd.
Promoter’s registered office1310, 13TH Floor , Dr.gopal Das Bhawan, 28 Barakhambha Road, New Delhi-110001
CINU70100DL2013PTC247676
Site addressVillage Mevka, Wazirpur, Sector-92, Gurugram
SectorSector 92
Tehsil / DistrictHarsaru St / Gurugram
Layout plan approved12 Mar 2021
Building plans approved15 Jun 2021
Construction start (as filed)1 Aug 2021
Completion (as filed)31 Dec 2023
Application submitted18 Jun 2021

Authority, hearings & orders

Current statusExtension Certificate Uploaded
Initial scrutiny1st deficiency notice sent on 30.06.2021
Next hearingNot Required
  1. Application submitted online
  2. Application received by HRERA Gurugram
  3. Hearing Examination By Authority View order
    Proceedings

    Sh. Anurag Srivastav authorised representative of the promoter was present on behalf of the promoter. Ms. Prachi Singh Planning executive briefed about the facts of the project.  An application regarding registration of residential floors project namely “Signature Global City 92” situated at Village Mevka, Wazirpur, Sector-92, Gurugram being developed by M/s Signature Infrabuild Private Limited. was submitted on 25.06.2021 under section 4 of Real Estate (Regulation and Development), Act 2016. This application for registration is a part of the affordable residential plotted colony under DDJAY which falls under license no. 12 of 2021 for area admeasuring 10.30 acres dated 12.03.2021 valid up to 11.03.2026 being issued in favour of M/s S.A. Township Pvt. Ltd., M/s Ramprastha Estate Pvt. Ltd. and Signature Infrabuild Pvt. Ltd. in collaboration M/s Signature Infrabuild Pvt. Ltd. The project comprises of 191 plots out of which 100 plots are frozen and 91 plots are unfrozen.   The application submitted by the promoter for the said project contains 91 unfrozen plots on which total of 364 units and 134 commercial units are to be constructed. On scrutiny of the application, some of the major deficiencies/observations were observed which were conveyed to the promoter vide notice no. HARERA/GGM/RPIN/345 dated 30.06.2021. The promoter has requested for 10 days’ time to remove the deficiencies and submit the reply. The matter is adjourned to 27.07.2021.

  1. Hearing Approved And Ready For Certificate Issuing Process View order
    Proceedings

    An application regarding registration of residential floors project namely “Signature Global City 92” situated at Village Mevka, Wazirpur, Sector-92, Gurugram being developed by M/s Signature Infrabuild Private Limited. was submitted on 25.06.2021 under section 4 of Real Estate (Regulation and Development), Act 2016. This application for registration is a part of the affordable residential plotted colony under DDJAY which falls under license no. 12 of 2021 for area admeasuring 10.30 acres dated 12.03.2021 valid up to 11.03.2026 being issued in favour of M/s S.A. Township Pvt. Ltd., M/s Ramprastha Estate Pvt. Ltd. and Signature Infrabuild Pvt. Ltd. in collaboration M/s Signature Infrabuild Pvt. Ltd. The project comprises of 191 plots out of which 100 plots are frozen and 91 plots are unfrozen. The application submitted by the promoter for the said project contains 91 unfrozen plots on which total of 364 units and 134 commercial units are to be constructed. On scrutiny of the application, some of the major deficiencies/observations were observed which were conveyed to the promoter vide notice no. HARERA/GGM/RPIN/345 dated 30.06.2021. The promoter has submitted the reply dated 12.07.2021 and 26.07.2021 for the deficiencies after scrutiny of the reply following deficiencies are still pending: - 1.      Copy of approved fire scheme approval/sanction letter for commercial area need to be provided. 2.      Copy of building plan (BR-III) of commercial area i.e., 0.412 acres needs to be provided. 3.      Copy of approved environmental clearance needs to be provided. 4.      Copy of approved service plans and estimates/sanction letter needs to be provided. The Authority decided to grant conditional registration certificate for the project with the following conditions mentioned above and directed the promoter to comply within three months from issuance of the registration certificate. The promoter is advised to submit detailed project information duly binded and also fill up online DPI information at hrera.in/app1/sign_up within 7 days.

