Nandaka
by Ganga Global Homes Private Limited · Village Sihi, Sector-84
- RERA registration
- Applied, not granted yet
- Applied on
- 14 Nov 2025
- Application status
- Return
- Project ID
- RERA-GRG-2106-2025
- Land area
- 5.841 acres
- Estimated cost
- ₹ 1,410.41 Cr
This project has applied for RERA registration but has not been granted it yet. Under RERA it cannot be advertised, marketed or sold until it is registered.
RERA registration
| Registration certificate | Not issued yet: the application is being processed by HRERA Gurugram |
|---|---|
| Project ID | RERA-GRG-2106-2025 |
| Authority | HRERA Gurugram |
| Project type (as filed) | Ongoing |
| Project name | Nandaka |
| Promoter | Ganga Global Homes Private Limited |
| Promoter’s registered office | 806-807, Best Sky Tower, Nsp, Pitampura, New Delhi-110034 |
| CIN | U70100DL2020PTC361825 |
| Site address | Village Sihi, Sector-84 |
| Sector | Sector 84 |
| Tehsil / District | Gurgaon / Gurugram |
| Layout plan approved | 19 Sep 2025 |
| Building plans approved | 19 Sep 2025 |
| Application submitted | 14 Nov 2025 |
Authority, hearings & orders
- Application submitted online
- Application received by HRERA Gurugram
- Notice sent to the promoter Deficiency notice
-
Hearing
Examination By Authority View order
Proceedings
Matter is adjourned to 29.12.2025.
-
Hearing
Adjournment View order
Proceedings
Matter is adjourned to 05.01.2026
-
Hearing
Return View order
Proceedings
Ms. Prachi Singh, Planning Executive briefed about the facts of the project. Sh. Ashok Kumar (AR), Sh. Ashwani Kumar (AR) are present on behalf of the promoter. The AR of the promoter states that the project was earlier registered vide registration certificate no. 96 of 2023 which consist of 4 towers and EWS units. Now, due to revision in building plans, they have submitted the application for amendment in registration certificate. The said application consists of 5 Towers, 1 commercial block and EWS units. Subsequently, the public notice was published regarding any objections for application against which 41 objections have been received by the authority. The allottees present during proceedings submits that density is more than doubled from what was originally committed. New towers are proposed to be added, resulting in reduced land parcel per flat and blockage of views for existing towers and no consent has been taken from existing allottees before proposing these changes. It is noted that the promoter has not submitted the consent of the allottees in the project as required under section 14(2) of the Act, 2016. The relevant portion of the said section is reproduced below: - 14. (2) Notwithstanding anything contained in any law, contract or agreement, after the sanctioned plans, layout plans and specifications and the nature of the fixtures, fittings, amenities and common areas, of the apartment, plot or building, as the case may be, as approved by the competent authority, are disclosed or furnished to the person who agree to take one or more of the said apartment, plot or building, as the case may be, the promoter shall not make- (i) ……………………………… (ii) any other alterations or additions in the sanctioned plans, layout plans and specifications of the buildings or the common areas within the project without the previous written consent of at least two-thirds of the allottees, other than the promoter, who have agreed to take apartments in such building. Keeping in view the fact that the promoter has failed to submit the consent of two-thirds of the allottees of the project, as required under Section 14(2) of the Act ibid, the approved phasing plan of the project, the prescribed fee, and other deficiencies as conveyed vide notice dated 12.12.2025, the Authority hereby returns the application to the promoter. The processing fee amounting to Rs.7,99,651/- shall be forfeited, and the registration fee shall be adjusted as and when a complete application is received by the Authority.
