4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
146.59
Yet To Be Prepared
2
WATER SUPPLY SYSTEM
23068
YET TO BE PREPARED
3
Storm Water Drainage
63.29
YET TO BE PREPARED
4
ELECTRICITY SUPPLY SYSTEM
711.42
Yet To Be Prepared
5
SEWAGE TREATMENT & GARBAGE DISPOSAL
104.30
YET TO BE PREPARED
6
Street Lighting
7.34
YET TO BE PREPARED
7
SECURITY AND FIRE FIGHTING
39.95
Yet To Be Prepared
8
PLAYGROUNDS AND PARKS
8.71
YET TO BE PREPARED
9
Club House/Community Centre
62.80
YET TO BE PREPARED
10
SHOPPING AREA
225
Yet To Be Prepared
11
RENEWABLE ENERGY SYSTEM
0
YET TO BE PREPARED
12
School
0
YET TO BE PREPARED
13
HOSPITAL/DISPENSARY
0
Yet To Be Prepared
14
ANY OTHER
0
YET TO BE PREPARED
5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.
06-07-2018
(date)
6. Date of approval of Building Plans
06-07-2018
(date)
7. New projects:
i) Likely date of starting the construction work
25-08-2019
ii) Likely date of completing the project
24-08-2023
iii) Sizes of the plots to be offered in the project
Sr. No
Plot Area(In Square Meter)
Number of plots in the project
1
0
0
Total
0
iv. Type of apartments to be constructed in the project:
Type
Carpet area(In Square Meter)
Number of apartments
Number of towers
Apartment/Shops/Other Buildings
45
723
1
(vi) Quarterly schedule of development of whole/remaining part of the project:
(c) Apartments/Shops/Other Buildings
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2019
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
Shops
0
Plots
0
(d) Infrastructure
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2019
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
Water Supply System
0
Sewerage treatment & garbage disposal
0
Electricity Supply System
0
Storm Water Drainage
0
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
0
It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
FORM REP-I
Part - D
Accounts related information:
1. Annex copy of the balance sheet of last 3 years
No
2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.
Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.
No
3. Bank account to which the deposits received from apartment buyers will be credited
Bank and Branch address
AXIS BANK JASOLA
Bank Account number
918020110921754
IFSC code
UTIB0001148
MICR code
110211085
Branch code
1148
4. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)
Mr Arvinder Singh
5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
FORM REP-I
Part - E
Details of the statutory approvals:
1. Annex copies of the following in Folder E:
i. Lay out Plan
No
ii. Demarcation Plan
Yes
iii. Zoning Plan
No
iv. Building Plan
No
Site Plan
Yes
Floor Plan
No
Apartment Plans
No
Elevation Section
No
Detail of Permissible FAR
No
Detail of covered area achieved FAR
No
2. Annex copies of the following in Folder E:
I. ROADS AND PAVEMENT PLAN
No
II. ELECTRICITY SUPPLY PLAN
No
III. Water Supply Plan
No
IV. SEWERAGE AND GARBAGE DISPOSAL PLAN
No
V. STROM WATER DRAINAGE
No
Vi. 10% Land To Be Transferred To The Govt. For Community Facility
No
VII. STREET LIGHTING PLAN
No
VIII. PARKING PLAN
No
3. Statutory Approvals Status
Statutory Approvals
Statutory Approvals Status
Date
I. AIRPORT AUTHORITY
ALREADY BEEN OBTAINED
02-06-2018
II. FOREST NOC
ALREADY BEEN OBTAINED
26-03-2019
III. ENVIRONMENT CLARENCE
ALREADY BEEN OBTAINED
20-08-2019
It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees.
Signature _____________
Seal _____________
Date _____________
FORM REP-I
Part - F
1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.
