Plots At Gardencity, Sec 91, 92
by DLF Limited · Sector 91-92, Gurugram
- RERA registration
- Applied, not granted yet
- Applied on
- 13 Nov 2024
- Application status
- Rejected
- Project ID
- RERA-GRG-1748-2024
- Land area
- 9.427 acres
- Plots
- 77
- Completion (as filed)
- 30 Apr 2030
- Estimated cost
- ₹ 63.57 Cr
This project has applied for RERA registration but has not been granted it yet. Under RERA it cannot be advertised, marketed or sold until it is registered.
RERA registration
| Registration certificate | Not issued yet: the application is being processed by HRERA Gurugram |
|---|---|
| Project ID | RERA-GRG-1748-2024 |
| Authority | HRERA Gurugram |
| Project type (as filed) | New |
| Project name | Plots At Gardencity, Sec 91, 92 |
| Promoter | DLF Limited |
| Promoter’s registered office | DLF Shopping Mall, 3RD Floor, Arjun Marg, DLF City, Phase I, Gurugram 122002, Haryana (India) |
| CIN | L70101HR1963PLC002484 |
| Site address | Sector 91-92, Gurugram |
| Sector | Sector 91 |
| Tehsil / District | Gurgaon / Gurugram |
| Layout plan approved | 20 Jun 2024 |
| Construction start (as filed) | 1 Nov 2024 |
| Completion (as filed) | 30 Apr 2030 |
| Application submitted | 13 Nov 2024 |
Authority, hearings & orders
- Application submitted online
-
Hearing
Examination By Authority
Proceedings
The matter is adjourned and to come up on 23.12.2024.
-
Hearing
Adjournment
Proceedings
The matter is adjourned and to come up on 06.01.2025.
-
Hearing
Adjournment
Proceedings
Due to gazetted holiday, the matter is adjourned and to come up on 08.01.2025 at 03:00 PM.
-
Hearing
Adjournment View order
Proceedings
Ms. Nikita Mittal, Planning Executive briefed about the facts of the case. Sh. Anish Dham (AR), Sh. Saurabh Chorasia (AR) and Sh. Awanish Shukla (AR) are present on behalf of the promoter. The promoter has obtained additional license no. 130 of 2023 in addition to other licenses granted for residential plotted colony and accordingly plan has been revised. The promoter has applied for registration of area measuring 9.4275 acres (1.9375 acres additional license area + 7.49 acres part of earlier licenses where there is revision in layout plan). Therefore, in view of the same, a public notice to be published in three leading newspapers, one Hindi and two English newspapers w.r.t. revision in the layout plan for inviting objections if any. Further, the promoter is also directed to submit a detailed comparative table for revision in layout plan highlighting the same on revised layout plan along with the rectification of balanced deficiencies. Meanwhile, the Authority directed Sh. Sumeet (EO) and Sh. Ashish Kush (PE), officials of Authority to visit the site of the project and check the status for the same. The matter to come up on 20.01.2025.
-
Hearing
Adjournment
Proceedings
The matter is adjourned and to come up on 10.02.2025.
-
Hearing
Adjournment
Proceedings
The matter is adjourned and to come up on 11.02.2025 at 03:00 PM.
-
Hearing
Adjournment
Proceedings
Ms. Nikita Mittal, Planning Executive and Sh. Ashish Dubey, Chartered Accountant briefed about the facts of the case. Sh. Anish Dham (AR), Sh. Saurabh Choraria (AR) and Sh. Awanish Shukla (AR) are present on behalf of the promoter. A public notice has been published in the newspapers on 24.01.2025 regarding change in layout plan and no objections have been received in this regard within stipulated time. Further, the promoter is required to submit 2/3rd consent of the allottees in respect of the amendment in the layout plan as the area under revision is more than one acre. The matter to come up on 17.03.2025.
-
Hearing
Adjournment
Proceedings
The matter is adjourned and to come up on 07.04.2025.
-
Hearing
Adjournment
Proceedings
The matter is adjourned and to come up on 05.05.2025.