Land, licence & cost
| Land area of the project | 5.841 acres |
|---|---|
| Total licensed area | 8.344 acres |
| Licence | Lic. No. 127/ 2023 dated 16.06.2023 |
| FAR permissible / proposed | 2.65 / 2.65 |
| Estimated project cost | ₹ 1,410.41 Cr |
| Cost of land | ₹ 62.84 Cr |
| Cost of construction | ₹ 860.09 Cr |
| Infrastructure and other structures | ₹ 255.35 Cr |
| EDC, taxes, levies and other costs | ₹ 232.13 Cr |
How the land will be used
| Use | Acres | Share |
|---|---|---|
| Land Area To Be Used For Construction Of Apartments | 2.0092 | 34.4% |
| Construction Of Roads | 0.8804 | 15.1% |
| Pavements | 1.1366 | 19.5% |
| Parks And Playgrounds | 0.8821 | 15.1% |
| Green Belts | 0.3706 | 6.3% |
| Vehicle Parkings | 0.4447 | 7.6% |
| Any Other | 0.117 | 2% |
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | No | WATER SUPPLY |
| HSVP | Yes | ELECTRICITY |
| GMDA | Yes | SEWAGE DISPOSAL |
| HSVP | Yes | STORM WATER DRAINAGE |
| HSVP | Yes | 4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report: |
| Sr. No. | Name of the facility | Estimated cost (In Lakhs)(Within the project area only) |
| Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C) | 1 | INTERNAL ROADS AND PAVEMENTS |
| 682.46 | YET TO BE PREPARED | 2 |
| Water Supply System | 1023.69 | YET TO BE PREPARED |
| 3 | STORM WATER DRAINAGE | 1194.31 |
| Yet To Be Prepared | 4 | ELECTRICITY SUPPLY SYSTEM |
| 1194.31 | YET TO BE PREPARED | 5 |
| Sewage Treatment & Garbage Disposal | 1023.69 | YET TO BE PREPARED |
| 6 | STREET LIGHTING | 511.85 |
| Yet To Be Prepared | 7 | SECURITY AND FIRE FIGHTING |
| 1535.54 | YET TO BE PREPARED | 8 |
| Playgrounds And Parks | 1023.69 | YET TO BE PREPARED |
| 9 | CLUB HOUSE/COMMUNITY CENTRE | 10521.28 |
| Yet To Be Prepared | 10 | SHOPPING AREA |
| 0 | YET TO BE PREPARED | 11 |
| Renewable Energy System | 341.23 | YET TO BE PREPARED |
| 12 | SCHOOL | 0 |
| Yet To Be Prepared | 13 | HOSPITAL/DISPENSARY |
| 0 | YET TO BE PREPARED | 14 |
| Any Other | 0 | YET TO BE PREPARED |
| 15 | STP | 2559.23 |
| Yet To Be Prepared | 16 | UGT |
| 2559.23 | YET TO BE PREPARED | 17 |
| Rwh | 511.85 | YET TO BE PREPARED |
| 18 | ESS | 853.08 |
| Yet To Be Prepared | 5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed. | 19-09-2025 |
| (date) | 6. Date of approval of Building Plans | 19-09-2025 |
| (date) | (i) Details of the plots/apartments in the project: | Sr. No. |
| Plot/ apartment type | Size of the plot/carpet area of the apartments | Total number of plots/apartments in the project |
| Total size of the plots/carpet area of the apartments | Plots/apartments booked/ sold upto the date of application | Yet to be sold/ booked |
| No. of towers to be/ being constructed for booked apartments | 1 | APARTMENT/SHOPS/OTHER BUILDINGS Type 3A (3BHK + SERVANT + UTILITY) |
| 159.994 | 114 | 18239.316 |
| 0 | 0 | 4 |
| 2 | APARTMENT/SHOPS/OTHER BUILDINGS Type 3B (3BHK + SERVANT + UTILITY) | 159.994 |
| 114 | 18239.316 | 0 |
| 0 | 4 | 3 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 4A (4BHK + SERVANT + UTILITY) | 189.875 | 152 |
| 28861 | 0 | 0 |
| 2 | 4 | APARTMENT/SHOPS/OTHER BUILDINGS Type 5A (PENTHOUSE) |
| 290.385 | 3 | 871.155 |
| 0 | 0 | 3 |
| 5 | APARTMENT/SHOPS/OTHER BUILDINGS Type 5B (PENTHOUSE) | 284.763 |
| 3 | 854.289 | 0 |