(Annex a copy in Folder F)
Yes
2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)
(Annex a copy in Folder F)
Yes
3. Gist of the important provisions of the Draft Agreement
(Annex a copy in Folder F)
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
FORM REP-I
Part - G
Projects launched by the promoter in last five years: (No Projects)
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
Form Rep-I
Part - H
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1
FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
Ceramic / Vitrified Tiles
2
WALL FINISHING DETAILS
Oil Bound Distemper
3
KITCHEN DETAILS
Na
4
BATHROOM FITTINGS
Isi Marked C.p. Fittings
5
WOOD WORK ETC
Na
6
DOORS AND WINDOS FRAMES
Aluminum Power Coated / M.s.sections/ Upvc As Per Is Codes
7
GLASS WORK
Clear Float Glass
8
ELECTRIC FITTINGS
Isi Marked Switches & Sockets
9
CONDUCTING AND WIRING DETAILS
Cooper Electrical Wiring Through In-Concealed Conduit For Light Point
10
CUPBOARD DETAILS
Na
11
WATER STORAGE
Rcc Tanks (O.h.t. & U.g.t.)
12
LIFT DETAILS
Branded As Per Industry Standards
13
EXTERNAL GLAZINGS
Aluminum Power Coated / M.s.sections/ Upvc As Per Is Codes
13.1
WINDOWS/GLAZINGS
Aluminum Power Coated / M.s.sections/ Upvc As Per Is Codes
14
DOORS
Flush Door With Painted Finish On Both Side
14.1
MAIN DOORS
Flush Door With Painted Finish On Both Side
14.2
INTERNAL DOORS
Flush Door With Painted Finish On Both Side
15
AIR CONDITIONING
Na
16
ELECTRICAL FITTINGS
As Per Is Codes
17
CNG PIPE LINE
As Per Is Codes
18
PROVISION OF WIFI AND BROADBAND FACILITY
Na
19
EXTERNAL FINISHING/COLOUR SCHEME
Weather Proof Paint
20
INTERNAL FINISHING
Oil Bound Distemper
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1
FLOOR
CERAMIC / VITRIFIED TILES
1 . 2
WALLS
OIL BOUND DISTEMPER
1 . 3
CEILING
OIL BOUND DISTEMPER
2 . Master Bedroom/Dressroom
2 . 1
FLOOR
Ceramic / Vitrified Tiles
2 . 2
WALLS
Oil Bound Distemper
2 . 3
CEILING
Oil Bound Distemper
2 . 4
MODULAR WARDROBES
Na
3 . MASTER TOILET
3 . 1
Floor
ANTI SKID CERAMIC / VITRIFIED TILES
3 . 2
Walls
CERAMIC TILES TILL 4'/7' HIGH & OIL BOUND DISTEMPER ABOVE
3 . 3
Ceiling
GRID FALSE CEILING / OIL BOUND DISTEMPER
3 . 4
Counters
INDIAN MARBLE/ GRANITE
3 . 5
Sanitary Ware/Cp Fittings
ISI MARKED W.C. & WASHBASIN
3 . 6
Fitting/Fixtures
ISI MARKED
4 . BED ROOMS
4 . 1
FLOOR
CERAMIC / VITRIFIED TILES
4 . 2
WALLS
OIL BOUND DISTEMPER
4 . 3
CEILING
OIL BOUND DISTEMPER
4 . 4
WARDROBES
NA
5 . Toilet
5 . 1
FLOOR
Anti-Skid Ceramic / Vitrified Tiles
5 . 2
WALLS
Ceramic Tiles Till 4'/7' High & Oil Bound Distemper Above
5 . 3
CEILING
Grid False Ceiling / Oil Bound Distemper
5 . 4
COUNTERS
Indian Marble/ Granite
5 . 5
SANITARY WARE/CP FITTINGS
Isi Marked W.c. & Washbasin
5 . 6
FIXTURES
Isi Marked
6 . KITCHEN
6 . 1
Floor
CERAMIC / VITRIFIED TILES
6 . 2
Walls
OIL BOUND DISTEMPER
6 . 3
Ceiling
OIL BOUND DISTEMPER
6 . 4
Counters
INDIAN MARBLE/ GRANITE
6 . 5
Fixtures
ISI MARKED CP FITTINGS & SINGLE DRAIN BOARD SINK
6 . 6
Kitchen Appliances
NA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1
FLOOR
ANTI-SKID/MATT FINISH CERAMIC TILES
7 . 2
WALLS & CEILING
OIL BOUND DISTEMPER
7 . 3
TOILET
NA
7 . 4
BALCONY
NA
8 . Sit-Outs
8 . 1
FLOOR
Anti-Skid/Matt Finish Ceramic Tiles
8 . 2
WALLS & CEILING
Oil Bound Distemper
8 . 3
RAILINGS
Ms Railing With Enamel Paint Finish
8 . 4
FIXTURES
Isi Marked
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Date _____________
List of Uploaded Documents
Sr. No.
