Registration validHRERA Gurugram

Nandaka

by Ganga Global Homes Private Limited · Village Sihi, Sector-84,

RERA registration
GGM/752/484/2023/96
Registered on
23 Oct 2023
Valid till
23 Feb 2028
Project ID
RERA-GRG-1452-2023
Land area
5.841 acres
Apartments
362 in 5 towers
Completion (as filed)
23 Feb 2028
Estimated cost
₹ 930.66 Cr

RERA registration

Registration certificateGGM/752/484/2023/96, dated 23 Oct 2023
Registration valid till23 Feb 2028
Project IDRERA-GRG-1452-2023
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameNandaka
PromoterGanga Global Homes Private Limited
Promoter’s registered office806-807, Best Sky Tower, Nsp, Pitampura, New Delhi-110034
CINU70100DL2020PTC361825
Site addressVillage Sihi, Sector-84,
SectorSector 84
Tehsil / DistrictGurgaon / Gurugram
Layout plan approved16 Jun 2023
Building plans approved19 Oct 2023
Construction start (as filed)23 Oct 2023
Completion (as filed)23 Feb 2028
Application submitted10 Oct 2023

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Initial scrutinyFirst hearing fixed
Next hearingNot Required
  1. Application submitted online
  2. Application received by HRERA Gurugram
  3. Notice sent to the promoter By Hand
  1. Hearing Examination By Authority View order
    Proceedings

    Sh. Ashish Kush, Planning Executive and Ms. Asha, Chartered Accountant briefed about the facts of the case. Sh. Neeraj Mishra, Executive Director of the company and Sh. Ashwani Kumar are present on behalf of the promoter. The AR of the promoter states that building plans have been approved by DTCP and approval letter remain to be signed/issued which shall be submitted within a week. Further, the AR seeks one week time to submit deficit documents. The matter to come up on 23.10.2023.

  2. Hearing Approved And Ready For Certificate Issuing Process View order
    Proceedings

    Sh. Ashish Kush, Planning Executive and Ms. Asha, Chartered Accountant briefed about the facts of the case. Approved as proposed.

  3. Registration granted GGM/752/484/2023/96
  1. Certificate uploaded RC Uploaded
  2. Registration valid till

Land, licence & cost

Land area of the project5.841 acres
Total licensed area8.344 acres
LicenceLic. No. 127/ 2023 dated 16.06.2023
FAR permissible / proposed2.65 / 2.65
Estimated project cost₹ 930.66 Cr
Cost of land₹ 62.84 Cr
Cost of construction₹ 643.81 Cr
Infrastructure and other structures₹ 110.19 Cr
EDC, taxes, levies and other costs₹ 113.83 Cr

How the land will be used

UseAcresShare
Land Area To Be Used For Construction Of Apartments0.617810.6%
Construction Of Roads1.337422.9%
Pavements117.1%
Parks And Playgrounds117.1%
Green Belts0.682811.7%
Vehicle Parkings0.488.2%
Electricity Sub-Station0.10511.8%
Club House0.39166.7%
Sewage And Solid Waste Treatment Facility0.2263.9%

Apartments 362 units · 5 towers

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings52,902.42-362

Areas are as filed with HRERA. Some rows show a total built-up area rather than one home’s carpet area, as entered by the promoter.