| 0 | 3 | 6 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 6A (PENTHOUSE) | 347.940 | 4 |
| 1391.76 | 0 | 0 |
| 2 | 7 | APARTMENT/SHOPS/OTHER BUILDINGS Type EWS |
| 18.638 | 80 | 1491.04 |
| 0 | 0 | 1 |
| 8 | APARTMENT/SHOPS/OTHER BUILDINGS Type COMMERCIAL | 3702.115 |
| 49 | 181403.635 | 0 |
| 0 | 1 | Total |
| 519 | 251351.511 | 0 |
| 0 | 20 | (ii) Apartments/Shops/Other Buildings:- |
| (a) Status of construction activities in respect of sold/booked apartments. | Type | Number of apartments booked/ sold |
| Write or Annex the stage of construction of the booked/ sold apartments in folder C | 0 | 0 |
| (b) Time schedule of completion of already booked apartments: | Start Date | 23-10-2023 |
| Earlier date of completion | 23-02-2028 | Revised date of completion |
| 13-06-2030 | (c) Time schedule for development of infrastructure: | Start Date |
| 23-10-2023 | Percentage completion Upto the | date of application |
| 0 | Projected date of completion | 06-11-2029 |
| (d) Provide further details in the proforma REP-I Part-C-X. | (e) Plan of action for completing the Project along with requisite infrastructure. | (iii) Status in respect of plotted colony:- |
| (a) | Plots | Booked/sold |
| Stage of handing over the possession (Write or Annex details) | PLOT | 0 |
| Na | (b) Schedule for development of Infrastructure: | Start Date |
| 23-10-2023 | Percentage completion | 0 |
| Projected date of completion | 06-11-2029 | (c) Provide further details in the proforma REP-I Part-C-X. |
| (d) Schedule of completing the project and handing over possession of the plots. | (iv) Vehicle parkings details of the project- | a) Underground parking |
| 468 | b) Stilt parking | 0 |
| c) Covered parking | 0 | d) Open parking |
| 0 | e) Independent garages | 0 |
| (v) Quarterly schedule of development of whole/remaining part of the project: | (a) Apartments/Shops/Other Buildings | Expenditure incurred till the date of application (In Lakhs) |
| Particulars | Expenditure | Apartments |
| 27323.48 | Shops | 0 |
| Plots | 0 | Expenditure to be made in each quarter (In Lakhs) |
| Particulars | Expenditure to be made in each quarter ( | ) |
| Apr-June | July-Sep | Oct-Dec |
| Jan-Mar | (b) Infrastructure | Expenditure incurred till the date of application (In Lakhs) |
| Particulars | Expenditure | Roads & Pavements |
| 0 | Water Supply System | 0 |
| Sewerage treatment & garbage disposal | 0 | Electricity Supply System |
| 0 | Storm Water Drainage | 0 |
| Parks and Playgrounds | 0 | Clubhouse/community centres |
| 0 | Shopping area | 0 |
| Other | 0 | Expenditure to be made in each quarter (In Lakhs) |
| Particulars | Expenditure to be made in each quarter ( | ) |
| Apr-June | July-Sep | Oct-Dec |
| Jan-Mar | It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented. | Signature of the Applicant / Authorised Representative |
| Stamp _____________ | Date _____________ | FORM REP-I |
| Part - C-X | 1.Financial information: | Particulars |
| Remarks, if any | i. No. of Flats/Apartments constructed | 0 |
| ii. No. of Flats/ Apartments booked | 119 | iii. Total amount sale value of booked Flats, on the date of application/end of last quarter |
| 47364.01 Lakhs | iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter | 13042.94 Lakhs |
| v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter | 34321.08 Lakhs | vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter |
