Antares By Rof
by Rof Infratech And Housing Private Limited · Village Sohna, Sector 7
- RERA registration
- GGM/1057/789/2026/29
- Registered on
- 13 Apr 2026
- Valid till
- 31 May 2032
- Project ID
- RERA-GRG-2107-2025
- Land area
- 11.119 acres
- Apartments
- 1,953 in 17 towers
- Completion (as filed)
- 31 Jan 2032
- Estimated cost
- ₹ 624.68 Cr
RERA registration
| Registration certificate | GGM/1057/789/2026/29, dated 13 Apr 2026 |
|---|---|
| Registration valid till | 31 May 2032 |
| Project ID | RERA-GRG-2107-2025 |
| Authority | HRERA Gurugram |
| Project type (as filed) | New |
| Project name | Antares By Rof |
| Promoter | Rof Infratech And Housing Private Limited |
| Promoter’s registered office | Real Estate |
| CIN | U70102DL2012PTC239356 |
| Site address | Village Sohna, Sector 7 |
| Sector | Sector 7 |
| Tehsil / District | Sohna / Gurugram |
| Layout plan approved | 15 Jul 2025 |
| Building plans approved | 15 Oct 2025 |
| Construction start (as filed) | 1 Feb 2026 |
| Completion (as filed) | 31 Jan 2032 |
| Application submitted | 27 Nov 2025 |
Authority, hearings & orders
- Application submitted online
- Notice sent to the promoter Dispatched
-
Hearing
Examination By Authority View order
Proceedings
THE MATTER TO COME UP ON 29.12.2025
-
Hearing
Adjournment View order
Proceedings
THE MATTER TO COME UP ON 05.01.2026.
-
Hearing
Adjournment View order
Proceedings
THE MATTER TO COME UP ON 19.01.2026
-
Hearing
Adjournment View order
Proceedings
Ar. Neeraj Gautam, Associate Architectural Executive and Sh. Ashish Dubey, Chartered Accountant briefed about the facts of the project. Sh. Tanish Bhutani (AR) is present on behalf of the promoter and requests 2 weeks’ time to submit the remaining deficiencies including the deposition of deficit fee. The Director of the promoter company is directed to appear before the Authority on the next date of hearing. The promoter is directed to rectify the remaining deficiencies including the deficit fee before the next date of hearing. No further opportunity shall be granted to the promoter. The matter to come up on 02.02.2026.
-
Hearing
Approved And Ready For Certificate Issuing Process View order
Proceedings
Ar. Neeraj Gautam, Associate Architectural Executive and Sh. Ashish Dubey, Chartered Accountant briefed about the facts of the project. Sh. Tanish Bhutani (AR) and Sh. Mangal Sain Mittal are present on behalf of the promoter and states that they are in the process of preparing the demand draft for deposition of deficit fee and will submit the same in the Authority before the issuance of the registration certificate along with the other deficit documents. The AR further undertakes that the approvals of fire scheme, service plans & estimates, electrical load availability and tree cutting permission will be submitted within a period of 4 months and mining permission before the commencement of excavation on site. Further, he undertakes to submit two Demand Drafts / Bank Guarantees amounting to Rs. 25 lakhs each, as a security deposit for timely submission of approved fire scheme and approved service plans and estimates. It is also expressly undertaken that in the event of failure to obtain and submit the aforesaid approvals within the stipulated time frames, the said security amount(s) shall be liable to be forfeited by the Authority. The Authority has taken note of the submissions made by the Authorized Representative of the promoter regarding the non-availability of the aforesaid statutory approvals as on date. In view of the aforesaid submission and undertaking made by the authorized representative of the promoter, the promoter is directed to submit of following approvals: a. Fire scheme: within 4 months from the date of grant of registration; b. Service Plans and Estimates: within 4 months from the date of grant of registration; c. Approved electrical load availability: within 4 months from the date of grant of registration; d. Tree cutting permission: within 4 months from the date of grant of registration; and e. Mining permission: before commencement of excavation on site In the event of non-submission of fire scheme approval and approved service plans & estimates within the prescribed time frame, the corresponding security amount shall stand forfeited by the Authority, and the failure to submit any of the above approvals/ permissions within the prescribed timeframe may also attract additional regulatory action as permissible under the Act of 2016, Rules and Regulations made thereunder. Approved as proposed subject to rectification of deficiencies mentioned above at S. No. 33. The Registration Certificate shall be issued after deposition of deficit fees and above BGs/DDs and submission of remaining deficiencies including the rectification of form REP-I and DPI.