External services

ServiceProvided byApproval taken
RoadsNoWATER SUPPLY
HSVPYesELECTRICITY
DHBVNYesSEWAGE DISPOSAL
HSVPYesSTORM WATER DRAINAGE
HSVPYes4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:
Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)1INTERNAL ROADS AND PAVEMENTS
628.50YET TO BE PREPARED2
Water Supply System434.59YET TO BE PREPARED
3STORM WATER DRAINAGE434.59
Yet To Be Prepared4ELECTRICITY SUPPLY SYSTEM
1705.69YET TO BE PREPARED5
Sewage Treatment & Garbage Disposal803.60YET TO BE PREPARED
6STREET LIGHTING179.57
Yet To Be Prepared7SECURITY AND FIRE FIGHTING
1518.39YET TO BE PREPARED8
Playgrounds And Parks35.91YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE0
Yet To Be Prepared10SHOPPING AREA
0YET TO BE PREPARED11
Renewable Energy System48.38YET TO BE PREPARED
12SCHOOL0
Yet To Be Prepared13HOSPITAL/DISPENSARY
0YET TO BE PREPARED14
Any Other0YET TO BE PREPARED
15UNDERGROUND WATER TANK355.84
Yet To Be Prepared16RAIN WATER HARVESTING
44.58YET TO BE PREPARED17
Electrical Sub Station1363.37YET TO BE PREPARED
5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.16-06-2023(date)
6. Date of approval of Building Plans19-10-2023(date)
7. New projects:i) Likely date of starting the construction work23-10-2023
ii) Likely date of completing the project23-02-2028iii) Sizes of the plots to be offered in the project
Sr. NoPlot Area(In Square Meter)Number of plots in the project
100
Total0iv. Type of apartments to be constructed in the project:
TypeCarpet area(In Square Meter)Number of apartments
Number of towersApartment/Shops/Other Buildings52902.421
3625(vi) Quarterly schedule of development of whole/remaining part of the project:
(c) Apartments/Shops/Other BuildingsExpenditure incurred till the date of application (In Lakhs)Particulars
ExpenditureApartments0
Shops0Plots
0Expenditure to be made in each quarter (In Lakhs)Particulars
Year-2023Jan-MarApr-June
July-SepOct-DecApartments
1684Shops0
Plots0Particulars
Year-2024Jan-MarApr-June
July-SepOct-DecApartments
551224983804
4576Shops0
000
Plots00
00Particulars
Year-2025Jan-MarApr-June
July-SepOct-DecApartments
8074103467304
3700Shops0
000
Plots00
00Particulars
Year-2026Jan-MarApr-June
July-SepOct-DecApartments
314235683640
3728Shops0
000
Plots00
00Particulars
Year-2027Jan-MarApr-June
July-SepOct-DecApartments
2983.82947.58Shops
00Plots
00(d) Infrastructure
Expenditure incurred till the date of application (In Lakhs)ParticularsExpenditure
Roads & Pavements0Water Supply System
0Sewerage treatment & garbage disposal0
Electricity Supply System0Storm Water Drainage
0Parks and Playgrounds0
Clubhouse/community centres0Shopping area
0Other0
Expenditure to be made in each quarter (In Lakhs)ParticularsYear-2024
Jan-MarApr-JuneJuly-Sep
Oct-DecRoads & Pavements0
000
Water Supply System00
00Sewerage treatment & garbage disposal
000
0Electricity Supply System0
000
Storm Water Drainage00
00Parks and Playgrounds
000
0Clubhouse/community centres0
000
Shopping area00
00Other
000
0ParticularsYear-2025
Jan-MarApr-JuneJuly-Sep
Oct-DecRoads & Pavements0
000
Water Supply System00
00Sewerage treatment & garbage disposal
000
93.97Electricity Supply System0
000
Storm Water Drainage00
00Parks and Playgrounds
000
0Clubhouse/community centres0
000
Shopping area00
00Other
000
0STP19.49
55.19UGT19.49
55.19ParticularsYear-2026
Jan-MarApr-JuneJuly-Sep
Oct-DecRoads & Pavements0
000
Water Supply System00
00Sewerage treatment & garbage disposal
215.59138.200
0Electricity Supply System0
000