Document Description
Date of Document Upload
View Document
1
Zoning Plan
14-02-2020
View Document
2
DEMARCATION PLAN
14-02-2020
View Document
3
IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN
14-02-2020
View Document
4
A Complete Set Of The Last Approved Building Plans
14-02-2020
View Document
5
CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT
14-02-2020
View Document
6
NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT
14-02-2020
View Document
7
Cash Flow Statement Of The Proposed Project
14-02-2020
View Document
8
DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.
14-02-2020
View Document
9
IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN
14-02-2020
View Document
10
Documents Relating To The Entry Of License And Collaboration Agreement In The Revenue Record
14-02-2020
View Document
11
SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN
14-02-2020
View Document
12
COPY OF LICENSE ALONG WITH SCHEDULE OF LAND
14-02-2020
View Document
I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp _____________
Facilities in the service plan
Facility
Estimated cost
Status
Internal Roads And Pavements
₹ 1.47 Cr
Yet To Be Prepared
Water Supply System
₹ 230.68 Cr
Yet To Be Prepared
Storm Water Drainage
₹ 63.29 lakh
Yet To Be Prepared
Electricity Supply System
₹ 7.11 Cr
Yet To Be Prepared
Sewage Treatment & Garbage Disposal
₹ 1.04 Cr
Yet To Be Prepared
Street Lighting
₹ 7.34 lakh
Yet To Be Prepared
Security And Fire Fighting
₹ 39.95 lakh
Yet To Be Prepared
Playgrounds And Parks
₹ 8.71 lakh
Yet To Be Prepared
Club House/Community Centre
₹ 62.8 lakh
Yet To Be Prepared
Shopping Area
₹ 2.25 Cr
Yet To Be Prepared
Statutory approvals
Approval
Status
Date
Airport Authority
Already Been Obtained
2 Jun 2018
Forest Noc
Already Been Obtained
26 Mar 2019
Environment Clarence
Already Been Obtained
20 Aug 2019
Specifications (as filed)
Flooring Details Of Various Parts Of House
Ceramic / Vitrified Tiles
Wall Finishing Details
Oil Bound Distemper
Bathroom Fittings
Isi Marked C.p. Fittings
Doors And Windos Frames
Aluminum Power Coated / M.s.sections/ Upvc As Per Is Codes
Glass Work
Clear Float Glass
Electric Fittings
Isi Marked Switches & Sockets
Conducting And Wiring Details
Cooper Electrical Wiring Through In-Concealed Conduit For Light Point
Water Storage
Rcc Tanks (O.h.t. & U.g.t.)
Lift Details
Branded As Per Industry Standards
External Glazings
Aluminum Power Coated / M.s.sections/ Upvc As Per Is Codes
Windows/Glazings
Aluminum Power Coated / M.s.sections/ Upvc As Per Is Codes
Doors
Flush Door With Painted Finish On Both Side
Main Doors
Flush Door With Painted Finish On Both Side
Internal Doors
Flush Door With Painted Finish On Both Side
Electrical Fittings
As Per Is Codes
Cng Pipe Line
As Per Is Codes
External Finishing/Colour Scheme
Weather Proof Paint
Internal Finishing
Oil Bound Distemper
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Kavyam-Phase-1?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.