Layout plan approved
29 Nov 2022
Building plans approved
20 Dec 2022
Construction start (as filed)
1 Jan 2023
Completion (as filed)
31 Dec 2025
Application submitted
20 Dec 2022
Authority, hearings & orders
Current statusExtension Certificate Uploaded
Initial scrutinyFirst hearing fixed
Next hearingNot Required
Application submitted online
Notice sent to the promoterDeficiency Notice
HearingApproved And Ready For Certificate Issuing ProcessView order Proceedings
Ms. Prachi Singh, Planning Executive briefed about the facts of the case. Sh. Abhijeet Singh (AR), Sh. Manik Sharma (AR), Sh. Bharat Vigmal(AR) and Sh. Ayush Gupta (AR) are present on behalf of the promoter. Approved as proposed.
Registration grantedGGM/650/382/2022/125
Registration valid till
Land, licence & cost
Land area of the project
8.711 acres
Total licensed area
8.711 acres
Licence
194 of 2022 dated 29.11.2022
FAR permissible / proposed
2.64 / 2.61
Estimated project cost
₹ 388.23 Cr
Cost of land
₹ 88.77 Cr
Cost of construction
₹ 190.54 Cr
Infrastructure and other structures
₹ 28.24 Cr
EDC, taxes, levies and other costs
₹ 64.82 Cr
How the land will be used
Use
Acres
Share
Land Area To Be Used For Construction Of Apartments
5.215
59.9%
Construction Of Roads
2.3971
27.5%
Parks And Playgrounds
0.653
7.5%
Sewage And Solid Waste Treatment Facility
0.098
1.1%
Any Other
0.348
4%
Apartments 636 units
Type
Carpet area (sq m)
Carpet area (sq ft)
Units
Apartment/Shops/Other Buildings
50,047.94
-
636
Areas are as filed with HRERA. Some rows show a total built-up area rather than one home’s carpet area, as entered by the promoter.
Plots 159 plots
Plot size (sq m)
Sq yd
Sq ft
Plots
21,106.16
25,243
227,185
159
External services
Service
Provided by
Approval taken
Roads
GMDA
No
Water Supply
GMDA
Yes
Electricity
DHBVN
Yes
Sewage Disposal
GMDA
Yes
Storm Water Drainage
GMDA
Yes
Facilities in the service plan
Facility
Estimated cost
Status
Internal Roads And Pavements
₹ 4.18 Cr
As Per Project Report
Water Supply System
₹ 2.09 Cr
As Per Project Report
Storm Water Drainage
₹ 79.47 lakh
As Per Project Report
Electricity Supply System
₹ 4.98 Cr
As Per Project Report
Sewage Treatment & Garbage Disposal
₹ 2.37 Cr
As Per Project Report
Street Lighting
₹ 33 lakh
As Per Project Report
Security And Fire Fighting
₹ 81.43 lakh
As Per Project Report
Playgrounds And Parks
₹ 5 lakh
As Per Project Report
Any Other
₹ 4.78 Cr
As Per Project Report
Parking
₹ 6.36 lakh
As Per Project Report
Sewerage Treatment Plant
₹ 63.75 lakh
As Per Project Report
Underground Water Tank
₹ 50 lakh
As Per Project Report
Rain Water Harvesting
₹ 39.2 lakh
As Per Project Report
Electrical Sub Station
₹ 6.26 Cr
As Per Project Report
Statutory approvals
Approval
Status
Date
Environment Clearance
Already Been Obtained
7 Dec 2022
Forest Noc
Already Been Obtained
15 Mar 2022
Assurance Water Supply
Already Been Obtained
11 Nov 2022
Assurance Sewage Disposal
Already Been Obtained
27 Oct 2022
Assurance Storm Water Drainage
Already Been Obtained
24 Nov 2022
Building Plan Approval
Already Been Obtained
20 Dec 2022
Specifications (as filed)
Flooring Details Of Various Parts Of House
Vitrified Tiles/Laminate Wooden For Bedroom ; Antiskid Ceramic Tiles For Toilet
Wall Finishing Details
Plaster And Obd
Kitchen Details
Vitrified Tiles, Plaster And Obd
Bathroom Fittings
As Per Approved Make
Wood Work Etc
Flush Door For Entrance And Internal Doors, Finished With Laminate/Veneer
Doors And Windos Frames
Upvc / Aluminium Powder Coated For External
Glass Work
External Doors And Windows, Railings As Per Design
Electric Fittings
As Per Approved Make
Conducting And Wiring Details
As Per Approved Make
Cupboard Details
Wooden With Laminate/Veneer
Water Storage
Pvc Tank; Ugt
Lift Details
4 To 6 Passenger Lifts As Per Norms
Windows/Glazings
Aluminum Glazing / Upvc Glazing
Doors
Wooden With Laminate/Veneer
Main Doors
Wooden With Laminate/Veneer
Internal Doors
Wooden With Laminate/Veneer
Air Conditioning
Provision Only
Electrical Fittings
As Per Approved Make
Cng Pipe Line
Provision Only
External Finishing/Colour Scheme
As Per Approved Design
Internal Finishing
Plaster And Obd
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about M3M Antalya Hills Phase 1?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.