Storm Water Drainage00
00Parks and Playgrounds
000
7.54Clubhouse/community centres0
000
Shopping area00
00Other
000
0Security and Firefighting0
00183.87
Ugt81.0090.33
76.6033.22STP
81.0090.3376.60
33.22ParticularsYear-2027
Jan-MarApr-JuneJuly-Sep
Oct-DecRoads & Pavements274.97
353.5300
Water Supply System91.21209.25
134.130Sewerage treatment & garbage disposal
000
0Electricity Supply System206.55
539.69632.97326.48
Storm Water Drainage091.21
209.25134.13Parks and Playgrounds
17.2911.080
0Clubhouse/community centres0
000
Shopping area00
00Other
000
0Security and Firefighting480.43
563.47290.630
Ess0286.14
656.44420.79RWH
19.5025.080
0Renewable Energy System21.17
27.2100
Street Lighting078.56
101.010Particulars
Year-2028Jan-MarApr-June
July-SepOct-DecRoads & Pavements
000
0Water Supply System0
000
Sewerage treatment & garbage disposal00
00Electricity Supply System
000
0Storm Water Drainage0
000
Parks and Playgrounds00
00Clubhouse/community centres
000
0Shopping area0
000
Other00
00It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - DAccounts related information:
1. Annex copy of the balance sheet of last 3 yearsYes2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.
Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No3. Bank account to which the deposits received from apartment buyers will be credited
Bank and Branch addressICICI BANK LIMITEDBank Account number
739005000512IFSC codeICIC0007390
MICR code110229328Branch code
73904. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)SATISH KUMAR, MOHIT GARG, VIKAS GARG , MAYANK GARG, ASHOK KUMAR
5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)ATTACHEDI hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - E
Details of the statutory approvals:1. Annex copies of the following in Folder E:i. Lay out Plan
Yesii. Demarcation PlanYes
iii. Zoning PlanYesiv. Building Plan
YesSite PlanYes
Floor PlanYesApartment Plans
YesElevation SectionYes
Detail of Permissible FARNoDetail of covered area achieved FAR
No2. Annex copies of the following in Folder E:I. ROADS AND PAVEMENT PLAN
YesII. ELECTRICITY SUPPLY PLANYes
III. Water Supply PlanYesIV. SEWERAGE AND GARBAGE DISPOSAL PLAN
YesV. STROM WATER DRAINAGEYes
Vi. 10% Land To Be Transferred To The Govt. For Community FacilityNoVII. STREET LIGHTING PLAN
YesVIII. PARKING PLANYes
3. Statutory Approvals StatusStatutory ApprovalsStatutory Approvals Status
DateI. LICENSEALREADY BEEN OBTAINED
16-06-2023II. WATER SUPPLY ASSURANCEALREADY BEEN OBTAINED
11-05-2023III. BUILDING APPROVAL PLANALREADY BEEN OBTAINED
19-10-2023It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees.Signature _____________
Seal _____________Date _____________FORM REP-I
Part - F1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.(Annex a copy in Folder F)
Yes2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)(Annex a copy in Folder F)
Yes3. Gist of the important provisions of the Draft Agreement(Annex a copy in Folder F)
As Per Rera RegulationsI hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - GProjects launched by the promoter in last five years: (No Projects)
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - H
Specification Of ConstructionSpecification of apartments and other buildings including the following:1
Flooring Details Of Various Parts Of HouseBEDROOM-WOODEN FLOORING, LIVING DINING AND KITCHEN -ITALIAN/ IMPORTED MARBLE,2
Wall Finishing DetailsPLASTIC EMULSION/ACRYLIC PAINT3
Kitchen DetailsWALL / FLOORING- ITALIAN /IMPORTED MARBLECOUNTER-GRANITE
