806-807, Best Sky Tower, Nsp, Pitampura, New Delhi-110034
CIN
U70100DL2020PTC361825
Site address
Village Sihi, Sector-84,
Sector
Sector 84
Tehsil / District
Gurgaon / Gurugram
Layout plan approved
16 Jun 2023
Building plans approved
19 Oct 2023
Construction start (as filed)
23 Oct 2023
Completion (as filed)
23 Feb 2028
Application submitted
10 Oct 2023
Authority, hearings & orders
Current statusApproved And Certificate Uploaded
Initial scrutinyFirst hearing fixed
Next hearingNot Required
Application submitted online
Application received by HRERA Gurugram
Notice sent to the promoterBy Hand
HearingExamination By AuthorityView order Proceedings
Sh. Ashish Kush, Planning Executive and Ms. Asha, Chartered Accountant briefed about the facts of the case. Sh. Neeraj Mishra, Executive Director of the company and Sh. Ashwani Kumar are present on behalf of the promoter. The AR of the promoter states that building plans have been approved by DTCP and approval letter remain to be signed/issued which shall be submitted within a week. Further, the AR seeks one week time to submit deficit documents. The matter to come up on 23.10.2023.
HearingApproved And Ready For Certificate Issuing ProcessView order Proceedings
Sh. Ashish Kush, Planning Executive and Ms. Asha, Chartered Accountant briefed about the facts of the case. Approved as proposed.
Registration grantedGGM/752/484/2023/96
Certificate uploadedRC Uploaded
Registration valid till
Land, licence & cost
Land area of the project
5.841 acres
Total licensed area
8.344 acres
Licence
Lic. No. 127/ 2023 dated 16.06.2023
FAR permissible / proposed
2.65 / 2.65
Estimated project cost
₹ 930.66 Cr
Cost of land
₹ 62.84 Cr
Cost of construction
₹ 643.81 Cr
Infrastructure and other structures
₹ 110.19 Cr
EDC, taxes, levies and other costs
₹ 113.83 Cr
How the land will be used
Use
Acres
Share
Land Area To Be Used For Construction Of Apartments
0.6178
10.6%
Construction Of Roads
1.3374
22.9%
Pavements
1
17.1%
Parks And Playgrounds
1
17.1%
Green Belts
0.6828
11.7%
Vehicle Parkings
0.48
8.2%
Electricity Sub-Station
0.1051
1.8%
Club House
0.3916
6.7%
Sewage And Solid Waste Treatment Facility
0.226
3.9%
Apartments 362 units · 5 towers
Type
Carpet area (sq m)
Carpet area (sq ft)
Units
Apartment/Shops/Other Buildings
52,902.42
-
362
Areas are as filed with HRERA. Some rows show a total built-up area rather than one home’s carpet area, as entered by the promoter.
External services
Service
Provided by
Approval taken
Roads
No
WATER SUPPLY
HSVP
Yes
ELECTRICITY
DHBVN
Yes
SEWAGE DISPOSAL
HSVP
Yes
STORM WATER DRAINAGE
HSVP
Yes
4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
628.50
YET TO BE PREPARED
2
Water Supply System
434.59
YET TO BE PREPARED
3
STORM WATER DRAINAGE
434.59
Yet To Be Prepared
4
ELECTRICITY SUPPLY SYSTEM
1705.69
YET TO BE PREPARED
5
Sewage Treatment & Garbage Disposal
803.60
YET TO BE PREPARED
6
STREET LIGHTING
179.57
Yet To Be Prepared
7
SECURITY AND FIRE FIGHTING
1518.39
YET TO BE PREPARED
8
Playgrounds And Parks
35.91
YET TO BE PREPARED
9
CLUB HOUSE/COMMUNITY CENTRE
0
Yet To Be Prepared
10
SHOPPING AREA
0
YET TO BE PREPARED
11
Renewable Energy System
48.38
YET TO BE PREPARED
12
SCHOOL
0
Yet To Be Prepared
13
HOSPITAL/DISPENSARY
0
YET TO BE PREPARED
14
Any Other
0
YET TO BE PREPARED
15
UNDERGROUND WATER TANK
355.84
Yet To Be Prepared
16
RAIN WATER HARVESTING
44.58
YET TO BE PREPARED
17
Electrical Sub Station
1363.37
YET TO BE PREPARED
5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.