| 833.23466 Lakhs | vii. Amount invested in the project upto the date of application | 25780.12 Lakhs |
| Land cost (If any) | 6283.67 Lakhs | Apartments |
| 10673.08 Lakhs | Infrastructure | 0 Lakhs |
| EDC/ Taxes Etc. | 8823.37 Lakhs | viii. Balance cost to be incurred for completion of the project and delivery of possession |
| 67286.22 Lakhs | (a) In respect of existing allottees | 0 Lakhs |
| (b) In respect of rest of the project | 67286.22 Lakhs | ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project |
| Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C | 12072.00 Lakhs | x. Total liabilities against the project up-to-date. (Annex details in folder C) |
| 79358.22 Lakhs | 2.Additional information: | Particulars |
| Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs) | Actual expenditure incurred upto the date of application. (In Lakhs) | I. INTERNAL ROADS AND PAVEMENTS |
| 682.46 | 0 | II. WATER SUPPLY SYSTEM |
| 1023.69 | 0 | III. STORM WATER DRAINAGE |
| 1194.31 | 0 | IV. ELECTRICITY SUPPLY SYSTEM |
| 1194.31 | 0 | V. SEWAGE TREATMENT & GARBAGE DISPOSAL |
| 1023.69 | 0 | VI. CLUB HOUSE/COMMUNITY CENTRE |
| 10521.28 | 0 | VII. SCHOOL |
| 0 | 0 | VIII. ANY OTHER |
| 7336.46 | 0 | IX. SOLID WASTE COLLECTION & MGMT SYSTEM |
| 0 | 0 | X. CLUBHOUSE |
| 0 | 0 | XI. NEIGHBOURHOOD SHOPPING |
| 0 | 0 | XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC. |
| 1023.69 | 0 | XIII. COVERED PARKING |
| 0 | 0 | XIV. OPEN PARKING |
| 0 | 0 | XV. GARAGES |
| 0 | 0 | XVI. SECURITY SYSTEM |
| 1535.54 | 0 | XVII. OTHER FACILITIES AS PER PROJECT REPORT |
| 0 | 0 | I hereby declare that the above information and particulars are based on record and are true to the |
| best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | FORM REP-I | Part - D |
| Accounts related information: | 1. Annex copy of the balance sheet of last 3 years | Yes |
| 2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D. | Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form. | Yes |
| 3. Bank account to which the deposits received from apartment buyers will be credited | Bank and Branch address | ICICI BANK LIMITED |
| Bank Account number | 739005000512 | IFSC code |
| ICIC0007390 | MICR code | 110229328 |
| Branch code | 7390 | 4. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority) |
| Satish Kumar, Mohit Garg, Vikas Garg , Mayank Garg, Ashok Kumar | 5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details) | ATTACHED |
| I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative |
| Stamp _____________ | Date _____________ | FORM REP-I |
| Part - E | Details of the statutory approvals: | 1. Annex copies of the following in Folder E: |
| i. Lay out Plan | Yes | ii. Demarcation Plan |
| Yes | iii. Zoning Plan | Yes |
| iv. Building Plan | Yes | Site Plan |
| Yes | Floor Plan | Yes |
| Apartment Plans | Yes | Elevation Section |
| Yes | Detail of Permissible FAR | Yes |
| Detail of covered area achieved FAR | Yes | 2. Annex copies of the following in Folder E: |
| I. Roads And Pavement Plan | Yes | II. ELECTRICITY SUPPLY PLAN |
| Yes | III. WATER SUPPLY PLAN | Yes |
| IV. Sewerage And Garbage Disposal Plan | Yes | V. STROM WATER DRAINAGE |
| Yes | VI. 10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITY | No |