4BATHROOM FITTINGSWC WASHBASIN, SHOWER WITH ARM, BASIN MIXTURE, HEALTH FAUCET, ANGLE VALVE AS PER MARKET STANDARD
5WOOD WORK ETCWOODEN DOOR FRAMES, SHUTTER, WORDROBES
6DOORS AND WINDOS FRAMESWOODEN/WPC/ALLUMINIUM/UPVC
7GLASS WORKTINTED GLASS, PERFORMANCE GLASS, TOUGHED GLASS
8ELECTRIC FITTINGSMODULAR SWITCHES, BOXES, SOCKETS
9CONDUCTING AND WIRING DETAILSCONDUIT-25 MM HEAVY AND MEDIUM DUTY, WIRE-1.5 MM, 2.5 MM, 4 MM, 6 MM
10CUPBOARD DETAILSWOODEN LAMINATED/VENEER/PAINT
11WATER STORAGENA
12LIFT DETAILSISI MARKED AS PER MARKET STANDARD
13EXTERNAL GLAZINGSALLUMINIUM/UPVC
13.1WINDOWS/GLAZINGSALLUMINIUM/UPVC
14DOORSWOODEN DOORS, SHUTTER, WORDROBES
14.1MAIN DOORSLAMINATED FLUSHDOOR / VENEER
14.2INTERNAL DOORSLAMINATED FLUSHDOOR
15AIR CONDITIONINGAS PER APPROVED DESIGN
16ELECTRICAL FITTINGSMODULAR SWITCHES, BOXES, SOCKETS
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYAS PER MARKET STANDARD
19EXTERNAL FINISHING/COLOUR SCHEMETEXTURE PAINT OR AS PER DESIGN
20INTERNAL FINISHINGFALSE CEILING, WALLS-PLASTIC EMUSION/ACRYLIC/PAINT
Flooring- Italian/ Imported MarbleSPECIFICATION UNIT WISE1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1FLOORITALIAN/IMPORTED MARBLE
1 . 2WALLSPLASTIC EMULSION/ACRYLIC PAINT
1 . 3CEILINGFALSE CEILING WITH PAINT
2 . Master Bedroom/Dressroom2 . 1FLOOR
Wooden Flooring2 . 2WALLS
Plastic Emulsion/Acrylic Paint2 . 3CEILING
False Ceiling With Paint2 . 4MODULAR WARDROBES
Wooden Laminated/Veneer/Painted3 . MASTER TOILET3 . 1
FloorITALIAN/IMPORTED MARBLE/TILES3 . 2
WallsPLASTIC EMULSION/ACRYLIC PAINT3 . 3
CeilingFALSE CEILING WITH PAINT3 . 4
CountersGRANITE/MARBLE3 . 5
Sanitary Ware/Cp FittingsISI MARKED3 . 6
Fitting/FixturesISI MARKED4 . BED ROOMS
4 . 1FLOORWOODEN FLOORING
4 . 2WALLSPLASTIC EMULSION/ACRYLIC PAINT
4 . 3CEILINGFALSE CEILING WITH PAINT
4 . 4WARDROBESWOODEN LAMINATED/VENEER/PAINTED
5 . Toilet5 . 1FLOOR
Italian/Imported Marble/Tiles5 . 2WALLS
Plastic Emulsion/Acrylic Paint5 . 3CEILING
False Ceiling With Paint5 . 4COUNTERS
Granite/Marble5 . 5SANITARY WARE/CP FITTINGS
Isi Marked5 . 6FIXTURES
Isi Marked6 . KITCHEN6 . 1
FloorITALIAN/IMPORTED MARBLE6 . 2
WallsPLASTIC EMULSION/ACRYLIC PAINT/TILES6 . 3
CeilingFALSE CEILING WITH PAINT6 . 4
CountersGRANITE/MARBLE6 . 5
FixturesISI MARKED6 . 6
Kitchen AppliancesISI MARKED7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1FLOORTILES/GRANITE/MARBLE
7 . 2WALLS & CEILINGPAINT
7 . 3TOILETFALSE CEILING WITH PAINT
7 . 4BALCONYTILES/GRANITE/MARBLE
8 . Sit-Outs8 . 1FLOOR
Tiles/Granite/Marble8 . 2WALLS & CEILING
Plastic Emulsion/Acrylic Paint/Tiles8 . 3RAILINGS
SS Glass / Ms Railing8 . 4FIXTURES
Isi MarkedI hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
List of Uploaded DocumentsSr. No.Document Description
Date of Document UploadView Document1
Certificate From A Chartered Accountant Certifying That The Informstion Provided By The Applicant In Form Rep-1-C-X Is Correct As Per The Books Of Accounts/ Balance Sheet Of The Applicant10-10-2023View Document
2NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT10-10-2023
View Document3CASH FLOW STATEMENT OF THE PROPOSED PROJECT
10-10-2023View Document4
Declaration Supported By Affidavit Duly Signed By The Promoter To Be Enclosed.10-10-2023View Document
5DEMARCATION PLAN10-10-2023
View Document6STORM LAYOUT
20-11-2023View Document7
Tower 01,04 7TH Floor Plan20-11-2023View Document
8SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN20-11-2023
View Document9ZONING PLAN
20-11-2023View Document10