  2. Registration granted GGM/471/203/2021/39
  3. Registration valid till

Land, licence & cost

Land area of the project7.806 acres
Total licensed area10.3 acres
Licence12 of 2021 dated 12/03/2021
FAR permissible / proposed2.64 / 2.41
Estimated project cost₹ 187.82 Cr
Cost of land₹ 61.31 Cr
Cost of construction₹ 80 Cr
Infrastructure and other structures₹ 9.13 Cr
EDC, taxes, levies and other costs₹ 37.38 Cr

How the land will be used

UseAcresShare
Land Area To Be Used For Construction Of Apartments2.4731.6%
Construction Of Roads2.84236.4%
Green Belts0.78210%
Electricity Sub-Station0.121.5%
Sewage And Solid Waste Treatment Facility0.151.9%
Area To Be Left For Transferring To The Government For Community Services1.0313.2%
Area0.4125.3%

Apartments 364 units · 54 towers

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings13,306.25-216
Apartment/Shops/Other Buildings7,434.63-148

Areas are as filed with HRERA. Some rows show a total built-up area rather than one home’s carpet area, as entered by the promoter.

External services

ServiceProvided byApproval taken
RoadsNoWATER SUPPLY
GMDA Memo No. 198 Dated 08/04/2021YesELECTRICITY
DHBVN CH.141/Drg.-Plc Dated 03/04/2021YesSEWAGE DISPOSAL
GMDA/Sew/2021/395 Dated 25/03/2021YesSTORM WATER DRAINAGE
NoSTPGMDA/SEW/2021/397 DATED 25/03/2021
Yes4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:Sr. No.
Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS257.71
Submitted To Town & Country Planning2WATER SUPPLY SYSTEM
188.81SUBMITTED TO TOWN & COUNTRY PLANNING3
Storm Water Drainage58.26SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM0
Yet To Be Prepared5SEWAGE TREATMENT & GARBAGE DISPOSAL
106.59SUBMITTED TO TOWN & COUNTRY PLANNING6
Street Lighting15.81SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING0
Yet To Be Prepared8PLAYGROUNDS AND PARKS
0YET TO BE PREPARED9
Club House/Community Centre0YET TO BE PREPARED
10SHOPPING AREA0
Yet To Be Prepared11RENEWABLE ENERGY SYSTEM
0YET TO BE PREPARED12
School0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0
Yet To Be Prepared14ANY OTHER
0SUBMITTED TO TOWN & COUNTRY PLANNING15
Parking21.56SUBMITTED TO TOWN & COUNTRY PLANNING
16MAINTENANCE OF SERVICE263.93
Yet To Be Prepared5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.12-03-2021
(date)6. Date of approval of Building Plans15-06-2021
(date)7. New projects:i) Likely date of starting the construction work
01-08-2021ii) Likely date of completing the project31-12-2023
iii) Sizes of the plots to be offered in the projectSr. NoPlot Area(In Square Meter)
Number of plots in the project10
0Total0
iv. Type of apartments to be constructed in the project:TypeCarpet area(In Square Meter)
Number of apartmentsNumber of towersApartment/Shops/Other Buildings
13306.24821654
Apartment/Shops/Other Buildings7434.632148
37(vi) Quarterly schedule of development of whole/remaining part of the project:(c) Apartments/Shops/Other Buildings
Expenditure incurred till the date of application (In Lakhs)ParticularsExpenditure
Apartments0Shops
0Plots0
External Development Charges227.55Land Cost Expenditure
2621.78Others Cost27.28
Expenditure to be made in each quarter (In Lakhs)ParticularsYear-2021
Jan-MarApr-JuneJuly-Sep
Oct-DecApartments1000
800Shops0
0Plots0
0Infrastructure Development Charges0
170.60Development Works Internal83.42
External Development Charges113.76Others Cost
381.69290.94Land Cost Expenditure
418.78418.78Internal Development Works
215.03ParticularsYear-2022
Jan-MarApr-JuneJuly-Sep
Oct-DecApartments800
800800800
Shops00
00Plots
000
0Land Cost Expenditure418.78
418.78418.78418.78
Others Cost25.04290.94
318.22260.79Internal Development Works
240.98109.31263.93
External Development Charges113.76113.76
ParticularsYear-2023Jan-Mar
Apr-JuneJuly-SepOct-Dec
Apartments10001000
10000Shops
000
0Plots0
000
Land Cost Expenditure418.78418.78
158.84Others Cost266.09
230.47243.9515.16
External Development Charges113.76113.76
ParticularsYear-2024Jan-Mar
Apr-JuneJuly-SepOct-Dec
Apartments0Shops
