HearingApproved And Ready For Certificate Issuing ProcessView order Proceedings
Sh. Ashish Kush, Planning Executive and Sh. Ashish Dubey, Accountant briefed about the facts of the case. Sh. Mandeep Singh Oberoi and Sh. Himanshu Juneja, AR are present on behalf of the promoter The AR of the promoter that the company has applied for RC in respect of the Phase B approved by DTCP in the Building plans for an area admeasuring 5.41 Acres and earlier this portion of land was also reserved for future expansion. The OC in respect of Phase-A admeasuring 15.60 acres already stands obtained on 29.08.2016 before commencement of the Act, 2016. The AR further states that all the services and facilities of the Phase B shall be independent of the earlier phase already handed over to the RWA after filing DOD. The environment clearance has already been recommended by the committee and vide letter dated 23.01.2024, the Member-secretary of SEIAA Haryana has conveyed to consider the approval after appointment of chairperson of SEIAA, Haryana. In view of the same, the authority grants four months’ time for submission of approved Environment Clearance failing which the penal proceedings including freezing of accounts shall be initiated. The Re-validated Mining permission shall also be submitted before start of excavation/construction. Approved as proposed.
Registration grantedGGM/787/519/2024/14
Certificate uploadedRC Uploaded
Registration valid till
Land, licence & cost
Land area of the project
5.411 acres
Total licensed area
21.01 acres
Licence
License no. 55 of 2010, License no. 87 of 2012 and License no. 33 of 2013
FAR permissible / proposed
5.12 / 5.12
Estimated project cost
₹ 1,560.75 Cr
Cost of land
₹ 53.62 Cr
Cost of construction
₹ 840.57 Cr
Infrastructure and other structures
₹ 176.8 Cr
EDC, taxes, levies and other costs
₹ 489.75 Cr
How the land will be used
Use
Acres
Share
Land Area To Be Used For Construction Of Apartments
1.2079
21.9%
Construction Of Roads
1.5793
28.6%
Parks And Playgrounds
0.5033
9.1%
Green Belts
0.5
9%
Vehicle Parkings
1.2825
23.2%
Club House
0.2825
5.1%
Primary
0.1704
3.1%
Apartments 692 units · 6 towers
Type
Carpet area (sq m)
Carpet area (sq ft)
Units
Apartment/Shops/Other Buildings
122.97
1,324
248
Apartment/Shops/Other Buildings
102.93
1,108
4
Apartment/Shops/Other Buildings
129.96
1,399
308
Apartment/Shops/Other Buildings
108.89
1,172
6
Apartment/Shops/Other Buildings
184.06
1,981
60
Apartment/Shops/Other Buildings
177.34
1,909
2
Apartment/Shops/Other Buildings
130.53
1,405
64
Areas are as filed with HRERA.
External services
Service
Provided by
Approval taken
Roads
GMDA
Yes
Water Supply
GMDA / HSVP
Yes
Electricity
DHBVN
Yes
Sewage Disposal
GMDA
Yes
Storm Water Drainage
GMDA
Yes
Facilities in the service plan
Facility
Estimated cost
Status
Internal Roads And Pavements
₹ 27.47 Cr
Yet To Be Prepared
Water Supply System
₹ 6.78 Cr
Yet To Be Prepared
Storm Water Drainage
₹ 4.51 Cr
Yet To Be Prepared
Electricity Supply System
₹ 31.36 Cr
Yet To Be Prepared
Sewage Treatment & Garbage Disposal
₹ 2.67 Cr
Yet To Be Prepared
Street Lighting
₹ 2 Cr
Yet To Be Prepared
Security And Fire Fighting
₹ 39.11 Cr
Yet To Be Prepared
Playgrounds And Parks
₹ 9.28 Cr
Yet To Be Prepared
Club House/Community Centre
₹ 69.53 Cr
As Per Project Report
Renewable Energy System
₹ 1.04 Cr
Yet To Be Prepared
School
₹ 9.42 Cr
As Per Project Report
Sewerage System
₹ 2.52 Cr
Yet To Be Prepared
Parking
₹ 22.52 Cr
Yet To Be Prepared
Underground Water Tank
₹ 1.41 Cr
Yet To Be Prepared
Rain Water Harvesting
₹ 1.55 Cr
Yet To Be Prepared
Electrical Sub Station
₹ 24.58 Cr
Yet To Be Prepared
Statutory approvals
Approval
Status
Date
Building Plan Approval
Already Been Obtained
2 Jan 2024
Aai
Already Been Obtained
22 Jun 2022
Specifications (as filed)
Flooring Details Of Various Parts Of House
Tiles / Marbles (Tile Make - Kajaria / Somany / Johnson Or Equivalent).
Wall Finishing Details
Obd / Acrylic Emulsion Paint (Make - Asian / Ici Dulux / Berger Or Equivalent).
Kitchen Details
Tile Flooring, Stone Counter, Wall Tile Above Counter Upto 2 Feet, Obd / Acrylic Emulsion On Wall Above That (Tile Make - Kajaria / Somany / Johnson Or Equivalent Paint Make - Asian / Ici Dulux / Berger Or Equivalent).
Bathroom Fittings
Isi Marked Standard Sanitary Fitting (Make - Cera / Hindware / Jaquar Or Equivalent).
Doors And Windos Frames
For Windows - Aluminium / Upvc Frame; Hardwood Frames For Doors.
SS Finish Cabin / Doors As Per Approved Design / Drawings.
External Glazings
Aluminium / Upvc (Make - Sourced From Fenesta / Lingel / Polywood / Aldowin Or Equivalent).
Windows/Glazings
Aluminium / Upvc (Make - Sourced From Fenesta / Lingel / Polywood / Aldowin Or Equivalent).
Doors
Laminated Flush Doors / Skin Doors.
Main Doors
Laminated Flush Doors / Skin Doors.
Internal Doors
Laminated Flush Doors / Skin Doors.
Air Conditioning
Vrf / Split Acs / Window As Per Approved Design & Drawings.
Electrical Fittings
Isi Marked Standard Electrical Fitting.
External Finishing/Colour Scheme
Weather Resistant External Grade Paint (Make - Asian / Ici Dulux / Berger Or Equivalent).
Internal Finishing
As Per Approved Design / Drawings.
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Puri Diplomatic Residences?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.