| Vii. Street Lighting Plan | Yes | VIII. PARKING PLAN |
| Yes | 3. Statutory Approvals Status | Statutory Approvals |
| Statutory Approvals Status | Date | I. BR III |
| Already Been Obtained | 19-09-2025 | It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees. |
| Signature _____________ | Seal _____________ | Date _____________ |
| Form Rep-I | Part - F | 1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers. |
| Yes | 2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules) | (Annex a copy in Folder F) |
| Yes | 3. Gist of the important provisions of the Draft Agreement | (Annex a copy in Folder F) |
| I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative |
| Stamp _____________ | Date _____________ | FORM REP-I |
| Part - G | Projects launched by the promoter in last five years: | 1. Name and location of the project |
| Ganga Valley, Sector-78, Gurugram | 2. Particulars of the project in brief: | i. Total area of the project |
| 5.00 | ii. Total number of apartments | 0 |
| iii. Total number of plots | 42 | 3. The number of plots/ apartments booked/sold to the allottees: |
| (a) Apartments | 0 | (b) Plots |
| 15 | 4. Details of the expenditure incurred upto date: | Initially estimated cost (In Lakhs) |
| Revised cost (In Lakhs) | Expenditure incurred upto the date of application (In Lakhs) | Total cost of the project |
| (Other than cost of land) | 4938.31 | 4938.31 |
| 951.32 | Cost of the apartments | 0 |
| 0 | 0 | Cost of the infrastructure |
| 814.71 | 814.71 | 275.86 |
| Others costs | 4123.60 | 4123.60 |
| 750.76 | 5. Total amount of money collected from current allottees of the apartments/ plots upto the date of filing this application. | 468.74 Lakhs |
| 6. Remaining amount of sale price money to be collected from the current allottees of the apartments. | 2255.76 Lakhs | 7. Loan sanctioned by the banks/ other financial institutions against the project. |
| 0 Lakhs | 8. Amount drawn from the banks/ other financial institutions till the date of filing this application. | 1820.61 Lakhs |
| 9. Whether any litigation is pending against the Project: | Yes/No | (If yes-give Annex details in folder G) |
| No | 10. Initial date of completion of the project. | 06-03-2026 |
| 11. Likely date of completion of the project. | 06-03-2026 | I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed. |
| Signature of the Applicant / Authorised Representative | Stamp _____________ | Date _____________ |
| Form Rep-I | Part - H | SPECIFICATION OF CONSTRUCTION |
| Specification of apartments and other buildings including the following: | 1 | FLOORING DETAILS OF VARIOUS PARTS OF HOUSE |
| Bedroom-Wooden Flooring, Living Dining And Kitchen -Italian/ Imported Marble, | 2 | WALL FINISHING DETAILS |
| Plastic Emulsion/Acrylic Paint | 3 | KITCHEN DETAILS |
| Wall / Flooring- Italian /Imported Marble Counter-Granite | 4 | BATHROOM FITTINGS |
| Wc Washbasin, Shower With Arm, Basin Mixture, Health Faucet, Angle Valve As Per Market Standard | 5 | WOOD WORK ETC |
| Wooden Door Frames, Shutter, Wordrobes | 6 | DOORS AND WINDOS FRAMES |
| Wooden/Wpc/Alluminium/Upvc | 7 | GLASS WORK |
| Tinted Glass, Performance Glass, Toughed Glass | 8 | ELECTRIC FITTINGS |
| Modular Switches, Boxes, Sockets | 9 | CONDUCTING AND WIRING DETAILS |
| Conduit-25 Mm Heavy And Medium Duty, Wire-1.5 Mm, 2.5 Mm, 4 Mm, 6 Mm | 10 | CUPBOARD DETAILS |