0Plots0
External Development Charges113.76Other cost
6.82(d) InfrastructureExpenditure incurred till the date of application (In Lakhs)
ParticularsExpenditureRoads & Pavements
0Water Supply System0
Sewerage treatment & garbage disposal0Electricity Supply System
0Storm Water Drainage0
Parks and Playgrounds0Clubhouse/community centres
0Shopping area0
Other0Expenditure to be made in each quarter (In Lakhs)
ParticularsYear-2021Jan-Mar
Apr-JuneJuly-SepOct-Dec
Roads & Pavements31.2181.54
Water Supply System22.8659.74
Sewerage treatment & garbage disposal12.9133.73
Electricity Supply System00
Storm Water Drainage10.0124.38
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00
Street Light2.726.62
Parking Horticulture3.719.02
ParticularsYear-2022Jan-Mar
Apr-JuneJuly-SepOct-Dec
Roads & Pavements95.6349.33
Water Supply System70.0736.14
Sewerage treatment & garbage disposal39.5520.40
Electricity Supply System00
Storm Water Drainage21.772.10
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00
Parking Horticulture8.050.78
Street Light5.910.56
It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - D
Accounts related information:1. Annex copy of the balance sheet of last 3 yearsYes
2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
3. Bank account to which the deposits received from apartment buyers will be creditedBank and Branch addressHDFC BANK LIMITED 209-214 KAILASH BUILDING 26 KG MARG NEW DELHI-110001
Bank Account number57500000653016IFSC code
HDFC0000003MICR code110240001
Branch code0000034. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)
Lalit Kumar Aggarwal and Pradeep Kumar Aggarwal House No. 34, Road No.61, West Punjabi Bagh Delhi 1100265. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Attached
I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________FORM REP-I
Part - EDetails of the statutory approvals:1. Annex copies of the following in Folder E:
i. Lay out PlanYesii. Demarcation Plan
Yesiii. Zoning PlanYes
iv. Building PlanYesSite Plan
NoFloor PlanYes
Apartment PlansYesElevation Section
YesDetail of Permissible FARYes
Detail of covered area achieved FARNo2. Annex copies of the following in Folder E:
I. Roads And Pavement PlanYesII. ELECTRICITY SUPPLY PLAN
NoIII. WATER SUPPLY PLANYes
IV. Sewerage And Garbage Disposal PlanYesV. STROM WATER DRAINAGE
YesVI. 10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYYes
Vii. Street Lighting PlanNoVIII. PARKING PLAN
No3. Statutory Approvals StatusStatutory Approvals
Statutory Approvals StatusDateI. LICENSE APPROVAL 12 OF 2021
Already Been Obtained12-03-2021II. ZONING PLAN APPROVAL DRG. NO. DTCP7738
Already Been Obtained20-04-2021III. WATER SUPPLY MEMO NO. 198
Already Been Obtained08-04-2021IV. SEWAGE DISPOSAL GMDA/SEW/2021/395
Already Been Obtained25-03-2021V. STP TREATED WATER GMDA/SEW/2021/397
Already Been Obtained25-03-2021VI. ELECTRICAL LOAD AVAILABILITY CH.141/DRG.-PLC
Already Been Obtained03-04-2021VII. FOREST NOC JFV-QFK-Y5YP & JT8-DAD-BE2T
Already Been Obtained13-11-2020VIII. LAYOUT PLAN
Already Been Obtained12-03-2021It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees.
Signature _____________Seal _____________Date _____________
Form Rep-IPart - F1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.
Yes2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)(Annex a copy in Folder F)
Yes3. Gist of the important provisions of the Draft Agreement(Annex a copy in Folder F)
AttachedI hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - GProjects launched by the promoter in last five years: (No Projects)
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - H
Specification Of ConstructionSpecification of apartments and other buildings including the following:1
Flooring Details Of Various Parts Of HouseVITRIFIED & CERAMIC TILES2
Wall Finishing DetailsOBD3
Kitchen DetailsISI MARKED4
Bathroom FittingsISI MARKED5
Wood Work EtcISI MARKED6
Doors And Windos FramesWOODEN(DOOR FRAME), ALUMINIUMN/UPVC(WINDOW FRAME)7
Glass WorkISI MARKED8
