Registration validHRERA Gurugram

M3M Golf Hills Phase 1

by Loon Land Development Limited · Sector 79/ 79B

RERA registration
GGM/704/436/2023/48
Registered on
29 Mar 2023
Valid till
28 Feb 2031
Project ID
RERA-GRG-1331-2023
Land area
20.044 acres
Apartments
1,309 in 11 towers
Completion (as filed)
28 Feb 2031
Estimated cost
₹ 1,494.43 Cr

RERA registration

Registration certificateGGM/704/436/2023/48, dated 29 Mar 2023
Registration valid till28 Feb 2031
Project IDRERA-GRG-1331-2023
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameM3M Golf Hills Phase 1
PromoterLoon Land Development Limited
Promoter’s registered officeOffice No. 1221-A, Devika Tower, 12TH Floor, 6, Nehru Place, New Delhi Dl 110019 In
CINU70109DL2014PLC267465
Site addressSector 79/ 79B
SectorSector 79
Tehsil / DistrictManesar / Gurugram
Layout plan approved13 Mar 2023
Building plans approved13 Mar 2023
Construction start (as filed)1 Jul 2023
Completion (as filed)28 Feb 2031
Application submitted14 Mar 2023

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Initial scrutinyFirst Hearing
Next hearingNot Required
  1. Application submitted online
  2. Notice sent to the promoter By Hand
  3. Hearing Examination By Authority View order
    Proceedings

    Sh. Ashish Kush, Planning Executive and Ms. Asha, Chartered Accountant briefed about the facts of the case. Sh. Abhijeet Singh (AR), Sh. Bharat Vigmal (AR) and Sh. Manik Sharma (AR) are present on behalf of the promoter. The AR submits that the detailed reply along with deficit documents have been submitted in the Authority today. Further the AR requests for allowing the change in the name of the project and shall be filing and application for the same along with amended forms and requisite documents. The office to examine the above in light of documents submitted along with the application for change in the name of the project. The matter to come up on 27.03.2023.

  1. Hearing Adjournment
    Proceedings

    The matter is adjourned to 29.03.2023.

  2. Hearing Approved And Ready For Certificate Issuing Process View order
    Proceedings

    Approved as proposed.

  3. Registration granted GGM/704/436/2023/48
  1. Certificate uploaded RC Uploaded
  2. Registration valid till

Land, licence & cost

Land area of the project20.044 acres
Total licensed area53.383 acres
Licence19 OF 2019 DATED 11.02.2019
FAR permissible / proposed1.37 / 1.18
Estimated project cost₹ 1,494.43 Cr
Cost of land₹ 190.69 Cr
Cost of construction₹ 725.1 Cr
Infrastructure and other structures₹ 94.01 Cr
EDC, taxes, levies and other costs₹ 484.62 Cr

How the land will be used

UseAcresShare
Land Area To Be Used For Construction Of Apartments1.92459.6%
Construction Of Roads10.669953.2%
Green Belts6.28431.4%
Stp0.51042.5%
Undergroundwatertank0.37461.9%
Electricsubstation0.28021.4%

Apartments 1,309 units · 11 towers

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings138,483.68-1309

Areas are as filed with HRERA. Some rows show a total built-up area rather than one home’s carpet area, as entered by the promoter.