16-06-2023
(date)
6. Date of approval of Building Plans
19-10-2023
(date)
7. New projects:
i) Likely date of starting the construction work
23-10-2023
ii) Likely date of completing the project
23-02-2028
iii) Sizes of the plots to be offered in the project
Sr. No
Plot Area(In Square Meter)
Number of plots in the project
1
0
0
Total
0
iv. Type of apartments to be constructed in the project:
Type
Carpet area(In Square Meter)
Number of apartments
Number of towers
Apartment/Shops/Other Buildings
52902.421
362
5
(vi) Quarterly schedule of development of whole/remaining part of the project:
(c) Apartments/Shops/Other Buildings
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Apartments
0
Shops
0
Plots
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2023
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
1684
Shops
0
Plots
0
Particulars
Year-2024
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
5512
2498
3804
4576
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2025
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
8074
10346
7304
3700
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2026
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
3142
3568
3640
3728
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
2983.82
947.58
Shops
0
0
Plots
0
0
(d) Infrastructure
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Roads & Pavements
0
Water Supply System
0
Sewerage treatment & garbage disposal
0
Electricity Supply System
0
Storm Water Drainage
0
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2024
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
0
Water Supply System
0
0
0
0
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Particulars
Year-2025
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
0
Water Supply System
0
0
0
0
Sewerage treatment & garbage disposal
0
0
0
93.97
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
STP
19.49
55.19
UGT
19.49
55.19
Particulars
Year-2026
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
0
Water Supply System
0
0
0
0
Sewerage treatment & garbage disposal
215.59
138.20
0
0
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
7.54
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Security and Firefighting
0
0
0
183.87
Ugt
81.00
90.33
76.60
33.22
STP
81.00
90.33
76.60
33.22
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
274.97
353.53
0
0
Water Supply System
91.21
209.25
134.13
0
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
206.55
539.69
632.97
326.48
Storm Water Drainage
0
91.21
209.25
134.13
Parks and Playgrounds
17.29
11.08
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Security and Firefighting
480.43
563.47
290.63
0
Ess
0
286.14
656.44
420.79
RWH
19.50
25.08
0
0
Renewable Energy System
21.17
27.21
0
0
Street Lighting
0
78.56
101.01
0
Particulars
Year-2028
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
0
Water Supply System
0
0
0
0
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
Form Rep-I
Part - D
Accounts related information:
1. Annex copy of the balance sheet of last 3 years
Yes
2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.
Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.
No
3. Bank account to which the deposits received from apartment buyers will be credited
Bank and Branch address
ICICI BANK LIMITED
Bank Account number
739005000512
IFSC code
ICIC0007390
MICR code
110229328
Branch code
7390
4. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)
5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)
ATTACHED
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
FORM REP-I
Part - E
Details of the statutory approvals:
1. Annex copies of the following in Folder E:
i. Lay out Plan
Yes
ii. Demarcation Plan
Yes
iii. Zoning Plan
Yes
iv. Building Plan
Yes
Site Plan
Yes
Floor Plan
Yes
Apartment Plans
Yes
Elevation Section
Yes
Detail of Permissible FAR
No
Detail of covered area achieved FAR
No
2. Annex copies of the following in Folder E:
I. ROADS AND PAVEMENT PLAN
Yes
II. ELECTRICITY SUPPLY PLAN
Yes
III. Water Supply Plan
Yes
IV. SEWERAGE AND GARBAGE DISPOSAL PLAN
Yes
V. STROM WATER DRAINAGE
Yes
Vi. 10% Land To Be Transferred To The Govt. For Community Facility
No
VII. STREET LIGHTING PLAN
Yes
VIII. PARKING PLAN
Yes
3. Statutory Approvals Status
Statutory Approvals
Statutory Approvals Status
Date
I. LICENSE
ALREADY BEEN OBTAINED
16-06-2023
II. WATER SUPPLY ASSURANCE
ALREADY BEEN OBTAINED
11-05-2023
III. BUILDING APPROVAL PLAN
ALREADY BEEN OBTAINED
19-10-2023
It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees.
Signature _____________
Seal _____________
Date _____________
FORM REP-I
Part - F
1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.