Electric FittingsISI MARKED9
Conducting And Wiring DetailsISI MARKED10
Cupboard DetailsNA11
Water StorageRCC/PVC12
Lift DetailsISI MARKED13
External GlazingsNA13.1
Windows/GlazingsALUMINIUMN/UPVC14
DoorsNA14.1
Main DoorsFLUSH DOOR14.2
Internal DoorsFLUSH DOOR15
Air ConditioningNA16
Electrical FittingsISI MARKED17
Cng Pipe LineNA18
Provision Of Wifi And Broadband FacilityNA19
External Finishing/Colour SchemeTEXTURE PAINT20
Internal FinishingNASPECIFICATION UNIT WISE
1 . Living/Dining/Foyer/Family Lounge1 . 1FLOOR
Vitrified Tile1 . 2WALLS
Obd1 . 3CEILING
Obd2 . MASTER BEDROOM/DRESSROOM2 . 1
FloorVITRIFIED TILE2 . 2
WallsOBD2 . 3
CeilingOBD2 . 4
Modular WardrobesNA3 . MASTER TOILET
3 . 1FLOORCERAMIC TILE(ANTI-SKID)
3 . 2WALLSCERAMIC TILE
3 . 3CEILINGGRID CEILING
3 . 4COUNTERSNA
3 . 5SANITARY WARE/CP FITTINGSISI MARKED
3 . 6FITTING/FIXTURESISI MARKED
4 . Bed Rooms4 . 1FLOOR
Vitrified Tile4 . 2WALLS
Obd4 . 3CEILING
Obd4 . 4WARDROBES
Na5 . TOILET5 . 1
FloorVITRIFIED TILE5 . 2
WallsOBD5 . 3
CeilingOBD5 . 4
CountersNA5 . 5
Sanitary Ware/Cp FittingsISI MARKED5 . 6
FixturesISI MARKED6 . KITCHEN
6 . 1FLOORVITRIFIED TILES
6 . 2WALLSOBD
6 . 3CEILINGOBD
6 . 4COUNTERSGRANITE
6 . 5FIXTURESISI MARKED
6 . 6KITCHEN APPLIANCESNA
7 . Utility Rooms/Utility Balcony/Toilet7 . 1FLOOR
Na7 . 2WALLS & CEILING
Na7 . 3TOILET
Na7 . 4BALCONY
Na8 . SIT-OUTS8 . 1
FloorNA8 . 2
Walls & CeilingNA8 . 3
RailingsNA8 . 4
FixturesNAI hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________List of Uploaded DocumentsSr. No.
Document DescriptionDate of Document UploadView Document
1COPY OF LICENSE ALONG WITH SCHEDULE OF LAND18-06-2021
View Document2IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN
18-06-2021View Document3
Declaration Supported By Affidavit Duly Signed By The Promoter To Be Enclosed.18-06-2021View Document
4ARAVALI18-06-2021
View Document5BR FOR RERA ACCOUNTS
18-06-2021View Document6
Forest Noc18-06-2021View Document
7FOREST NOC18-06-2021
View Document8NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT
18-06-2021View Document9
Zoning Plan18-06-2021View Document
10SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN18-06-2021
View Document11IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN
18-06-2021View Document12
Certificate From A Chartered Accountant Certifying That The Informstion Provided By The Applicant In Form Rep-1-C-X Is Correct As Per The Books Of Accounts/ Balance Sheet Of The Applicant18-06-2021View Document
13CASH FLOW STATEMENT OF THE PROPOSED PROJECT18-06-2021
View Document14DEMARCATION PLAN
18-06-2021View Document15
Documents Relating To The Entry Of License And Collaboration Agreement In The Revenue Record18-06-2021View Document
16POWER ASSURANCE18-06-2021
View Document17WATER ASSURANCE
18-06-2021View Document18
Sewerage Assurance18-06-2021View Document
19STP18-06-2021
View Document20SERVICE ESTIMATES APPLIED RECEIVING
18-06-2021View DocumentI hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________Documents Uploaded After RegistrationSr. No.
Document DescriptionDate of Document UploadView Document
1Amendment in the Registration Certificate after change in saleable area of the project pursuant to the revision in layout plan.01-08-2023
View Document2Extension No. 04 of 2024 dated 13.05.2024
23-05-2024View Document3
PROJECT CONTINUATION- RC/REP/HARERA/GGM/39 of 2021/7(3)/70/2025/12 DATED 13.05.202520-05-2025View Document
4PROJECT CONTINUATION- RC/REP/HARERA/GGM/39 OF 2021/7(3)/70/2025/12 DATED 11.11.202512-11-2025
View DocumentI hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 2.58 CrSubmitted To Town & Country Planning
Water Supply System₹ 1.89 CrSubmitted To Town & Country Planning
Storm Water Drainage₹ 58.26 lakhSubmitted To Town & Country Planning
Sewage Treatment & Garbage Disposal₹ 1.07 CrSubmitted To Town & Country Planning
Street Lighting₹ 15.81 lakhSubmitted To Town & Country Planning
Parking₹ 21.56 lakhSubmitted To Town & Country Planning
Maintenance Of Service₹ 2.64 CrYet To Be Prepared