- Registration granted GGM/1057/789/2026/29
- Certificate uploaded RC Uploaded
- Registration valid till
Land, licence & cost
| Land area of the project | 11.119 acres |
|---|---|
| Total licensed area | 11.119 acres |
| Licence | 182 0f 2024 |
| FAR permissible / proposed | 3.15 / 2.88 |
| Estimated project cost | ₹ 624.68 Cr |
| Cost of land | ₹ 144 Cr |
| Cost of construction | ₹ 408.72 Cr |
| Infrastructure and other structures | ₹ 29.62 Cr |
| EDC, taxes, levies and other costs | ₹ 42.35 Cr |
How the land will be used
| Use | Acres | Share |
|---|---|---|
| Land Area To Be Used For Construction Of Apartments | 3.614 | 32.5% |
| Construction Of Roads | 1.9 | 17.1% |
| Pavements | 0.6332 | 5.7% |
| Parks And Playgrounds | 0.5 | 4.5% |
| Green Belts | 1.02 | 9.2% |
| Vehicle Parkings | 1.927 | 17.3% |
| Electricity Sub-Station | 0.032 | 0.3% |
| Sewage And Solid Waste Treatment Facility | 0.005 | 0% |
| Community Centre And Creche | 0.102 | 0.9% |
| Commercial | 0.3368 | 3% |
| Construction Of Circulation Road | 1.02 | 9.2% |
| Guard Room | 0.003 | 0% |
| Underground Water Tank | 0.0064 | 0.1% |
| Rain Water Harvesting | 0.0193 | 0.2% |
Apartments 1,953 units · 17 towers
| Type | Carpet area (sq m) | Carpet area (sq ft) | Units |
|---|---|---|---|
| Apartment/Shops/Other Buildings | 113,227.41 | - | 1891 |
| Apartment/Shops/Other Buildings | 1,254.14 | 13,499 | 62 |
Areas are as filed with HRERA. Some rows show a total built-up area rather than one home’s carpet area, as entered by the promoter.
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | No | WATER SUPPLY |
| HSVP | Yes | ELECTRICITY |
| DHBVN | Yes | SEWAGE DISPOSAL |
| HSVP | Yes | STORM WATER DRAINAGE |
| HSVP | Yes | 4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report: |
| Sr. No. | Name of the facility | Estimated cost (In Lakhs)(Within the project area only) |
| Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C) | 1 | INTERNAL ROADS AND PAVEMENTS |
| 151.88 | AS PER PROJECT REPORT | 2 |
| Water Supply System | 151.87 | AS PER PROJECT REPORT |
| 3 | STORM WATER DRAINAGE | 117.36 |
| As Per Project Report | 4 | ELECTRICITY SUPPLY SYSTEM |
| 193.30 | AS PER PROJECT REPORT | 5 |
| Sewage Treatment & Garbage Disposal | 227.81 | AS PER PROJECT REPORT |
| 6 | STREET LIGHTING | 34.51 |
| As Per Project Report | 7 | SECURITY AND FIRE FIGHTING |
| 48.32 | AS PER PROJECT REPORT | 8 |
| Playgrounds And Parks | 36.00 | AS PER PROJECT REPORT |
| 9 | CLUB HOUSE/COMMUNITY CENTRE | 0 |
| As Per Project Report | 10 | SHOPPING AREA |
| 533.47 | AS PER PROJECT REPORT | 11 |
| Renewable Energy System | 21.50 | AS PER PROJECT REPORT |
| 12 | SCHOOL | 0 |
| As Per Project Report | 13 | HOSPITAL/DISPENSARY |
| 0 | AS PER PROJECT REPORT | 14 |
| Any Other | 0 | AS PER PROJECT REPORT |
| 15 | STP | 275 |
| As Per Project Report | 16 | UNDERGROUND WATER TANK |
| 105 | AS PER PROJECT REPORT | 17 |
| Rain Water Harvesting | 33 | AS PER PROJECT REPORT |
| 18 | CONSTRUCTION OF CIRCULATION ROAD | 38.62 |
| As Per Project Report | 19 | COMMUNITY CENTRE AND CRECHE |
| 204.26 | AS PER PROJECT REPORT | 5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed. |