(Annex a copy in Folder F)
Yes
2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)
(Annex a copy in Folder F)
Yes
3. Gist of the important provisions of the Draft Agreement
(Annex a copy in Folder F)
As Per Rera Regulations
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
Form Rep-I
Part - G
Projects launched by the promoter in last five years: (No Projects)
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
FORM REP-I
Part - H
Specification Of Construction
Specification of apartments and other buildings including the following:
1
Flooring Details Of Various Parts Of House
BEDROOM-WOODEN FLOORING, LIVING DINING AND KITCHEN -ITALIAN/ IMPORTED MARBLE,
2
Wall Finishing Details
PLASTIC EMULSION/ACRYLIC PAINT
3
Kitchen Details
WALL / FLOORING- ITALIAN /IMPORTED MARBLE
COUNTER-GRANITE
4
BATHROOM FITTINGS
WC WASHBASIN, SHOWER WITH ARM, BASIN MIXTURE, HEALTH FAUCET, ANGLE VALVE AS PER MARKET STANDARD
5
WOOD WORK ETC
WOODEN DOOR FRAMES, SHUTTER, WORDROBES
6
DOORS AND WINDOS FRAMES
WOODEN/WPC/ALLUMINIUM/UPVC
7
GLASS WORK
TINTED GLASS, PERFORMANCE GLASS, TOUGHED GLASS
8
ELECTRIC FITTINGS
MODULAR SWITCHES, BOXES, SOCKETS
9
CONDUCTING AND WIRING DETAILS
CONDUIT-25 MM HEAVY AND MEDIUM DUTY, WIRE-1.5 MM, 2.5 MM, 4 MM, 6 MM
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
List of Uploaded Documents
Sr. No.
Document Description
Date of Document Upload
View Document
1
Certificate From A Chartered Accountant Certifying That The Informstion Provided By The Applicant In Form Rep-1-C-X Is Correct As Per The Books Of Accounts/ Balance Sheet Of The Applicant
10-10-2023
View Document
2
NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT
10-10-2023
View Document
3
CASH FLOW STATEMENT OF THE PROPOSED PROJECT
10-10-2023
View Document
4
Declaration Supported By Affidavit Duly Signed By The Promoter To Be Enclosed.
10-10-2023
View Document
5
DEMARCATION PLAN
10-10-2023
View Document
6
STORM LAYOUT
20-11-2023
View Document
7
Tower 01,04 7TH Floor Plan
20-11-2023
View Document
8
SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN
20-11-2023
View Document
9
ZONING PLAN
20-11-2023
View Document
10
Solid Waste & Sewer Layout
20-11-2023
View Document
11
TOWER 02,03 SECTIONS
20-11-2023
View Document
12
TOWER 01, 04 TERRACE PLAN
20-11-2023
View Document
13
Tower 02,03 Elevations
20-11-2023
View Document
14
SITE PLAN WITH GROUND FLOOR)
20-11-2023
View Document
15
BASEMENT 01
20-11-2023
View Document
16
Tower 01,04 1ST-6TH Floor Plan
20-11-2023
View Document
17
TOWER 02,03 44TH FLOOR PLAN
20-11-2023
View Document
18
IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN
20-11-2023
View Document
19
Affidavit 4(2)(1)(D)
20-11-2023
View Document
20
BR-III
20-11-2023
View Document
21
GREEN AND LANDSCAPE
20-11-2023
View Document
22
Irrigation Layout
20-11-2023
View Document
23
COPY OF LICENSE ALONG WITH SCHEDULE OF LAND
20-11-2023
View Document
24
IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN
20-11-2023
View Document
25
A Complete Set Of The Last Approved Building Plans
20-11-2023
View Document
26
GREEN AREA
20-11-2023
View Document
27
BASEMENT 02
20-11-2023
View Document
28
Tower 01,04 Ground Floor Plan
20-11-2023
View Document
29
TOWER 01,04 ELEVATIONS
20-11-2023
View Document
30
TOWER 01,04 SECTIONS
20-11-2023
View Document
31
Tower 02,03 Ground Floor Plan
20-11-2023
View Document
32
TOWER 02,03 1ST-6TH FLOOR PLAN
20-11-2023
View Document
33
TOWER 02,03 45TH FLOOR PLAN
20-11-2023
View Document
34
Tower 02,03 Typical Floor Plan 02
20-11-2023
View Document
35
WATER SUPPLY LAYOUT
20-11-2023
View Document
36
EWS SECTIONS & ELEVATIONS
20-11-2023
View Document
37
EWS Plans
20-11-2023
View Document
38
TOWER 02,03 TYPICAL FLOOR PLAN 01
20-11-2023
View Document
39
TOWER 02,03 7TH FLOOR PLAN
20-11-2023
View Document
40
Sewer Layout
20-11-2023
View Document
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
Documents Uploaded After Registration
Sr. No.
