306-308, Square One, C-2, District Centre, Saket, New Delhi-110017
CIN
U45201DL2005PLC133161
Site address
Sector- 102, Gurugram
Sector
Sector 102
Tehsil / District
Gurgaon / Gurugram
Application submitted
16 Nov 2018
Authority, hearings & orders
Current statusApproved And Certificate Uploaded
Next hearingNot Required
Registration valid till
Application submitted online
Application received by HRERA Gurugram
Registration grantedGGM/320/52/2019/14
Land, licence & cost
Land area of the project
4.57 acres
Total licensed area
12 acres
Licence
107 of 2012 (validity dated 09.10.2020)
FAR permissible / proposed
1.75 / 1.75
Estimated project cost
₹ 180.05 Cr
Cost of land
₹ 5.61 Cr
Cost of construction
₹ 139.63 Cr
EDC, taxes, levies and other costs
₹ 34.81 Cr
How the land will be used
Use
Area (as filed)
Share
Land Area To Be Used For Construction Of Apartments
6,096.23
12.3%
Construction Of Roads
12,530
25.3%
Parks And Playgrounds
21,595
43.6%
Vehicle Parkings
6,969.21
14.1%
Electricity Sub-Station
510
1%
Club House
431.57
0.9%
Sewage And Solid Waste Treatment Facility
475
1%
Any Other
534.18
1.1%
School
346.16
0.7%
External services
Service
Provided by
Approval taken
Roads
GMDA
No
Water Supply
GMDA
Yes
Electricity
DHBVN
Yes
Sewage Disposal
GMDA
No
Storm Water Drainage
GMDA
No
Facilities in the service plan
Facility
Estimated cost
Status
Internal Roads And Pavements
₹ 1.6 Cr
As Per Project Report
Water Supply System
₹ 58.5 lakh
As Per Project Report
Storm Water Drainage
₹ 1.78 Cr
As Per Project Report
Electricity Supply System
₹ 1.28 Cr
As Per Project Report
Sewage Treatment & Garbage Disposal
₹ 75 lakh
As Per Project Report
Security And Fire Fighting
₹ 18 lakh
As Per Project Report
Playgrounds And Parks
₹ 1 Cr
As Per Project Report
Club House/Community Centre
₹ 1.11 Cr
As Per Project Report
School
₹ 12 lakh
As Per Project Report
Any Other
₹ 3.85 Cr
As Per Project Report
Statutory approvals
Approval
Status
Date
License
Already Been Obtained
10 Oct 2012
Forest Noc
Already Been Obtained
10 Oct 2013
Airport Clearance
Already Been Obtained
26 Apr 2018
HUDA Construction Water Noc
Already Been Obtained
23 Oct 2012
Electrical Load Availability
Already Been Obtained
13 Oct 2017
Environment Clearance
Already Been Obtained
6 Sep 2013
Consent To Establish
Already Been Obtained
20 Dec 2017
Mining Permission
Already Been Obtained
25 Oct 2013
Fire Scheme
Already Been Obtained
25 Oct 2013
Service Estimates Plan
Already Been Obtained
24 Mar 2014
Commencement Certificate
Already Been Obtained
30 Oct 2012
Occupation Certificate For 4 Towers
Already Been Obtained
17 Oct 2018
Specifications (as filed)
Flooring Details Of Various Parts Of House
Tiles & Wooden Flooring
Wall Finishing Details
Acrylic Emulsion Paints
Kitchen Details
Modular Type
Bathroom Fittings
Chrome Plated Fittings
Wood Work Etc
Hard Wooden D/F And Block Wood Shutters
Doors And Windos Frames
Upvc D/W With 6MM Thk Toughened Glass Fittings And Hard Wooden D/F And Block Wood Shutters
Glass Work
Balcony Railings
Electric Fittings
6 Amp /16 Amp Modular Switch And Sockets
Conducting And Wiring Details
Pvc /Ms Conduting And 1.5SQM To 10 Sqm Wiring.
Cupboard Details
Provision In M. Bed Room.( Unit 2025 Sqft Area)
Water Storage
Over Head Tanks And U.g.t
Lift Details
1PASSANGER + 1 Service / Each Tower
External Glazings
Yes
Windows/Glazings
Upvc D/W With 6MM Toughened Glass , Fittings
Doors
Provided
Main Doors
Hard Wood Door With Eye And SS Fittings
Internal Doors
Hard Wooden D/F And Block Wood Shutters With SS Fittings
Air Conditioning
5 Nos Air Conditioning With 1.5 Ton Capacity.
Electrical Fittings
6 Amp /16 Amp Modular Switch And Sockets
Cng Pipe Line
Mdpe Pipe + Ms Pipe With Png/ Lpg Meter
Provision Of Wifi And Broadband Facility
Yes
External Finishing/Colour Scheme
Texture Paints
Internal Finishing
Walls And Ceiling- Acrylic Emulsion Paints And Glass Railing With Duco Paints
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Imperial Garden Phase 2?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.