201-212, Splendor Forum,Iindfloor,Jasoladistrictcentre, New Delhi-110025
CIN
U45201DL2006PLC145950
Site address
Sonipat
Tehsil / District
Sonipat / Sonipat
Layout plan approved
3 Mar 2023
Building plans approved
16 Apr 2024
Construction start (as filed)
1 Oct 2024
Completion (as filed)
16 May 2028
Application submitted
3 Sep 2024
Authority, hearings & orders
Current statusApproved And Certificate Uploaded
Initial scrutinyListed For First Hearing.
Next hearingNot Required
Application submitted online
Application received by HRERA Panchkula
HearingExamination By AuthorityView order Proceedings
LISTED FOR HEARING ON 09-10-2024.
HearingApproved And Ready For Certificate Issuing ProcessView order Proceedings
APPROVED AND READY FOR CERTIFICATE ISSUING PROCESS.
Registration valid till
Land, licence & cost
Licence
License no. 109 of 2023
FAR permissible / proposed
2 / 2
Estimated project cost
₹ 32.5 Cr
Cost of land
₹ 4.36 Cr
Cost of construction
₹ 25.23 Cr
Infrastructure and other structures
₹ 1.97 Cr
EDC, taxes, levies and other costs
₹ 0.93 Cr
How the land will be used
Use
Area (as filed)
Share
Land Area To Be Used For Construction Of Apartments
4,709.24
100%
Apartments 46 units
Type
Carpet area (sq m)
Carpet area (sq ft)
Units
Apartment/Shops/Other Buildings
104.05
1,120
7
Apartment/Shops/Other Buildings
110.69
1,191
4
Apartment/Shops/Other Buildings
125.88
1,355
8
Apartment/Shops/Other Buildings
126.56
1,362
4
Apartment/Shops/Other Buildings
128.92
1,388
6
Apartment/Shops/Other Buildings
129.31
1,392
11
Apartment/Shops/Other Buildings
135.09
1,454
6
Areas are as filed with HRERA.
External services
Service
Provided by
Approval taken
Roads
HARYANA SHEHRIVIKASPRADHIKARAN
Yes
Water Supply
HARYANA SHEHRIVIKASPRADHIKARAN
Yes
Electricity
UTTAR HARYANABIJLI VITRAN
Yes
Sewage Disposal
HARYANA SHEHRIVIKASPRADHIKARAN
Yes
Storm Water Drainage
HARYANA SHEHRIVIKASPRADHIKARAN
Yes
Facilities in the service plan
Facility
Estimated cost
Status
Internal Roads And Pavements
₹ 47.27 lakh
Yet To Be Prepared
Water Supply System
₹ 9.26 lakh
Yet To Be Prepared
Storm Water Drainage
₹ 9.77 lakh
Yet To Be Prepared
Electricity Supply System
₹ 37.5 lakh
Yet To Be Prepared
Sewage Treatment & Garbage Disposal
₹ 18.51 lakh
Yet To Be Prepared
Security And Fire Fighting
₹ 0.34 lakh
Yet To Be Prepared
Playgrounds And Parks
₹ 19.34 lakh
Yet To Be Prepared
Any Other
₹ 55.31 lakh
Yet To Be Prepared
Statutory approvals
Approval
Status
Date
I. License
Already Been Obtained
17 May 2023
II. Demarcation
Already Been Obtained
25 May 2023
III. Zoning Plan
Already Been Obtained
7 Jul 2023
IV. Latest Layout Plan
Already Been Obtained
3 Mar 2023
V. Building Plans
Already Been Obtained
16 Apr 2024
Specifications (as filed)
Flooring Details Of Various Parts Of House
Living Room/ Bed Room- Imported Marble Staircase-Marble Roof Terrace-Brickbatcoba Toilet- Vitrifed Tiles Verandh/Balcony- Vitrified Tiles Drive Way-Pavers Utility Court Yard- Kota Stone Side Terrace- Ceramic Tiles.
Wall Finishing Details
Oil Bound Distemper (Obd) On Walls And Ceiling
Kitchen Details
Wall - 2 Feet Dado Vitrifed Tiles And Rest To Bdcounter-Granite Fitting And Fixtures- Good Quality C.p. Fittings, Stainless Steel Single Bowl Sink With Drain Board. Without Woodwork &Appliances;.
Bathroom Fittings
Good Quality C.p. Fittings, English Type Wc And Wash Basin In White Shade
Doors And Windos Frames
Hard Wood Door Frame With Flush Shutter Inlaminate.
Glass Work
External Doors & Windows Upvc Shuttersand Glazing
Electric Fittings
Good Quality Modular Switches And Sockets,Copper Wiring. (Fittings Like Fans, Geysers,Light Fixtures, Appliances Etc. Not Provided),Provision For Air Conditioning ( Ac Units Notincluded )
Conducting And Wiring Details
Copper Wiring
External Glazings
External Doors & Windows Upvc Shuttersand Glazing
Windows/Glazings
External Doors & Windows Upvc Shuttersand Glazing
Doors
Hard Wood Door Frame With Flush Shutter In Laminate
Main Doors
Hard Wood Door Frame With Flush Shutter In Laminate
Internal Doors
Hard Wood Door Frame With Flush Shutter In Laminate
External Finishing/Colour Scheme
Combination Of Texture Paint
Internal Finishing
Oil Bound Distemper (Obd) On Walls Andceiling
Source: HRERA Panchkula, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Eldeco Amaya Villa?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.