Statutory approvals

ApprovalStatusDate
License Approval 12 Of 2021Already Been Obtained12 Mar 2021
Zoning Plan Approval Drg. No. DTCP7738Already Been Obtained20 Apr 2021
Water Supply Memo No. 198Already Been Obtained8 Apr 2021
Sewage Disposal GMDA/Sew/2021/395Already Been Obtained25 Mar 2021
Stp Treated Water GMDA/Sew/2021/397Already Been Obtained25 Mar 2021
Electrical Load Availability CH.141/Drg.-PlcAlready Been Obtained3 Apr 2021
Forest Noc Jfv-Qfk-Y5YP & JT8-Dad-BE2TAlready Been Obtained13 Nov 2020
Layout PlanAlready Been Obtained12 Mar 2021

Specifications (as filed)

Flooring Details Of Various Parts Of HouseVitrified & Ceramic Tiles
Wall Finishing DetailsObd
Kitchen DetailsIsi Marked
Bathroom FittingsIsi Marked
Wood Work EtcIsi Marked
Doors And Windos FramesWooden(Door Frame), Aluminiumn/Upvc(Window Frame)
Glass WorkIsi Marked
Electric FittingsIsi Marked
Conducting And Wiring DetailsIsi Marked
Water StorageRcc/Pvc
Lift DetailsIsi Marked
Windows/GlazingsAluminiumn/Upvc
Main DoorsFlush Door
Internal DoorsFlush Door
Electrical FittingsIsi Marked
External Finishing/Colour SchemeTexture Paint

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Signature Global City 92-(1)?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.