| 15-07-2025 | (date) | 6. Date of approval of Building Plans |
| 15-10-2025 | (date) | 7. New projects: |
| i) Likely date of starting the construction work | 01-02-2026 | ii) Likely date of completing the project |
| 31-01-2032 | iii) Sizes of the plots to be offered in the project | Sr. No |
| Plot Area(In Square Meter) | Number of plots in the project | 1 |
| 0 | 0 | Total |
| 0 | iv. Type of apartments to be constructed in the project: | Type |
| Carpet area(In Square Meter) | Number of apartments | Number of towers |
| Apartment/Shops/Other Buildings | 113227.407 | 1891 |
| 17 | Apartment/Shops/Other Buildings | 1254.14 |
| 62 | 1 | (vi) Quarterly schedule of development of whole/remaining part of the project: |
| (c) Apartments/Shops/Other Buildings | Expenditure incurred till the date of application (In Lakhs) | Particulars |
| Expenditure | Apartments | 0 |
| Shops | 0 | Plots |
| 0 | Expenditure to be made in each quarter (In Lakhs) | Particulars |
| Year-2026 | Jan-Mar | Apr-June |
| July-Sep | Oct-Dec | Apartments |
| 313.16 | 626.09 | 1643.40 |
| 2006.32 | Shops | 0 |
| 0 | 0 | 0 |
| Plots | 0 | 0 |
| 0 | 0 | Particulars |
| Year-2027 | Jan-Mar | Apr-June |
| July-Sep | Oct-Dec | Apartments |
| 1952.46 | 2080.67 | 1872.21 |
| 1687.73 | Shops | 0 |
| 0 | 0 | 0 |
| Plots | 0 | 0 |
| 0 | 0 | Particulars |
| Year-2028 | Jan-Mar | Apr-June |
| July-Sep | Oct-Dec | Apartments |
| 1871.03 | 2109.54 | 2206.39 |
| 2326.46 | Shops | 0 |
| 0 | 0 | 0 |
| Plots | 0 | 0 |
| 0 | 0 | Particulars |
| Year-2029 | Jan-Mar | Apr-June |
| July-Sep | Oct-Dec | Apartments |
| 2394.54 | 2308.32 | 2470.48 |
| 2241.22 | Shops | 0 |
| 0 | 0 | 0 |
| Plots | 0 | 0 |
| 0 | 0 | Particulars |
| Year-2030 | Jan-Mar | Apr-June |
| July-Sep | Oct-Dec | Apartments |
| 2292.00 | 2142.65 | 1526.92 |
| 1514.11 | Shops | 0 |
| 0 | 0 | 0 |
| Plots | 0 | 0 |
| 0 | 0 | Particulars |
| Year-2031 | Jan-Mar | Apr-June |
| July-Sep | Oct-Dec | Apartments |
| 917.54 | 859.33 | 783.75 |
| 572.56 | Shops | 133.37 |
| 133.37 | 133.37 | 133.37 |
| Plots | 0 | 0 |
| 0 | 0 | Particulars |
| Year-2032 | Jan-Mar | Apr-June |
| July-Sep | Oct-Dec | Apartments |
| 152.69 | Shops | 0 |
| Plots | 0 | (d) Infrastructure |
| Expenditure incurred till the date of application (In Lakhs) | Particulars | Expenditure |
| Roads & Pavements | 0 | Water Supply System |
| 0 | Sewerage treatment & garbage disposal | 0 |
| Electricity Supply System | 0 | Storm Water Drainage |
| 0 | Parks and Playgrounds | 0 |
| Clubhouse/community centres | 0 | Shopping area |
| 0 | Other | 0 |
| Circulation Road | 0 | Community centres and Creche |
| 0 | Electrification Cost upto project Site | 0 |
| Rain Water Harvesting | 0 | Renewable Energy System |
| 0 | Security and Fire fighting | 0 |
| Stp | 0 | Street Light |
| 0 | Underground tank | 0 |
| Expenditure to be made in each quarter (In Lakhs) | Particulars | Year-2026 |
| Jan-Mar | Apr-June | July-Sep |
| Oct-Dec | Roads & Pavements | 0 |
| 0 | 0 | 0 |
| Water Supply System | 0 | 0 |
| 0 | 0 | Sewerage treatment & garbage disposal |
| 0 | 0 | 0 |