External services

ServiceProvided byApproval taken
RoadsNoWATER SUPPLY
GMDAYesELECTRICITY
DHBVNYesSEWAGE DISPOSAL
GMDAYesSTORM WATER DRAINAGE
GMDAYes4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:
Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)1INTERNAL ROADS AND PAVEMENTS
1046.04AS PER PROJECT REPORT2
Water Supply System250.00AS PER PROJECT REPORT
3STORM WATER DRAINAGE125.00
As Per Project Report4ELECTRICITY SUPPLY SYSTEM
1080.00AS PER PROJECT REPORT5
Sewage Treatment & Garbage Disposal250.00AS PER PROJECT REPORT
6STREET LIGHTING110.00
As Per Project Report7SECURITY AND FIRE FIGHTING
595.00AS PER PROJECT REPORT8
Playgrounds And Parks70.00AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0.00
As Per Project Report10SHOPPING AREA
0.00AS PER PROJECT REPORT11
Renewable Energy System0.00AS PER PROJECT REPORT
12SCHOOL0.00
As Per Project Report13HOSPITAL/DISPENSARY
0.00AS PER PROJECT REPORT14
Any Other1186.19AS PER PROJECT REPORT
15BOUNDARY WALL96.60
As Per Project Report16PARKING MARKING
43.85AS PER PROJECT REPORT17
Stp320.00AS PER PROJECT REPORT
18UNDERGROUND WATER TANK265.00
As Per Project Report19RAIN WATER HARVESTING
13.00AS PER PROJECT REPORT20
Electrical Sub Station3745.75AS PER PROJECT REPORT
21FIRE FIGHTING SERVICES204.75
As Per Project Report5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.13-03-2023
(date)6. Date of approval of Building Plans13-03-2023
(date)7. New projects:i) Likely date of starting the construction work
01-07-2023ii) Likely date of completing the project28-02-2031
iii) Sizes of the plots to be offered in the projectSr. NoPlot Area(In Square Meter)
Number of plots in the project10
0Total0
iv. Type of apartments to be constructed in the project:TypeCarpet area(In Square Meter)
Number of apartmentsNumber of towersApartment/Shops/Other Buildings
138483.68130911
(vi) Quarterly schedule of development of whole/remaining part of the project:(c) Apartments/Shops/Other BuildingsExpenditure incurred till the date of application (In Lakhs)
ParticularsExpenditureExpenditure to be made in each quarter (In Lakhs)
ParticularsYear-2023Jan-Mar
Apr-JuneJuly-SepOct-Dec
Apartments1694.913214.07
Shops00
Plots00
ParticularsYear-2024Jan-Mar
Apr-JuneJuly-SepOct-Dec
Apartments2941.443676.29
3628.894540.09Shops
000
0Plots0
000
ParticularsYear-2025Jan-Mar
Apr-JuneJuly-SepOct-Dec
Apartments3437.835807.18
7415.266847.80Shops
000
0Plots0
000
ParticularsYear-2026Jan-Mar
Apr-JuneJuly-SepOct-Dec
Apartments7529.374965.77
3411.543786.26Shops
000
0Plots0
000
ParticularsYear-2027Jan-Mar
Apr-JuneJuly-SepOct-Dec
Apartments2921.642921.64
2431.751338.35Shops
000
0Plots0
000
(d) InfrastructureExpenditure incurred till the date of application (In Lakhs)Particulars
ExpenditureExpenditure to be made in each quarter (In Lakhs)Particulars
Year-2023Jan-MarApr-June
July-SepOct-DecRoads & Pavements
00Water Supply System
00Sewerage treatment & garbage disposal
00Electricity Supply System
00Storm Water Drainage
00Parks and Playgrounds
00Clubhouse/community centres
00Shopping area
00Other
00BOUNDARY WALL
00It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - DAccounts related information:
1. Annex copy of the balance sheet of last 3 yearsYes2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.
Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No3. Bank account to which the deposits received from apartment buyers will be credited
Bank and Branch addressICICI BANK LIMITED & M3M TEE POINT, SECTOR-65, GURUGRAMBank Account number
777705002923IFSC codeICIC0007242
MICR code110229338Branch code
0072424. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)1) Mr. Vyom Shakti Nigam-D3/103 Paras city E3 AreraColony Bhopal M.P. 462016 2) MS. Amarjot Kaur Sahni-3/66Subhash Nagar West Delhi 110027 3) Ms. Shubhra Bakshi-House No 10/6, DLF Phase-1, Sikanderpur Ghosi, Gurgaon,Haryana- 122002 4) Ms. Surbhi- Flat No-3-905, 9th floor,Sector-103, grandiva, Daultabad, Gurgaon, Haryana-1220065) Mr. Vidya Sagar-3G-208, Faridabad, NIT Faridabad,Haryana- 121001 6) Mr. Pratap Singh-10A Pocket 2 MayurVihar East Delhi 110096 7) Mr. Pradeep Kumar Katiyar- 357,Bakhothi Purwa, Thana Bilaur, Kanpur- 209202, UP