- Hearing Rejected View order
Land, licence & cost
| Land area of the project | 9.427 acres |
|---|---|
| Total licensed area | 9.427 acres |
| Licence | 130 of 2023 |
| FAR permissible / proposed | 1 / 1 |
| Estimated project cost | ₹ 63.57 Cr |
| Cost of land | ₹ 18.07 Cr |
| Infrastructure and other structures | ₹ 40.5 Cr |
| EDC, taxes, levies and other costs | ₹ 5 Cr |
How the land will be used
| Use | Acres | Share |
|---|---|---|
| Plots To Be Sold | 4.72 | 50.1% |
| Construction Of Roads | 1.1698 | 12.4% |
| Pavements | 0.4642 | 4.9% |
| Parks And Playgrounds | 0.1526 | 1.6% |
| Green Belts | 0.22 | 2.3% |
| Electricity Sub-Station | 0.1034 | 1.1% |
| Sewage And Solid Waste Treatment Facility | 0.4 | 4.2% |
| Any Other | 2.1334 | 22.6% |
| EWS | 0.0618 | 0.7% |
Plots 77 plots
| Plot size (sq m) | Sq yd | Sq ft | Plots |
|---|---|---|---|
| 125.00 | 149 | 1,345 | 3 |
| 159.00 | 190 | 1,711 | 1 |
| 173.00 | 207 | 1,862 | 1 |
| 179.00 | 214 | 1,927 | 1 |
| 205.00 | 245 | 2,207 | 1 |
| 209.00 | 250 | 2,250 | 5 |
| 225.00 | 269 | 2,422 | 52 |
| 388.00 | 464 | 4,176 | 4 |
| 393.00 | 470 | 4,230 | 1 |
| 410.00 | 490 | 4,413 | 1 |
| 413.00 | 494 | 4,445 | 3 |
| 420.00 | 502 | 4,521 | 3 |
| 421.00 | 504 | 4,532 | 1 |
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | Yes | WATER SUPPLY |
| GMDA I/9310/2024 | Yes | ELECTRICITY |
| Memo No. Ch-05/Se/C-Sol-405 | Yes | SEWAGE DISPOSAL |
| GMDA/Sew/2024/424 | Yes | STORM WATER DRAINAGE |
| Memo No - 51144 | Yes | 4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report: |
| Sr. No. | Name of the facility | Estimated cost (In Lakhs)(Within the project area only) |
| Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C) | 1 | INTERNAL ROADS AND PAVEMENTS |
| 806 | AS PER PROJECT REPORT | 2 |
| Water Supply System | 142 | AS PER PROJECT REPORT |
| 3 | STORM WATER DRAINAGE | 369 |
| As Per Project Report | 4 | ELECTRICITY SUPPLY SYSTEM |
| 1166 | AS PER PROJECT REPORT | 5 |
| Sewage Treatment & Garbage Disposal | 227 | AS PER PROJECT REPORT |
| 6 | STREET LIGHTING | 150 |
| As Per Project Report | 7 | SECURITY AND FIRE FIGHTING |
| 0 | AS PER PROJECT REPORT | 8 |
| Playgrounds And Parks | 527 | AS PER PROJECT REPORT |
| 9 | CLUB HOUSE/COMMUNITY CENTRE | 0 |
| As Per Project Report | 10 | SHOPPING AREA |
| 0 | AS PER PROJECT REPORT | 11 |
| Renewable Energy System | 0 | AS PER PROJECT REPORT |
| 12 | SCHOOL | 0 |
| As Per Project Report | 13 | HOSPITAL/DISPENSARY |
| 0 | AS PER PROJECT REPORT | 14 |
| Any Other | 0 | AS PER PROJECT REPORT |
| 15 | EARTHWORK | 300 |
| As Per Project Report | 16 | BOUNDARY WALL |
| 243 | AS PER PROJECT REPORT | 17 |
| Rain Water Harvesting | 122 | AS PER PROJECT REPORT |
| 5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed. | 20-06-2024 | (date) |
| 6. Date of approval of Building Plans | NA | (date) |
| 7. New projects: | i) Likely date of starting the construction work | 01-11-2024 |
| ii) Likely date of completing the project | 30-04-2030 | iii) Sizes of the plots to be offered in the project |
| Sr. No | Plot Area(In Square Meter) | Number of plots in the project |
| 1 | 125 | 3 |
| 2 | 159 | 1 |
| 3 | 173 | 1 |
| 4 | 179 | 1 |
| 5 | 205 | 1 |
| 6 | 209 | 5 |
| 7 | 225 | 52 |
| 8 | 388 | 4 |
| 9 | 393 | 1 |
| 10 | 410 | 1 |
| 11 | 413 | 3 |
| 12 | 420 | 3 |
| 13 | 421 | 1 |
| Total | 77 | iv. Type of apartments to be constructed in the project: |
| Type | Carpet area(In Square Meter) | Number of apartments |
| Number of towers | Apartment/Shops/Other Buildings | 0 |
| 0 | 0 | (vi) Quarterly schedule of development of whole/remaining part of the project: |
| (c) Apartments/Shops/Other Buildings | Expenditure incurred till the date of application (In Lakhs) | Particulars |
| Expenditure | Apartments | 0 |
| Shops | 0 | Plots |
| 0 | Expenditure to be made in each quarter (In Lakhs) | Particulars |
| Expenditure to be made in each quarter ( | ) | Apr-June |