Document Description
Date of Document Upload
View Document
1
LC- IV Bilaterals
06-10-2026
View Document
2
AAI NOC Sector 84 new
06-10-2026
View Document
3
A to H -2183-2026
06-10-2026
View Document
4
Aks Shijra Sector 84 Nandaka 24-09-2025
06-10-2026
View Document
5
Current Jamabandi Sector 84 Nandaka 24-09-2025
06-10-2026
View Document
6
Current Mutation Sector 84 Nandaka 24-09-2025
06-10-2026
View Document
7
EC (Revised)-Nandaka Ganga Global Homes Private Limited, Haryana
06-10-2026
View Document
8
Fire Scheme Approval GGHPL (8-34375 Acres) REVISED
06-10-2026
View Document
9
LOI, TOD, LC 4946,_Ganga Global Homes Pvt Ltd,_Village Sihi, Sector 84, GGN,_
06-10-2026
View Document
10
NEC Sector 84 16-12-2025
06-10-2026
View Document
11
R3 & 9 - Revised 84 TOD Revised demarcation cum Zoning Plan
06-10-2026
View Document
12
R10 - BR-III (95% & 5%), Ganga Global Sec 84 19-09-2025
Nandaka FIRE (2nd Basement Fire Layout)_compressed
06-10-2026
View Document
41
Nandaka FIRE (Combined Block 5th Floor Plan)_compressed
06-10-2026
View Document
42
Nandaka FIRE (Combined Block Tower Ground Floor Plan)_compressed
06-10-2026
View Document
43
Nandaka FIRE (Commercial Ground, 1st & 2nd Floor Plan)_compressed
06-10-2026
View Document
44
Nandaka FIRE (EWS Ground-4th Floor Plan)_compressed
06-10-2026
View Document
45
Nandaka FIRE (Site Plan with Terrace)_compressed
06-10-2026
View Document
46
Nandaka FIRE (Fire Networking Schematic Diagram)_compressed
06-10-2026
View Document
47
Nandaka FIRE (Tower 01 & 02 Ground Floor Plan)_compressed
06-10-2026
View Document
48
Nandaka FIRE (Tower 01, 04 & 05 Typical Floor Plan)_compressed
06-10-2026
View Document
49
Nandaka FIRE (Tower 02 & 03 Typical Floor Plan)_compressed
06-10-2026
View Document
50
Nandaka FIRE (Tower 03 & 04 Ground Floor Plan)_compressed
06-10-2026
View Document
51
Nandaka FIRE (Tower 05 Ground Floor Plan)_compressed
06-10-2026
View Document
52
Nandaka FIRE (Tower 06 Ground Floor Plan)_compressed
06-10-2026
View Document
53
Nandaka FIRE (UG Fire Tank Layout)_compressed
06-10-2026
View Document
54
Addendum uploaded
07-10-2026
View Document
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
Facilities in the service plan
Facility
Estimated cost
Status
Internal Roads And Pavements
₹ 6.29 Cr
Yet To Be Prepared
Water Supply System
₹ 4.35 Cr
Yet To Be Prepared
Storm Water Drainage
₹ 4.35 Cr
Yet To Be Prepared
Electricity Supply System
₹ 17.06 Cr
Yet To Be Prepared
Sewage Treatment & Garbage Disposal
₹ 8.04 Cr
Yet To Be Prepared
Street Lighting
₹ 1.8 Cr
Yet To Be Prepared
Security And Fire Fighting
₹ 15.18 Cr
Yet To Be Prepared
Playgrounds And Parks
₹ 35.91 lakh
Yet To Be Prepared
Renewable Energy System
₹ 48.38 lakh
Yet To Be Prepared
Underground Water Tank
₹ 3.56 Cr
Yet To Be Prepared
Rain Water Harvesting
₹ 44.58 lakh
Yet To Be Prepared
Electrical Sub Station
₹ 13.63 Cr
Yet To Be Prepared
Statutory approvals
Approval
Status
Date
License
Already Been Obtained
16 Jun 2023
Water Supply Assurance
Already Been Obtained
11 May 2023
Building Approval Plan
Already Been Obtained
19 Oct 2023
Specifications (as filed)
Flooring Details Of Various Parts Of House
Bedroom-Wooden Flooring, Living Dining And Kitchen -Italian/ Imported Marble,
Wall Finishing Details
Plastic Emulsion/Acrylic Paint
Kitchen Details
Wall / Flooring- Italian /Imported Marble
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Nandaka?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.