5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)UPLOADEDI hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - E
Details of the statutory approvals:1. Annex copies of the following in Folder E:i. Lay out Plan
Yesii. Demarcation PlanYes
iii. Zoning PlanYesiv. Building Plan
YesSite PlanYes
Floor PlanYesApartment Plans
YesElevation SectionYes
Detail of Permissible FARYesDetail of covered area achieved FAR
Yes2. Annex copies of the following in Folder E:I. ROADS AND PAVEMENT PLAN
YesII. ELECTRICITY SUPPLY PLANYes
III. Water Supply PlanYesIV. SEWERAGE AND GARBAGE DISPOSAL PLAN
YesV. STROM WATER DRAINAGEYes
Vi. 10% Land To Be Transferred To The Govt. For Community FacilityNoVII. STREET LIGHTING PLAN
YesVIII. PARKING PLANYes
3. Statutory Approvals StatusStatutory ApprovalsStatutory Approvals Status
DateI. BUILDING PLAN APPROVALALREADY BEEN OBTAINED
13-03-2023It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees.Signature _____________
Seal _____________Date _____________FORM REP-I
Part - F1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.(Annex a copy in Folder F)
Yes2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)(Annex a copy in Folder F)
Yes3. Gist of the important provisions of the Draft Agreement(Annex a copy in Folder F)
As Per Harera NormsI hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - GProjects launched by the promoter in last five years:
1. Name and location of the projectM3M ANTALYA HILLS PHASE 1, SECTOR 79, GURUGRAM2. Particulars of the project in brief:
i. Total area of the project5.215ii. Total number of apartments
636iii. Total number of plots0
3. The number of plots/ apartments booked/sold to the allottees:(a) Apartments0
(b) Plots04. Details of the expenditure incurred upto date:
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project(Other than cost of land)29946.18
00Cost of the apartments
19053.5700
Cost of the infrastructure2823.960
0Others costs6482.19
005. Total amount of money collected from current allottees of the apartments/ plots upto the date of filing this application.
2062.90 Lakhs6. Remaining amount of sale price money to be collected from the current allottees of the apartments.20249.75 Lakhs
7. Loan sanctioned by the banks/ other financial institutions against the project.0 Lakhs8. Amount drawn from the banks/ other financial institutions till the date of filing this application.
0 Lakhs9. Whether any litigation is pending against the Project:Yes/No
(If yes-give Annex details in folder G)No10. Initial date of completion of the project.
31-12-202511. Likely date of completion of the project.31-12-2025
1. Name and location of the projectM3M ANTALYA HILLS PHASE II, SECTOR 79, GURUGRAM2. Particulars of the project in brief:
i. Total area of the project15.5299ii. Total number of apartments
2068iii. Total number of plots0
3. The number of plots/ apartments booked/sold to the allottees:(a) Apartments0
(b) Plots04. Details of the expenditure incurred upto date:
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project(Other than cost of land)97074.26
00Cost of the apartments
56297.0000
Cost of the infrastructure12515.870
0Others costs28261.39
005. Total amount of money collected from current allottees of the apartments/ plots upto the date of filing this application.
5126.73 Lakhs6. Remaining amount of sale price money to be collected from the current allottees of the apartments.52387.25 Lakhs
7. Loan sanctioned by the banks/ other financial institutions against the project.0 Lakhs8. Amount drawn from the banks/ other financial institutions till the date of filing this application.
0 Lakhs9. Whether any litigation is pending against the Project:Yes/No