Solid Waste & Sewer Layout20-11-2023View Document
11TOWER 02,03 SECTIONS20-11-2023
View Document12TOWER 01, 04 TERRACE PLAN
20-11-2023View Document13
Tower 02,03 Elevations20-11-2023View Document
14SITE PLAN WITH GROUND FLOOR)20-11-2023
View Document15BASEMENT 01
20-11-2023View Document16
Tower 01,04 1ST-6TH Floor Plan20-11-2023View Document
17TOWER 02,03 44TH FLOOR PLAN20-11-2023
View Document18IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN
20-11-2023View Document19
Affidavit 4(2)(1)(D)20-11-2023View Document
20BR-III20-11-2023
View Document21GREEN AND LANDSCAPE
20-11-2023View Document22
Irrigation Layout20-11-2023View Document
23COPY OF LICENSE ALONG WITH SCHEDULE OF LAND20-11-2023
View Document24IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN
20-11-2023View Document25
A Complete Set Of The Last Approved Building Plans20-11-2023View Document
26GREEN AREA20-11-2023
View Document27BASEMENT 02
20-11-2023View Document28
Tower 01,04 Ground Floor Plan20-11-2023View Document
29TOWER 01,04 ELEVATIONS20-11-2023
View Document30TOWER 01,04 SECTIONS
20-11-2023View Document31
Tower 02,03 Ground Floor Plan20-11-2023View Document
32TOWER 02,03 1ST-6TH FLOOR PLAN20-11-2023
View Document33TOWER 02,03 45TH FLOOR PLAN
20-11-2023View Document34
Tower 02,03 Typical Floor Plan 0220-11-2023View Document
35WATER SUPPLY LAYOUT20-11-2023
View Document36EWS SECTIONS & ELEVATIONS
20-11-2023View Document37
EWS Plans20-11-2023View Document
38TOWER 02,03 TYPICAL FLOOR PLAN 0120-11-2023
View Document39TOWER 02,03 7TH FLOOR PLAN
20-11-2023View Document40
Sewer Layout20-11-2023View Document
I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________Documents Uploaded After Registration
Sr. No.Document DescriptionDate of Document Upload
View Document1LC- IV Bilaterals
06-10-2026View Document2
AAI NOC Sector 84 new06-10-2026View Document
3A to H -2183-202606-10-2026
View Document4Aks Shijra Sector 84 Nandaka 24-09-2025
06-10-2026View Document5
Current Jamabandi Sector 84 Nandaka 24-09-202506-10-2026View Document
6Current Mutation Sector 84 Nandaka 24-09-202506-10-2026
View Document7EC (Revised)-Nandaka Ganga Global Homes Private Limited, Haryana
06-10-2026View Document8
Fire Scheme Approval GGHPL (8-34375 Acres) REVISED06-10-2026View Document
9LOI, TOD, LC 4946,_Ganga Global Homes Pvt Ltd,_Village Sihi, Sector 84, GGN,_06-10-2026
View Document10NEC Sector 84 16-12-2025
06-10-2026View Document11
R3 & 9 - Revised 84 TOD Revised demarcation cum Zoning Plan06-10-2026View Document
12R10 - BR-III (95% & 5%), Ganga Global Sec 84 19-09-202506-10-2026
View Document13R11 - REP-II
06-10-2026View Document14
TSR Sector 8406-10-2026View Document
15Nandaka (Basement 01 Plan)_compressed06-10-2026
View Document16Nandaka (Basement 02 Plan)_compressed
06-10-2026View Document17
Nandaka (Combined Block - 1st Floor Plan)_compressed06-10-2026View Document
18Nandaka (Combined Block - 2nd & 3rd Floor Plan)_compressed06-10-2026
View Document19Nandaka (Combined Block - Club level Plan)_compressed
06-10-2026View Document20
Nandaka (Combined Block - Ground Floor Plan)_compressed06-10-2026View Document
21Nandaka FIRE (1st Basement Fire Layout)_compressed06-10-2026
View Document22Nandaka (Commercial - Ground, 1st & 2nd Floor Plan)_compressed
06-10-2026View Document23
Nandaka (Commercial - Terrace Plan, Sections & Elevations)_compressed06-10-2026View Document
24Nandaka (EWS - Ground Floor Plan & Section)_compressed06-10-2026
View Document25Nandaka (EWS - Typical Floor Plan)_compressed
06-10-2026View Document26
