M3M Soulitude 2
by Aawam Residency Private Limited · Sector-89, Gurugram, Haryana
- RERA registration
- GGM/859/591/2024/86
- Registered on
- 12 Aug 2024
- Valid till
- 3 Apr 2027
- Project ID
- RERA-GRG-1309-2023
- Land area
- 6.638 acres
- Apartments
- 658
- Completion (as filed)
- 3 Apr 2027
- Estimated cost
- ₹ 522.56 Cr
RERA registration
| Registration certificate | GGM/859/591/2024/86, dated 12 Aug 2024 |
|---|---|
| Registration valid till | 3 Apr 2027 |
| Project ID | RERA-GRG-1309-2023 |
| Authority | HRERA Gurugram |
| Project type (as filed) | New |
| Project name | M3M Soulitude 2 |
| Promoter | Aawam Residency Private Limited |
| Promoter’s registered office | 41TH Floor, Tower-1, M3M International Financuial Center Sector -66 |
| CIN | U70109HR2020PTC091883 |
| Site address | Sector-89, Gurugram, Haryana |
| Sector | Sector 89 |
| Tehsil / District | Harsaru St / Gurugram |
| Layout plan approved | 27 Jul 2022 |
| Building plans approved | 3 Apr 2024 |
| Construction start (as filed) | 3 Apr 2024 |
| Completion (as filed) | 3 Apr 2027 |
| Application submitted | 13 Jun 2024 |
Authority, hearings & orders
- Application submitted online
- Application received by HRERA Gurugram
- Notice sent to the promoter By hand
-
Hearing
Examination By Authority View order
Proceedings
The matter is adjourned and to come up on 22.07.2024.
-
Hearing
Adjournment View order
Proceedings
Sh. Shashank Sharma, Associate Engineer Executive and Sh. Ashish Dubey, Chartered Accountant briefed about the facts of the case. Sh. Abhijeet Singh (AR), Sh. Manik Sharma (AR) and Sh. Bharat Vigmal (AR) are present on behalf of the promoter and states that approval of revised building plan with provision of Stilt + 4 Floors is under consideration of the department and copies of approved plan along with the fees in lieu of increased FAR shall be submitted within one week. Further no 3rd party right in respect of the any of the unit in the above project has been created. The matter to come up on 05.08.2024.
-
Hearing
Adjournment View order
Proceedings
The matter is adjourned and to come up on 23.08.2024.
-
Hearing
Approved And Ready For Certificate Issuing Process
Proceedings
Sh. Shashank Sharma, Associate Engineer Executive and Sh. Ashish Dubey, Chartered Accountant briefed about the facts of the case. Sh. Abhijeet Singh (AR), Sh. Manik Sharma (AR) and Sh. Bharat Vigmal (AR) are present on behalf of the promoter and states that DTCP vide order bearing memo no CCD-123/2024/24921-24 dated 06.08.2024 with directions to keep approval of S+4 floors in residential plots on hold in view of deliberations held in CM No 11909 of 2024 in CWP No. 9115 of 2021. Therefore, in view of the same, he wishes to proceed with the registration of S + 3 floors only as already applied. The promoter has applied for registration of 630 floors on 210 residential plots along with 3 commercial blocks. Further, regarding fire scheme of commercial plot no. 1, the AR of the promoter stated that, the size of the plot 1 is 211.50 sqmtr which is less than 500 sqmtr and they don’t require the fire scheme approval as per the clause no. 18(2)(b)(vi) of Haryana Fire and Emergency Services Bill, 2022(Act no 14 of 2022). The promoter has already submitted the written consent of 1321 allottees out of 1955 existing allottees which is 67.57% i.e., more than 2/3rd of total number of allottees for changes in respect of revisions in approved layout plan of 52.2750 acres registered vide RC no 68 of 2021 and the public notice was also published in two prominent newspapers i.e., The Tribune and Dainik Tribune dated 17.07.2024 for inviting objections with respect to the revisions in layout plan against which no objections had been received in the Authority. So, keeping in view of the above peculiar facts, approved as proposed subject to rectification in form A-H and DPI.
- Registration granted GGM/859/591/2024/86
- Certificate uploaded RC uploaded
- Registration valid till
Land, licence & cost
| Land area of the project | 6.638 acres |
|---|---|
| Total licensed area | 57.4 acres |
| Licence | License No- 102 of 2022 dated 27.07.2022 |
| FAR permissible / proposed | 2 / 2 |
| Estimated project cost | ₹ 522.56 Cr |
| Cost of land | ₹ 40.19 Cr |
| Cost of construction | ₹ 325.09 Cr |
| EDC, taxes, levies and other costs | ₹ 157.28 Cr |
How the land will be used
| Use | Sq m | Share |
|---|---|---|
| Land Area To Be Used For Construction Of Apartments | 26,863.87 | 100% |
Apartments 658 units
| Type | Carpet area (sq m) | Carpet area (sq ft) | Units |
|---|---|---|---|
| Apartment/Shops/Other Buildings | 509,263.00 | - | 658 |
Areas are as filed with HRERA. Some rows show a total built-up area rather than one home’s carpet area, as entered by the promoter.
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | GMDA | Yes |
| Water Supply | GMDA | Yes |
| Electricity | DHBVN | Yes |
| Sewage Disposal | GMDA | Yes |
| Storm Water Drainage | GMDA | Yes |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| License Approval | Already Been Obtained | 27 Jul 2022 |
| License Approval | Already Been Obtained | 3 Jul 2021 |
| Forest Noc | Already Been Obtained | 24 Mar 2021 |
| Aravalli Noc | Already Been Obtained | 13 Apr 2021 |
Specifications (as filed)
| Flooring Details Of Various Parts Of House | Vitrified Tile / Laminated Wooden Flooring / Ceramic Tile |
|---|---|
| Wall Finishing Details | Plaster With Paint |
| Kitchen Details | Granite Counter With SS Sink |
| Bathroom Fittings | As Per Approved Make |
| Doors And Windos Frames | Hardwood Door Frame With Laminated Flush/Wooden Door |
| Electric Fittings | As Per Approved Make |
| Conducting And Wiring Details | As Per Approved Make |
| Water Storage | As Per Norms |
| Lift Details | 4 To 6 Passenger Lifts As Per Norms |
| Windows/Glazings | Aluminium Glazing / Upvc Glazing |
| Main Doors | Hardwood Door Frame With Laminated Flush Door |
| Internal Doors | Hardwood Door Frame With Laminated Wooden Door |
| Air Conditioning | Provision (Electrical And Drain Only) |
| Electrical Fittings | As Per Approved Make |
| External Finishing/Colour Scheme | Provision (Electrical And Drain Only) |
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.




Questions about M3M Soulitude 2?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.