| 0 | Electricity Supply System | 0 |
| 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 |
| 0 | 0 | Parks and Playgrounds |
| 0 | 0 | 0 |
| 0 | Clubhouse/community centres | 0 |
| 0 | 0 | 0 |
| Shopping area | 0 | 0 |
| 0 | 0 | Other |
| 0 | 0 | 0 |
| 0 | Particulars | Year-2027 |
| Jan-Mar | Apr-June | July-Sep |
| Oct-Dec | Roads & Pavements | 0 |
| 0 | 0 | 0 |
| Water Supply System | 0 | 0 |
| 0 | 0 | Sewerage treatment & garbage disposal |
| 0 | 0 | 0 |
| 0 | Electricity Supply System | 0 |
| 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 |
| 0 | 0 | Parks and Playgrounds |
| 0 | 0 | 0 |
| 0 | Clubhouse/community centres | 0 |
| 0 | 0 | 0 |
| Shopping area | 0 | 0 |
| 0 | 0 | Other |
| 0 | 0 | 0 |
| 0 | Circulation Road | 0 |
| 0 | 0 | 0 |
| Rain Water Harvesting | 0 | 0 |
| 0 | 0 | Street light |
| 0 | 0 | 0 |
| 0 | Renewable Energy System | 0 |
| 0 | 0 | 0 |
| Security and Fire Fighting | 0 | 0 |
| 0 | 0 | STP |
| 0 | 0 | 0 |
| 0 | Underground Tank | 0 |
| 0 | 0 | 0 |
| Community center and Creche | 0 | 0 |
| 0 | 0 | Electrification cost upto project site |
| 0 | 0 | 0 |
| 0 | Particulars | Year-2028 |
| Jan-Mar | Apr-June | July-Sep |
| Oct-Dec | Roads & Pavements | 0 |
| 0 | 0 | 0 |
| Water Supply System | 7.59 | 7.59 |
| 7.59 | 7.59 | Sewerage treatment & garbage disposal |
| 0 | 0 | 0 |
| 0 | Electricity Supply System | 0 |
| 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 |
| 0 | 0 | Parks and Playgrounds |
| 0 | 0 | 0 |
| 0 | Clubhouse/community centres | 0 |
| 0 | 0 | 0 |
| Shopping area | 0 | 0 |
| 0 | 0 | Other |
| 0 | 0 | 0 |
| 0 | Electrification cost upto project site | 0 |
| 0 | 0 | 0 |
| Community center and Creche | 0 | 0 |
| 0 | 0 | Circulation Road |
| 0 | 0 | 0 |
| 0 | Underground Tank | 0 |
| 0 | 0 | 0 |
| Stp | 0 | 0 |
| 0 | 0 | Security and Fire Fighting |
| 0 | 0 | 0 |
| 0 | Renewable Energy System | 0 |
| 0 | 0 | 0 |
| Street light | 0 | 0 |
| 0 | 0 | Rain Water Harvesting |
| 0 | 0 | 0 |
| 0 | Particulars | Year-2029 |
| Jan-Mar | Apr-June | July-Sep |
| Oct-Dec | Roads & Pavements | 0 |
| 0 | 0 | 0 |
| Water Supply System | 7.59 | 7.59 |
| 7.59 | 7.59 | Sewerage treatment & garbage disposal |
| 0 | 0 | 0 |
| 0 | Electricity Supply System | 0 |
| 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 |
| 0 | 0 | Parks and Playgrounds |
| 0 | 0 | 0 |
| 0 | Clubhouse/community centres | 0 |
| 0 | 0 | 0 |
| Shopping area | 0 | 0 |
| 0 | 0 | Other |
| 0 | 0 | 0 |
| 0 | Rain Water Harvesting | 0 |
| 0 | 0 | 0 |
| Community center and Creche | 0 | 0 |
| 0 | 0 | Electrification cost upto project site |
| 0 | 0 | 0 |
| 0 | Circulation Road | 0 |
| 0 | 0 | 0 |
| Underground Tank | 0 | 0 |
| 0 | 0 | STP |
| 0 | 0 | 0 |
| 0 | Security and Fire Fighting | 0 |
| 0 | 4.83 | 4.83 |
| Renewable Energy System | 0 | 0 |
| 0 | 0 | Street light |
| 0 | 0 | 0 |
| 0 | Particulars | Year-2030 |
| Jan-Mar | Apr-June | July-Sep |
| Oct-Dec | Roads & Pavements | 15.18 |
| 15.18 | 15.18 | 22.78 |
| Water Supply System | 7.59 | 7.59 |
| 7.59 | 15.18 | Sewerage treatment & garbage disposal |
| 22.78 | 22.78 | 22.78 |
| 22.78 | Electricity Supply System | 0 |