(If yes-give Annex details in folder G)No10. Initial date of completion of the project.
30-06-202611. Likely date of completion of the project.30-06-2026
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - H
Specification Of ConstructionSpecification of apartments and other buildings including the following:1
Flooring Details Of Various Parts Of HouseVITRIFIED TILES/LAMINATEDWOODEN FLOOR/CERAMIC TILE2
Wall Finishing DetailsPLASTER WITH OBD3
Kitchen DetailsNA4
Bathroom FittingsNA5
Wood Work EtcNA6
Doors And Windos FramesEXTERNAL ALUMINIUM WITH GLASSINTERNAL – WOODEN7
Glass WorkONLY EXTERNAL DOOR/WINDOW8
Electric FittingsAS PER APPROVED MAKE9
Conducting And Wiring DetailsAS PER APPROVED MAKE10
Cupboard DetailsNA11
Water StorageAS PER NORMS12
Lift DetailsLIFTS AS PER BUILDING PLANS13
External GlazingsGLASS WITH ALUMINIUM FRAMINGSLIDING13.1
Windows/GlazingsGLASS WITH ALUMINIUM FRAMINGSLIDING14
DoorsNA14.1
Main DoorsHARD WOOD DOOR FRAME WITHFLUSH DOOR /LAMINATE14.2
Internal DoorsHARD WOOD DOOR FRAME WITHFLUSH DOOR /LAMINATE15
Air ConditioningNA16
Electrical FittingsAS PER APPROVED MAKE17
Cng Pipe LineSERVICE PROVIDER18
Provision Of Wifi And Broadband FacilityNA19
External Finishing/Colour SchemeWATER PROOF PAINT20
Internal FinishingNASPECIFICATION UNIT WISE
1 . Living/Dining/Foyer/Family Lounge1 . 1FLOOR
Vitrified Tiles1 . 2WALLS
Plaster /Obd1 . 3CEILING
Obd2 . MASTER BEDROOM/DRESSROOM2 . 1
FloorVITRIFIED TILES/LAMINATE WOODENFLOORING2 . 2
WallsPLASTER + OBD2 . 3
CeilingOBD2 . 4
Modular WardrobesNA3 . MASTER TOILET
3 . 1FLOORANTISKID CERAMIC TILES
3 . 2WALLSPLASTER +DADO
3 . 3CEILINGGRID FALSE CEILING/OBD
3 . 4COUNTERSNA
3 . 5SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
3 . 6FITTING/FIXTURESAS PER APPROVED MAKE
4 . Bed Rooms4 . 1FLOOR
Vitrified Tiles/Laminate Woodenflooring4 . 2WALLS
Plaster /Obd4 . 3CEILING
Obd4 . 4WARDROBES
Na5 . TOILET5 . 1
FloorANTISKID CERAMIC TILES5 . 2
WallsPLASTER +DADO5 . 3
CeilingGRID FALSE CEILING/OBD5 . 4
CountersNA5 . 5
Sanitary Ware/Cp FittingsAS PER APPROVED MAKE5 . 6
FixturesAS PER APPROVED MAKE6 . KITCHEN
6 . 1FLOORVITRIFIED TILES
6 . 2WALLSPLASTER+DADO
6 . 3CEILINGOBD
6 . 4COUNTERSSTONE / MARBLE
6 . 5FIXTURESAS PER APPROVED MAKE
6 . 6KITCHEN APPLIANCESNA
7 . Utility Rooms/Utility Balcony/Toilet7 . 1FLOOR
Anti Skid Vitrified Tiles7 . 2WALLS & CEILING
Plaster + Paint7 . 3TOILET
Anti Skid Ceramic Tiles7 . 4BALCONY
Anti Skid Ceramic Tiles8 . SIT-OUTS8 . 1
FloorNA8 . 2
Walls & CeilingNA8 . 3
RailingsNA8 . 4
FixturesNAI hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________List of Uploaded DocumentsSr. No.
Document DescriptionDate of Document UploadView Document
1TOWER T-1, 4 & 8 29TH FLOOR PLAN & AREA DETAILS17-03-2023
View Document2TOWER T-2,5,6,10 & 11 30TH FLOOR (PENT HOUSE) PLAN & AREA DETAILS
17-03-2023View Document3
Tower T-2, 5, 6, 10 & 11 2ND 18TH, 20TH-27TH Floor Plan & Area Details17-03-2023View Document
4TOWER T-1, 4 & 8 2ND 18TH, 20TH FLOOR PLAN & AREA DETAILS17-03-2023
View Document5TOWER T-3,7,9 GROUND FLOOR PLAN & AREA DETAILS
17-03-2023View Document6
Tower T-2, 5, 6, 10 & 11 29TH Floor (Penthouse) Plan & Area Details17-03-2023View Document
7TOWER T-3,7,9 TERRACE & ABOVE LVL. PLANS & AREA DETAILS17-03-2023
View Document8PARKING PLAN-2
17-03-2023View Document9
In Case Of Group Housing/ Commercial Sites, A Copy Of The Approved Site Plan17-03-2023View Document
10TOWER T-1, 4 &8 GROUND FLOOR PALN & AREA DETAILS17-03-2023
View Document11TOWER T-3,7,9 2ND -18TH,20TH -27TH FLOOR PLAN & AREA DETAILS
17-03-2023View Document12
Tower T-1, 4 & 8 30TH Floor Plan & Area Details17-03-2023View Document
13TOWER-1 FLOOR PLANS17-03-2023
View Document14SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN
14-03-2023View Document15
Tower T-2, 5 & 10 Ground Floor Plan & Area Details17-03-2023View Document
16DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.14-03-2023
View Document17TOWER T-3,7,9 IST FLOOR PLAN & AREA DETAILS
17-03-2023View Document18