| July-Sep | Oct-Dec | Jan-Mar |
| (d) Infrastructure | Expenditure incurred till the date of application (In Lakhs) | Particulars |
| Expenditure | Roads & Pavements | 0 |
| Water Supply System | 0 | Sewerage treatment & garbage disposal |
| 0 | Electricity Supply System | 0 |
| Storm Water Drainage | 0 | Parks and Playgrounds |
| 0 | Clubhouse/community centres | 0 |
| Shopping area | 0 | Other |
| 0 | Expenditure to be made in each quarter (In Lakhs) | Particulars |
| Year-2025 | Jan-Mar | Apr-June |
| July-Sep | Oct-Dec | Roads & Pavements |
| 0 | Water Supply System | 0 |
| Sewerage treatment & garbage disposal | 0 | Electricity Supply System |
| 0 | Storm Water Drainage | 0 |
| Parks and Playgrounds | 0 | Clubhouse/community centres |
| 0 | Shopping area | 0 |
| Other | 0 | Earthwork |
| 14.99 | Particulars | Year-2026 |
| Jan-Mar | Apr-June | July-Sep |
| Oct-Dec | Roads & Pavements | 0 |
| 0 | 0 | 0 |
| Water Supply System | 0 | 0 |
| 0 | 0 | Sewerage treatment & garbage disposal |
| 0 | 0 | 0 |
| 0 | Electricity Supply System | 0 |
| 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 |
| 0 | 0 | Parks and Playgrounds |
| 0 | 0 | 0 |
| 0 | Clubhouse/community centres | 0 |
| 0 | 0 | 0 |
| Shopping area | 0 | 0 |
| 0 | 0 | Other |
| 0 | 0 | 0 |
| 0 | Earthwork | 14.99 |
| 14.99 | 14.99 | 14.99 |
| Particulars | Year-2027 | Jan-Mar |
| Apr-June | July-Sep | Oct-Dec |
| Roads & Pavements | 0 | 0 |
| 0 | 0 | Water Supply System |
| 0 | 0 | 0 |
| 0 | Sewerage treatment & garbage disposal | 0 |
| 0 | 0 | 0 |
| Electricity Supply System | 0 | 0 |
| 0 | 0 | Storm Water Drainage |
| 0 | 0 | 0 |
| 0 | Parks and Playgrounds | 0 |
| 0 | 0 | 0 |
| Clubhouse/community centres | 0 | 0 |
| 0 | 0 | Shopping area |
| 0 | 0 | 0 |
| 0 | Other | 0 |
| 0 | 0 | 0 |
| Earthwork | 14.99 | 14.99 |
| 14.99 | 14.99 | Particulars |
| Year-2028 | Jan-Mar | Apr-June |
| July-Sep | Oct-Dec | Roads & Pavements |
| 0 | 0 | 0 |
| 0 | Water Supply System | 0 |
| 0 | 0 | 0 |
| Sewerage treatment & garbage disposal | 0 | 0 |
| 0 | 0 | Electricity Supply System |
| 0 | 0 | 0 |
| 0 | Storm Water Drainage | 0 |
| 0 | 0 | 0 |
| Parks and Playgrounds | 0 | 0 |
| 0 | 0 | Clubhouse/community centres |
| 0 | 0 | 0 |
| 0 | Shopping area | 0 |
| 0 | 0 | 0 |
| Other | 0 | 0 |
| 0 | 0 | Earthwork |
| 14.99 | 14.99 | 14.99 |
| 14.99 | Particulars | Year-2029 |
| Jan-Mar | Apr-June | July-Sep |
| Oct-Dec | Roads & Pavements | 0 |
| 0 | 0 | 0 |
| Water Supply System | 0 | 0 |
| 0 | 0 | Sewerage treatment & garbage disposal |
| 0 | 0 | 0 |
| 68.04 | Electricity Supply System | 0 |
| 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 |
| 0 | 0 | Parks and Playgrounds |
| 0 | 0 | 0 |
| 0 | Clubhouse/community centres | 0 |
| 0 | 0 | 0 |
| Shopping area | 0 | 0 |
| 0 | 0 | Other |
| 0 | 0 | 0 |
| 0 | Earthwork | 14.99 |
| 14.99 | 14.99 | 14.99 |
| Boundary wall | 48.60 | Particulars |
| Year-2030 | Jan-Mar | Apr-June |
| July-Sep | Oct-Dec | Roads & Pavements |
| 0 | 120.89 | 161.19 |
| 161.19 | Water Supply System | 0 |
| 0 | 63.79 | 49.61 |
| Sewerage treatment & garbage disposal | 90.72 | 68.04 |
| 0 | 0 | Electricity Supply System |
| 0 | 233.28 | 116.64 |
| 233.28 | Storm Water Drainage | 0 |
| 110.57 | 147.42 | 110.57 |
| Parks and Playgrounds | 0 | 0 |
| 0 | 157.95 | Clubhouse/community centres |
| 0 | 0 | 0 |
| 0 | Shopping area | 0 |
| 0 | 0 | 0 |
| Other | 0 | 0 |
| 0 | 0 | Earthwork |
| 14.99 | 14.99 | Boundary wall |
| 36.45 | 60.75 | 48.60 |
| 48.60 | Rain water harvesting | 42.53 |
| 42.53 | 36.45 | Street Lighting |
| 44.96 | Particulars | Year-2031 |
| Jan-Mar | Apr-June | July-Sep |
| Oct-Dec | Roads & Pavements | 241.79 |
| 120.89 | Water Supply System | 28.35 |
| 0 | Sewerage treatment & garbage disposal | 0 |
| 0 | Electricity Supply System | 349.92 |
| 233.28 | Storm Water Drainage | 0 |
| 0 | Parks and Playgrounds | 184.28 |
| 184.28 | Clubhouse/community centres | 0 |