| 19.33 | 19.33 | 28.99 |
| Storm Water Drainage | 0 | 11.73 |
| 17.60 | 17.60 | Parks and Playgrounds |
| 0 | 0 | 0 |
| 0 | Clubhouse/community centres | 0 |
| 0 | 0 | 0 |
| Shopping area | 0 | 0 |
| 0 | 0 | Other |
| 0 | 0 | 0 |
| 0 | Security and Fire Fighting | 4.83 |
Facilities in the service plan
| Facility | Estimated cost | Status |
|---|---|---|
| Internal Roads And Pavements | ₹ 1.52 Cr | As Per Project Report |
| Water Supply System | ₹ 1.52 Cr | As Per Project Report |
| Storm Water Drainage | ₹ 1.17 Cr | As Per Project Report |
| Electricity Supply System | ₹ 1.93 Cr | As Per Project Report |
| Sewage Treatment & Garbage Disposal | ₹ 2.28 Cr | As Per Project Report |
| Street Lighting | ₹ 34.51 lakh | As Per Project Report |
| Security And Fire Fighting | ₹ 48.32 lakh | As Per Project Report |
| Playgrounds And Parks | ₹ 36 lakh | As Per Project Report |
| Shopping Area | ₹ 5.33 Cr | As Per Project Report |
| Renewable Energy System | ₹ 21.5 lakh | As Per Project Report |
| Stp | ₹ 2.75 Cr | As Per Project Report |
| Underground Water Tank | ₹ 1.05 Cr | As Per Project Report |
| Rain Water Harvesting | ₹ 33 lakh | As Per Project Report |
| Construction Of Circulation Road | ₹ 38.62 lakh | As Per Project Report |
| Community Centre And Creche | ₹ 2.04 Cr | As Per Project Report |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| License | Already Been Obtained | 19 Jul 2024 |
| Forest Noc | Already Been Obtained | 16 Aug 2024 |
| Assurance Drinking Water | Already Been Obtained | 26 Oct 2024 |
| Assurance Storm Water | Already Been Obtained | 4 Nov 2024 |
| Assurance Sewarage | Already Been Obtained | 4 Nov 2024 |
| Layout Plan | Already Been Obtained | 15 Jul 2025 |
| Zoning Plan | Already Been Obtained | 26 Jul 2024 |
| Service Estimate | Already Been Obtained | 13 Feb 2026 |
Specifications (as filed)
| Flooring Details Of Various Parts Of House | Bedroom And Living Room- Vitrified Tile Floor, Toilet And Balcony- Antiskid Ceremic Tile, Kitchen Vitrified Tile |
|---|---|
| Wall Finishing Details | Putty + Primer+ 2 Coat Of Obd Paint |
| Kitchen Details | Ceramic Tile, Paint, Granite Marble And Sink |
| Bathroom Fittings | Cp Fitting And China Ware |
| Wood Work Etc | Main Door And Internal Door |
| Doors And Windos Frames | Aluminum/Upvc Door And Windows |
| Glass Work | External Aluminum/Upvc Door And Window |
| Electric Fittings | Switch Boards, Light Point, Fan Point |
| Conducting And Wiring Details | Pvc Conduit And Copper Wires |
| Water Storage | Overhead Water Tank |
| Lift Details | Two No. Of Lift Each Tower |
| External Glazings | Aluminum/Upvc |
| Windows/Glazings | Aluminum/Upvc |
| Doors | Wooden |
| Main Doors | Wooden |
| Internal Doors | Wooden |
| Electrical Fittings | Switches And Common Area Lights |
| Provision Of Wifi And Broadband Facility | Yes |
| External Finishing/Colour Scheme | Exterior Paint- Asian Paint Or Equivalent Brand |
| Internal Finishing | Putty + Primer+ 2 Coat Of Obd Paint |
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.




Questions about Antares By Rof?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.