| Wooden Laminated/Veneer/Paint | 11 | WATER STORAGE |
| Na | 12 | LIFT DETAILS |
| Isi Marked As Per Market Standard | 13 | EXTERNAL GLAZINGS |
| Alluminium/Upvc | 13.1 | WINDOWS/GLAZINGS |
| Alluminium/Upvc | 14 | DOORS |
| Wooden Doors, Shutter, Wordrobes | 14.1 | MAIN DOORS |
| Laminated Flushdoor / Veneer | 14.2 | INTERNAL DOORS |
| Laminated Flushdoor | 15 | AIR CONDITIONING |
| As Per Approved Design | 16 | ELECTRICAL FITTINGS |
| Modular Switches, Boxes, Sockets | 17 | CNG PIPE LINE |
| Na | 18 | PROVISION OF WIFI AND BROADBAND FACILITY |
| As Per Market Standard | 19 | EXTERNAL FINISHING/COLOUR SCHEME |
| Texture Paint Or As Per Design | 20 | INTERNAL FINISHING |
| False Ceiling, Walls-Plastic Emusion/Acrylic/Paint Flooring- Italian/ Imported Marble | SPECIFICATION UNIT WISE | 1 . LIVING/DINING/FOYER/FAMILY LOUNGE |
| 1 . 1 | FLOOR | ITALIAN/IMPORTED MARBLE |
| 1 . 2 | WALLS | PLASTIC EMULSION/ACRYLIC PAINT |
| 1 . 3 | CEILING | FALSE CEILING WITH PAINT |
| 2 . Master Bedroom/Dressroom | 2 . 1 | FLOOR |
| Wooden Flooring | 2 . 2 | WALLS |
| Plastic Emulsion/Acrylic Paint | 2 . 3 | CEILING |
| False Ceiling With Paint | 2 . 4 | MODULAR WARDROBES |
| Wooden Laminated/Veneer/Painted | 3 . MASTER TOILET | 3 . 1 |
| Floor | ITALIAN/IMPORTED MARBLE/TILES | 3 . 2 |
| Walls | PLASTIC EMULSION/ACRYLIC PAINT | 3 . 3 |
| Ceiling | FALSE CEILING WITH PAINT | 3 . 4 |
| Counters | GRANITE/MARBLE | 3 . 5 |
| Sanitary Ware/Cp Fittings | ISI MARKED | 3 . 6 |
| Fitting/Fixtures | ISI MARKED | 4 . BED ROOMS |
| 4 . 1 | FLOOR | WOODEN FLOORING |
| 4 . 2 | WALLS | PLASTIC EMULSION/ACRYLIC PAINT |
| 4 . 3 | CEILING | FALSE CEILING WITH PAINT |
| 4 . 4 | WARDROBES | WOODEN LAMINATED/VENEER/PAINTED |
| 5 . Toilet | 5 . 1 | FLOOR |
| Italian/Imported Marble/Tiles | 5 . 2 | WALLS |
| Plastic Emulsion/Acrylic Paint | 5 . 3 | CEILING |
| False Ceiling With Paint | 5 . 4 | COUNTERS |
| Granite/Marble | 5 . 5 | SANITARY WARE/CP FITTINGS |
| Isi Marked | 5 . 6 | FIXTURES |
| Isi Marked | 6 . KITCHEN | 6 . 1 |
| Floor | ITALIAN/IMPORTED MARBLE | 6 . 2 |
| Walls | PLASTIC EMULSION/ACRYLIC PAINT/TILES | 6 . 3 |
| Ceiling | FALSE CEILING WITH PAINT | 6 . 4 |
| Counters | GRANITE/MARBLE | 6 . 5 |
| Fixtures | ISI MARKED | 6 . 6 |
| Kitchen Appliances | ISI MARKED | 7 . UTILITY ROOMS/UTILITY BALCONY/TOILET |
| 7 . 1 | FLOOR | TILES/GRANITE/MARBLE |
| 7 . 2 | WALLS & CEILING | PAINT |
| 7 . 3 | TOILET | FALSE CEILING WITH PAINT |
| 7 . 4 | BALCONY | TILES/GRANITE/MARBLE |
| 8 . Sit-Outs | 8 . 1 | FLOOR |
| Tiles/Granite/Marble | 8 . 2 | WALLS & CEILING |
| Plastic Emulsion/Acrylic Paint/Tiles | 8 . 3 | RAILINGS |
| SS Glass / Ms Railing | 8 . 4 | FIXTURES |
| Isi Marked | I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. |
| Signature of the Applicant / Authorised Representative | Stamp _____________ | Date _____________ |
| List of Uploaded Documents | Sr. No. | Document Description |
| Date of Document Upload | View Document | 1 |
| Copy Of License Along With Schedule Of Land | 07-11-2025 | View Document |
| 2 | A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS | 13-11-2025 |
| View Document | 3 | NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT |
| 10-11-2025 | View Document | 4 |
| Cash Flow Statement Of The Proposed Project | 10-11-2025 | View Document |