| 0 | Shopping area | 0 |
| 0 | Other | 0 |
| 0 | Street Lighting | 44.96 |
| 59.94 | It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented. | Signature of the Applicant / Authorised Representative |
| Stamp _____________ | Date _____________ | FORM REP-I |
| Part - D | Accounts related information: | 1. Annex copy of the balance sheet of last 3 years |
| Yes | 2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D. | Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form. |
| Yes | 3. Bank account to which the deposits received from apartment buyers will be credited | Bank and Branch address |
| Icici Bank Limited 9A, Phelps Building, 2ND Floor , Connaught Place, New Delhi - 110001 | Bank Account number | 0000000000 |
| IFSC code | ICIC0000007 | MICR code |
| Branch code | 0007 | 4. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority) |
| 5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details) | I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. |
| Signature of the Applicant / Authorised Representative | Stamp _____________ | Date _____________ |
| Form Rep-I | Part - E | Details of the statutory approvals: |
| 1. Annex copies of the following in Folder E: | i. Lay out Plan | Yes |
| ii. Demarcation Plan | Yes | iii. Zoning Plan |
| Yes | iv. Building Plan | No |
| Site Plan | No | Floor Plan |
| No | Apartment Plans | No |
| Elevation Section | No | Detail of Permissible FAR |
| No | Detail of covered area achieved FAR | No |
| 2. Annex copies of the following in Folder E: | I. ROADS AND PAVEMENT PLAN | Yes |
| II. Electricity Supply Plan | Yes | III. WATER SUPPLY PLAN |
| Yes | IV. SEWERAGE AND GARBAGE DISPOSAL PLAN | Yes |
| V. Strom Water Drainage | Yes | VI. 10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITY |
| No | VII. STREET LIGHTING PLAN | No |
| Viii. Parking Plan | No | 3. Statutory Approvals Status |
| Statutory Approvals | Statutory Approvals Status | Date |
| I. Environment Clearance | APPLIED FOR BUT YET TO RECEIVE | NA |
| It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees. | Signature _____________ | Seal _____________ |
| Date _____________ | FORM REP-I | Part - F |
| 1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers. | (Annex a copy in Folder F) | Yes |
| 2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules) | (Annex a copy in Folder F) | Yes |
| 3. Gist of the important provisions of the Draft Agreement | (Annex a copy in Folder F) | I hereby declare that the above information and particulars are based on record and are true to the |
| best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | FORM REP-I | Part - G |
| Projects launched by the promoter in last five years: | 1. Name and location of the project | SUMMIT PLAZA SECTOR-54, GURUGRAM,HARYANA |
| 2. Particulars of the project in brief: | i. Total area of the project | 2.65 |
| ii. Total number of apartments | 311 | iii. Total number of plots |
| 1 | 3. The number of plots/ apartments booked/sold to the allottees: | (a) Apartments |
| 311 | (b) Plots | 1 |
Facilities in the service plan
| Facility | Estimated cost | Status |
|---|---|---|
| Internal Roads And Pavements | ₹ 8.06 Cr | As Per Project Report |
| Water Supply System | ₹ 1.42 Cr | As Per Project Report |
| Storm Water Drainage | ₹ 3.69 Cr | As Per Project Report |
| Electricity Supply System | ₹ 11.66 Cr | As Per Project Report |
| Sewage Treatment & Garbage Disposal | ₹ 2.27 Cr | As Per Project Report |
| Street Lighting | ₹ 1.5 Cr | As Per Project Report |
| Playgrounds And Parks | ₹ 5.27 Cr | As Per Project Report |
| Earthwork | ₹ 3 Cr | As Per Project Report |
| Boundary Wall | ₹ 2.43 Cr | As Per Project Report |
| Rain Water Harvesting | ₹ 1.22 Cr | As Per Project Report |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| Environment Clearance | Applied For But Yet To Receive |
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.