Registration validHRERA Gurugram

M3M Antalya Hills Phase 1

by Loon Land Development Limited · Sector 79, Gurugram

RERA registration
GGM/650/382/2022/125
Registered on
23 Dec 2022
Valid till
30 Dec 2026
Project ID
RERA-GRG-1242-2022
Land area
8.711 acres
Apartments
636
Plots
159
Completion (as filed)
31 Dec 2025
Estimated cost
₹ 388.23 Cr

RERA registration

Registration certificateGGM/650/382/2022/125, dated 23 Dec 2022
Registration valid till30 Dec 2026
Project IDRERA-GRG-1242-2022
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameM3M Antalya Hills Phase 1
PromoterLoon Land Development Limited
Promoter’s registered officeOffice No. 1221-A, Devika Tower, 12TH Floor, 6, Nehru Place, New Delhi Dl 110019 In
CINU70109DL2014PLC267465
Site addressSector 79, Gurugram
SectorSector 79
Tehsil / DistrictManesar / Gurugram
Layout plan approved29 Nov 2022
Building plans approved20 Dec 2022
Construction start (as filed)1 Jan 2023
Completion (as filed)31 Dec 2025
Application submitted20 Dec 2022

Authority, hearings & orders

Current statusExtension Certificate Uploaded
Initial scrutinyFirst hearing fixed
Next hearingNot Required
  1. Application submitted online
  2. Notice sent to the promoter Deficiency Notice
  3. Hearing Approved And Ready For Certificate Issuing Process View order
    Proceedings

    Ms. Prachi Singh, Planning Executive briefed about the facts of the case. Sh. Abhijeet Singh (AR), Sh. Manik Sharma (AR), Sh. Bharat Vigmal(AR) and Sh. Ayush Gupta (AR)  are present on behalf of the promoter. Approved as proposed.

  1. Registration granted GGM/650/382/2022/125
  2. Registration valid till

Land, licence & cost

Land area of the project8.711 acres
Total licensed area8.711 acres
Licence194 of 2022 dated 29.11.2022
FAR permissible / proposed2.64 / 2.61
Estimated project cost₹ 388.23 Cr
Cost of land₹ 88.77 Cr
Cost of construction₹ 190.54 Cr
Infrastructure and other structures₹ 28.24 Cr
EDC, taxes, levies and other costs₹ 64.82 Cr

How the land will be used

UseAcresShare
Land Area To Be Used For Construction Of Apartments5.21559.9%
Construction Of Roads2.397127.5%
Parks And Playgrounds0.6537.5%
Sewage And Solid Waste Treatment Facility0.0981.1%
Any Other0.3484%

Apartments 636 units

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings50,047.94-636

Areas are as filed with HRERA. Some rows show a total built-up area rather than one home’s carpet area, as entered by the promoter.

Plots 159 plots

Plot size (sq m)Sq ydSq ftPlots
21,106.1625,243227,185159

External services

ServiceProvided byApproval taken
RoadsGMDANo
Water SupplyGMDAYes
ElectricityDHBVNYes
Sewage DisposalGMDAYes
Storm Water DrainageGMDAYes

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 4.18 CrAs Per Project Report
Water Supply System₹ 2.09 CrAs Per Project Report
Storm Water Drainage₹ 79.47 lakhAs Per Project Report
Electricity Supply System₹ 4.98 CrAs Per Project Report
Sewage Treatment & Garbage Disposal₹ 2.37 CrAs Per Project Report
Street Lighting₹ 33 lakhAs Per Project Report
Security And Fire Fighting₹ 81.43 lakhAs Per Project Report
Playgrounds And Parks₹ 5 lakhAs Per Project Report
Any Other₹ 4.78 CrAs Per Project Report
Parking₹ 6.36 lakhAs Per Project Report
Sewerage Treatment Plant₹ 63.75 lakhAs Per Project Report
Underground Water Tank₹ 50 lakhAs Per Project Report
Rain Water Harvesting₹ 39.2 lakhAs Per Project Report
Electrical Sub Station₹ 6.26 CrAs Per Project Report

Statutory approvals

ApprovalStatusDate
Environment ClearanceAlready Been Obtained7 Dec 2022
Forest NocAlready Been Obtained15 Mar 2022
Assurance Water SupplyAlready Been Obtained11 Nov 2022
Assurance Sewage DisposalAlready Been Obtained27 Oct 2022
Assurance Storm Water DrainageAlready Been Obtained24 Nov 2022
Building Plan ApprovalAlready Been Obtained20 Dec 2022

Specifications (as filed)

Flooring Details Of Various Parts Of HouseVitrified Tiles/Laminate Wooden For Bedroom ; Antiskid Ceramic Tiles For Toilet
Wall Finishing DetailsPlaster And Obd
Kitchen DetailsVitrified Tiles, Plaster And Obd
Bathroom FittingsAs Per Approved Make
Wood Work EtcFlush Door For Entrance And Internal Doors, Finished With Laminate/Veneer
Doors And Windos FramesUpvc / Aluminium Powder Coated For External
Glass WorkExternal Doors And Windows, Railings As Per Design
Electric FittingsAs Per Approved Make
Conducting And Wiring DetailsAs Per Approved Make
Cupboard DetailsWooden With Laminate/Veneer
Water StoragePvc Tank; Ugt
Lift Details4 To 6 Passenger Lifts As Per Norms
Windows/GlazingsAluminum Glazing / Upvc Glazing
DoorsWooden With Laminate/Veneer
Main DoorsWooden With Laminate/Veneer
Internal DoorsWooden With Laminate/Veneer
Air ConditioningProvision Only
Electrical FittingsAs Per Approved Make
Cng Pipe LineProvision Only
External Finishing/Colour SchemeAs Per Approved Design
Internal FinishingPlaster And Obd

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about M3M Antalya Hills Phase 1?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.