RERA applied, not grantedHRERA Gurugram

ATS Grandstand Phase-1

by Homekraft Infra Private Limited · Sector 99A, Gurugram

RERA registration
Applied, not granted yet
Applied on
4 Aug 2026
Application status
In process
Project ID
RERA-GRG-2313-2026
Land area
11.588 acres
Estimated cost
₹ 195.17 Cr

This project has applied for RERA registration but has not been granted it yet. Under RERA it cannot be advertised, marketed or sold until it is registered.

RERA registration

Registration certificateNot issued yet: the application is being processed by HRERA Gurugram
Project IDRERA-GRG-2313-2026
AuthorityHRERA Gurugram
Project type (as filed)Ongoing
Project nameATS Grandstand Phase-1
PromoterHomekraft Infra Private Limited
Promoter’s registered officeOcus Medley, 16TH Floor, ATS Homekraft Sector
CINU70200DL2017PTC314287
Site addressSector 99A, Gurugram
SectorSector 99A
Tehsil / DistrictGurgaon / Gurugram
Building plans approved10 Jul 2026
Application submitted4 Aug 2026

Authority, hearings & orders

Current statusStatus not given
Next hearingNot Required
  1. Application submitted online

Land, licence & cost

Land area of the project11.588 acres
Total licensed area0.815 acres
Licence37 of 2013 Dated 03.06.2013
FAR permissible / proposed3.4 / 3.25
Estimated project cost₹ 195.17 Cr
Cost of land₹ 19.41 Cr
Cost of construction₹ 131.02 Cr
Infrastructure and other structures₹ 13.99 Cr
EDC, taxes, levies and other costs₹ 30.75 Cr

How the land will be used

UseArea (as filed)Share
Land Area To Be Used For Construction Of Apartments0.29235.8%
Construction Of Roads0.38747.5%
Pavements0.13616.7%

External services

ServiceProvided byApproval taken
RoadsALREADY CONNECTEDYes
Water SupplyGMDAYes
ElectricityDHBVNYes
Sewage DisposalGMDAYes
Storm Water DrainageGMDAYes

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 1.35 CrAs Per Project Report
Water Supply System₹ 2.42 CrAs Per Project Report
Storm Water Drainage₹ 64 lakhAs Per Project Report
Electricity Supply System₹ 1.21 CrAs Per Project Report
Sewage Treatment & Garbage Disposal₹ 72 lakhAs Per Project Report
Street Lighting₹ 30 lakhAs Per Project Report
Security And Fire Fighting₹ 1.85 CrAs Per Project Report
Playgrounds And Parks₹ 14.75 lakhAs Per Project Report
Renewable Energy System₹ 1.03 CrAs Per Project Report
Stp₹ 56 lakhAs Per Project Report
Underground Water Tank₹ 1.67 CrAs Per Project Report
Rain Water Harvesting₹ 83.25 lakhAs Per Project Report
Electrical Sub Station₹ 1.26 CrAs Per Project Report

Statutory approvals

ApprovalStatusDate
LicenseAlready Been Obtained3 Jun 2013
AaiAlready Been Obtained24 Jul 2019
Assurance Of Storm WaterAlready Been Obtained8 Jan 2026
Assurance Of Sewerage ConnectionAlready Been Obtained9 Jan 2026
Assurance For Water SupplyAlready Been Obtained7 Jan 2026
CodAlready Been Obtained19 Jun 2026
HUDA ConstructionAlready Been Obtained4 Dec 2025
Forest NocAlready Been Obtained20 Dec 2013
Br-IIIAlready Been Obtained10 Jul 2026
Electrical LoadApplied For But Yet To Receive3 Aug 2026
EcApplied For But Yet To Receive19 May 2026
Service Plan Estimate ApprovalApplied For But Yet To Receive14 Jul 2026
Fire Scheme ApprovalApplied For But Yet To Receive13 Jul 2026

Specifications (as filed)

Flooring Details Of Various Parts Of HouseVitrified Tiles Flooring In Living, Dining & Lobby Wooden/ Vitrified Tiles Flooring In Bedrooms Vitrified Tiles In Kitchen, Utility & Servant Room And Ceramic Tiles In Toilets. Balconies Will Be In Anti-Skid Ceramic Flooring
Wall Finishing DetailsGlazed Tiles Of Required Height In Toilets & 600MM Height Above Kitchen Counter Slab In Appropriate Colour & Paint
Kitchen DetailsAll Kitchen Counters In Pre-Polished Granite/ Marble Stone, Electrical Points For Kitchen Chimney & Hob, Washing Machine & Fridge To Be Provided. Kitchen Will Be Provided With Modular Cabinets Of Appropriate Finish
Bathroom FittingsPremium Sanitary Fixtures, Premium Chrome Plated Fittings
Doors And Windos FramesMain Entrance Doors – Plywood Frames With Polished Veneer On Top. All Internal Doors-Laminated Plywood Frames . Window Frames And Window Panels Of Aluminium/ Upvc Sections.
Electric FittingsProvision For Adequate Light & Power Points. Telephone & T.v. Outlets In Drawing, Dining And All Bedroom; Moulded Modular Plastic Switches & Protective Mcb's
Conducting And Wiring DetailsAll Electrical Wiring In Concealed Conduits
Lift DetailsLifts To Be Provided For Access To All Floors From Common Lobby
External GlazingsRefer Sr No 13.1
Windows/GlazingsWindow Panels Of Seasoned Hardwood/Aluminium/ Upvc Sections. All Hardware In Powder Coated Aluminium. Size And Section As Per Design Of The Architect
DoorsRefer Sr No 14.1 And 14.2
Main DoorsFlush Doors - Polished/Enamel Painted; Stainless Steel/ Brass Finished Hardware Fittings For Main Door & Aluminium Powder Coated Hardware Fitting And Locks Of Branded Makes
Internal DoorsFlush Doors - Polished/Enamel Painted
Electrical FittingsProvision For Adequate Light & Power Points. Telephone & T.v. Outlets In Drawing, Dining And All Bedroom; Moulded Modular Plastic Switches & Protective Mcb's
Provision Of Wifi And Broadband FacilityProvision Of Ftth Network
External Finishing/Colour SchemeAppropriate Finish Of Texture Paint Of Exterior Grade Water Proof Paint
Internal FinishingOil Bound Distemper Of Appropriate Colour On Interior Walls & Ceilings

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about ATS Grandstand Phase-1?