Parking Plan17-03-2023View Document
19SUPERIMPOSED DEMARCATION PLAN17-03-2023
View Document20TOWER T-2,5,6,10 & 11 TERRACE & ABOVE FLOOR PLAN & AREA DETAILS
17-03-2023View Document21
Tower-2,5,6,10 Floor Plans17-03-2023View Document
22TOWER T-3,7,9 29TH FLOOR (PENTHOUSE LOWER )PLAN & AREA DETAILS17-03-2023
View Document23TOWER T1, 4, 8 ELEVATION 1, 2 & 3_COMPRESSED
17-03-2023View Document24
Sewerage Plan17-03-2023View Document
25ROAD AND PAVEMENT PLAN17-03-2023
View Document26TOWER T-1, 4 & 8 TERACE & ABOVE FLOOR PLAN & AREA DETAILS
17-03-2023View Document27
Br III17-03-2023View Document
28TOWER T-1, 4 & 8 19TH & 28TH (REFUGE) FLOOR PLAN & AREA DETAILS17-03-2023
View Document29TOWER T-6 & 11 GROUND FLOOR PLAN & AREA DETAILS
17-03-2023View Document30
Tower-1,4,8 Floor Plans17-03-2023View Document
31COPY OF LICENSE ALONG WITH SCHEDULE OF LAND17-03-2023
View Document32DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD
17-03-2023View Document33
Tower T-3,7,9 30TH Floor (Penthouse Upper) Plan & Area Details17-03-2023View Document
34IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN14-03-2023
View Document35STRUCTURAL PLAN 2
17-03-2023View Document36
Tower T-2, 5, 6 10 & 11(19TH & 28TH) Refuge Floor Plan & Area Details17-03-2023View Document
37TOWER T-2,5,6,10 & 11 ELEVATION 1 & ELEVATION 217-03-2023
View Document38TOWER T-2, 5, 6, 10 & 11 FIRST FLOOR PLAN & AREA DETAILS
17-03-2023View Document39
Zoning Plan17-03-2023View Document
40TOWER T-2,5,6,10 & 11 SECTION X-X & SECTION Y-Y17-03-2023
View Document41TOWER T-3,7,9 REFUGE FLOOR (19TH & 28TH ) PLAN & AREA DETAILS
17-03-2023View Document42
Structural Plan17-03-2023View Document
43NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT17-03-2023
View Document44ORDER DTCP REVISED LAND SCHEDULE
17-03-2023View Document45
Tower T-1, 4 & 8 First Floor Plan & Area Details17-03-2023View Document
46WATER SUPPLY PLAN17-03-2023
View Document47CASH FLOW STATEMENT OF THE PROPOSED PROJECT
16-05-2023View Document48
Electricity & Street Light Plan16-05-2023View Document
49SERVICES PLAN SEWER STORM, WATER SUPPLY16-05-2023
View DocumentI hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 10.46 CrAs Per Project Report
Water Supply System₹ 2.5 CrAs Per Project Report
Storm Water Drainage₹ 1.25 CrAs Per Project Report
Electricity Supply System₹ 10.8 CrAs Per Project Report
Sewage Treatment & Garbage Disposal₹ 2.5 CrAs Per Project Report
Street Lighting₹ 1.1 CrAs Per Project Report
Security And Fire Fighting₹ 5.95 CrAs Per Project Report
Playgrounds And Parks₹ 70 lakhAs Per Project Report
Any Other₹ 11.86 CrAs Per Project Report
Boundary Wall₹ 96.6 lakhAs Per Project Report
Parking Marking₹ 43.85 lakhAs Per Project Report
Stp₹ 3.2 CrAs Per Project Report
Underground Water Tank₹ 2.65 CrAs Per Project Report
Rain Water Harvesting₹ 13 lakhAs Per Project Report
Electrical Sub Station₹ 37.46 CrAs Per Project Report
Fire Fighting Services₹ 2.05 CrAs Per Project Report

Statutory approvals

ApprovalStatusDate
Building Plan ApprovalAlready Been Obtained13 Mar 2023

Specifications (as filed)

Flooring Details Of Various Parts Of HouseVitrified Tiles/Laminatedwooden Floor/Ceramic Tile
Wall Finishing DetailsPlaster With Obd
Doors And Windos FramesExternal Aluminium With Glassinternal – Wooden
Glass WorkOnly External Door/Window
Electric FittingsAs Per Approved Make
Conducting And Wiring DetailsAs Per Approved Make
Water StorageAs Per Norms
Lift DetailsLifts As Per Building Plans
External GlazingsGlass With Aluminium Framingsliding
Windows/GlazingsGlass With Aluminium Framingsliding
Main DoorsHard Wood Door Frame Withflush Door /Laminate
Internal DoorsHard Wood Door Frame Withflush Door /Laminate
Electrical FittingsAs Per Approved Make
Cng Pipe LineService Provider
External Finishing/Colour SchemeWater Proof Paint

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about M3M Golf Hills Phase 1?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.