| 5 | CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT | 10-11-2025 |
| View Document | 6 | DEMARCATION PLAN |
| 13-11-2025 | View Document | 7 |
| Zoning Plan | 13-11-2025 | View Document |
| 8 | IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN | 13-11-2025 |
| View Document | 9 | IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN |
| 13-11-2025 | View Document | 10 |
| Documents Relating To The Entry Of License And Collaboration Agreement In The Revenue Record | 13-11-2025 | View Document |
| 11 | SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN | 13-11-2025 |
| View Document | 12 | DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. |
| 13-11-2025 | View Document | I hereby declare that the above information and particulars are based on record and are true to the |
| best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
Facilities in the service plan
| Facility | Estimated cost | Status |
|---|---|---|
| Internal Roads And Pavements | ₹ 6.82 Cr | Yet To Be Prepared |
| Water Supply System | ₹ 10.24 Cr | Yet To Be Prepared |
| Storm Water Drainage | ₹ 11.94 Cr | Yet To Be Prepared |
| Electricity Supply System | ₹ 11.94 Cr | Yet To Be Prepared |
| Sewage Treatment & Garbage Disposal | ₹ 10.24 Cr | Yet To Be Prepared |
| Street Lighting | ₹ 5.12 Cr | Yet To Be Prepared |
| Security And Fire Fighting | ₹ 15.36 Cr | Yet To Be Prepared |
| Playgrounds And Parks | ₹ 10.24 Cr | Yet To Be Prepared |
| Club House/Community Centre | ₹ 105.21 Cr | Yet To Be Prepared |
| Renewable Energy System | ₹ 3.41 Cr | Yet To Be Prepared |
| Stp | ₹ 25.59 Cr | Yet To Be Prepared |
| Ugt | ₹ 25.59 Cr | Yet To Be Prepared |
| Rwh | ₹ 5.12 Cr | Yet To Be Prepared |
| Ess | ₹ 8.53 Cr | Yet To Be Prepared |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| Br III | Already Been Obtained | 19 Sep 2025 |
Specifications (as filed)
| Flooring Details Of Various Parts Of House | Bedroom-Wooden Flooring, Living Dining And Kitchen -Italian/ Imported Marble, |
|---|---|
| Wall Finishing Details | Plastic Emulsion/Acrylic Paint |
| Kitchen Details | Wall / Flooring- Italian /Imported Marble Counter-Granite |
| Bathroom Fittings | Wc Washbasin, Shower With Arm, Basin Mixture, Health Faucet, Angle Valve As Per Market Standard |
| Wood Work Etc | Wooden Door Frames, Shutter, Wordrobes |
| Doors And Windos Frames | Wooden/Wpc/Alluminium/Upvc |
| Glass Work | Tinted Glass, Performance Glass, Toughed Glass |
| Electric Fittings | Modular Switches, Boxes, Sockets |
| Conducting And Wiring Details | Conduit-25 Mm Heavy And Medium Duty, Wire-1.5 Mm, 2.5 Mm, 4 Mm, 6 Mm |
| Cupboard Details | Wooden Laminated/Veneer/Paint |
| Lift Details | Isi Marked As Per Market Standard |
| External Glazings | Alluminium/Upvc |
| Windows/Glazings | Alluminium/Upvc |
| Doors | Wooden Doors, Shutter, Wordrobes |
| Main Doors | Laminated Flushdoor / Veneer |
| Internal Doors | Laminated Flushdoor |
| Air Conditioning | As Per Approved Design |
| Electrical Fittings | Modular Switches, Boxes, Sockets |
| Provision Of Wifi And Broadband Facility | As Per Market Standard |
| External Finishing/Colour Scheme | Texture Paint Or As Per Design |
| Internal Finishing | False Ceiling, Walls-Plastic Emusion/Acrylic/Paint Flooring- Italian/ Imported Marble |
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.