Nandaka (Tower 01, 04 - Typical Floor Plan)_compressed06-10-2026View Document
27Nandaka (Tower 01, 04, 05 - 44th Floor Plan)_compressed06-10-2026
View Document28Nandaka (Tower 01, 04, 05 - 45th Floor Plan)_compressed
06-10-2026View Document29
Nandaka (Tower 01, 04, 05 - Carpet Area 3A & 3B)_compressed06-10-2026View Document
30Nandaka FIRE (Tower 06 Typical Floor Plan)_compressed06-10-2026
View Document31Nandaka (Tower 01, 04, 05 - Sections)_compressed
06-10-2026View Document32
Nandaka (Tower 02, 03 - 44th Floor Plan)_compressed06-10-2026View Document
33Nandaka (Tower 02, 03 - 45th Floor Plan)_compressed06-10-2026
View Document34Nandaka (Tower 02, 03 - Elevations)_compressed
06-10-2026View Document35
Nandaka (Tower 02, 03 - Typical Floor Plan)_compressed06-10-2026View Document
36Nandaka (Tower 05 - Typical Floor Plan)_compressed06-10-2026
View Document37Nandaka (Tower 06 - Sections & Elevations)_compressed
06-10-2026View Document38
Nandaka (Tower 06 - Typical Floor Plan)_compressed06-10-2026View Document
39R 4 & 8 - Nandaka (Site Plan )_compressed06-10-2026
View Document40Nandaka FIRE (2nd Basement Fire Layout)_compressed
06-10-2026View Document41
Nandaka FIRE (Combined Block 5th Floor Plan)_compressed06-10-2026View Document
42Nandaka FIRE (Combined Block Tower Ground Floor Plan)_compressed06-10-2026
View Document43Nandaka FIRE (Commercial Ground, 1st & 2nd Floor Plan)_compressed
06-10-2026View Document44
Nandaka FIRE (EWS Ground-4th Floor Plan)_compressed06-10-2026View Document
45Nandaka FIRE (Site Plan with Terrace)_compressed06-10-2026
View Document46Nandaka FIRE (Fire Networking Schematic Diagram)_compressed
06-10-2026View Document47
Nandaka FIRE (Tower 01 & 02 Ground Floor Plan)_compressed06-10-2026View Document
48Nandaka FIRE (Tower 01, 04 & 05 Typical Floor Plan)_compressed06-10-2026
View Document49Nandaka FIRE (Tower 02 & 03 Typical Floor Plan)_compressed
06-10-2026View Document50
Nandaka FIRE (Tower 03 & 04 Ground Floor Plan)_compressed06-10-2026View Document
51Nandaka FIRE (Tower 05 Ground Floor Plan)_compressed06-10-2026
View Document52Nandaka FIRE (Tower 06 Ground Floor Plan)_compressed
06-10-2026View Document53
Nandaka FIRE (UG Fire Tank Layout)_compressed06-10-2026View Document
54Addendum uploaded07-10-2026
View DocumentI hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 6.29 CrYet To Be Prepared
Water Supply System₹ 4.35 CrYet To Be Prepared
Storm Water Drainage₹ 4.35 CrYet To Be Prepared
Electricity Supply System₹ 17.06 CrYet To Be Prepared
Sewage Treatment & Garbage Disposal₹ 8.04 CrYet To Be Prepared
Street Lighting₹ 1.8 CrYet To Be Prepared
Security And Fire Fighting₹ 15.18 CrYet To Be Prepared
Playgrounds And Parks₹ 35.91 lakhYet To Be Prepared
Renewable Energy System₹ 48.38 lakhYet To Be Prepared
Underground Water Tank₹ 3.56 CrYet To Be Prepared
Rain Water Harvesting₹ 44.58 lakhYet To Be Prepared
Electrical Sub Station₹ 13.63 CrYet To Be Prepared

Statutory approvals

ApprovalStatusDate
LicenseAlready Been Obtained16 Jun 2023
Water Supply AssuranceAlready Been Obtained11 May 2023
Building Approval PlanAlready Been Obtained19 Oct 2023

Specifications (as filed)

Flooring Details Of Various Parts Of HouseBedroom-Wooden Flooring, Living Dining And Kitchen -Italian/ Imported Marble,
Wall Finishing DetailsPlastic Emulsion/Acrylic Paint
Kitchen DetailsWall / Flooring- Italian /Imported Marble

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Nandaka?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.