HearingExamination By AuthorityView order Proceedings
THE MATTER ADJOURNED TO 22.06.2026
HearingApproved And Ready For Certificate Issuing ProcessView order Proceedings
Ar. Neeraj Gautam, Associate Architectural Executive and Sh. Ashish Dubey, Chartered Accountant briefed about the facts of the project. Sh. Rahul Mittal (AR) and Sh. Tanish Bhutani (AR) are present on behalf of the promoter. The Authorized Representative of the promoter states that presently the approvals of environmental clearance, service plans & estimates, fire scheme, electrification plan and road access permission are under process and have not yet been obtained as on date. Further, the AR of the promoter undertakes to obtain and submit: i. Environmental clearance, Approved Service Plans and Estimates and Approved fire scheme within 6 months from the date of grant of registration; ii. Electrification plan and Road access permission within 6 months from the date of grant of registration; iii. Tree cutting permission before cutting/felling of any trees on site; and iv. Mining permission before commencement of excavation at site. Further, he undertakes to submit three separate Demand Drafts/Bank Guarantees amounting to Rs. 25 lakhs each as a security deposit for timely compliance with the above requirements at point (i). It is also expressly undertaken that in the event of failure to obtain and submit the above approval(s) within the stipulated time frame, the said security amount(s) shall be liable to be forfeited by the Authority. The Authority has taken note of the submissions made by the Authorized Representative of the promoter regarding the non-availability of the aforesaid statutory approvals as on date. In view of the above, and in the interest of regulatory compliance, the Authority hereby directs that the promoter shall submit three Demand Drafts/Bank Guarantees amounting to Rs. 25,00,000/- (Rupees Twenty-Five Lakhs only) each in favour of the Authority, as security amounts for submission of Environmental clearance, Approved Service Plans and Estimates and Approved fire scheme within 6 months from the date of grant of registration. In the event of non-submission of the above approval(s) within the prescribed time frame, the corresponding security amount(s) shall stand forfeited by the Authority, and such failure may also attract additional regulatory action as permissible under the Act of 2016, Rules and Regulations made thereunder. Further, the promoter shall submit electrification plan and road access permission within 6 months from the date of grant of registration, tree cutting permission before cutting/felling of any trees on site and mining permission before commencement of excavation at site. Registration of the project is approved as proposed subject to rectification of deficiencies mentioned above at S. No. 33. The Registration Certificate shall be issued after submission of remaining deficiencies mentioned above at S. No. 33 including correction in form REP-I (Part A-H), Online DPI and submission of BGs/DDs of Rs. 25 lakhs each for submission of environmental clearance, approved service plan & estimates and approved fire scheme within the timeframe mentioned above.
Registration grantedGGM/1078/810/2026/50
Certificate uploadedRC Uploaded
Registration valid till
Land, licence & cost
Land area of the project
2.081 acres
Total licensed area
2.081 acres
Licence
129 OF 2024 DATED 24-10-2024
FAR permissible / proposed
2.4 / 2.398
Estimated project cost
₹ 204.19 Cr
Cost of land
₹ 72.91 Cr
Cost of construction
₹ 80.75 Cr
Infrastructure and other structures
₹ 17.77 Cr
EDC, taxes, levies and other costs
₹ 32.77 Cr
How the land will be used
Use
Sq m
Share
Land Area To Be Used For Construction Of Apartments
1,909.373
22.7%
Construction Of Roads
2,345.937
27.9%
Pavements
2,248.749
26.7%
Parks And Playgrounds
1,467.93
17.4%
Green Belts
130.34
1.5%
Vehicle Parkings
123.727
1.5%
Electricity Sub-Station
196
2.3%
Apartments 144 units · 2 towers
Type
Carpet area (sq m)
Carpet area (sq ft)
Units
Apartment/Shops/Other Buildings
18,236.47
-
142
Apartment/Shops/Other Buildings
695.27
7,484
2
Areas are as filed with HRERA. Some rows show a total built-up area rather than one home’s carpet area, as entered by the promoter.
External services
Service
Provided by
Approval taken
Roads
NHAI
No
Water Supply
HSVP
Yes
Electricity
DHBVN
No
Sewage Disposal
HSVP
Yes
Storm Water Drainage
HSVP
Yes
Facilities in the service plan
Facility
Estimated cost
Status
Internal Roads And Pavements
₹ 81.85 lakh
As Per Project Report
Water Supply System
₹ 2.15 Cr
As Per Project Report
Storm Water Drainage
₹ 67.29 lakh
As Per Project Report
Electricity Supply System
₹ 2.02 Cr
As Per Project Report
Sewage Treatment & Garbage Disposal
₹ 67.29 lakh
As Per Project Report
Street Lighting
₹ 10.76 lakh
As Per Project Report
Security And Fire Fighting
₹ 80.75 lakh
As Per Project Report
Playgrounds And Parks
₹ 10.76 lakh
As Per Project Report
Club House/Community Centre
₹ 2.04 Cr
As Per Project Report
Renewable Energy System
₹ 21.5 lakh
As Per Project Report
Hospital/Dispensary
₹ 15 lakh
As Per Project Report
Rain Water Harvesting
₹ 10 lakh
As Per Project Report
Stp
₹ 1 Cr
As Per Project Report
Underground Tank
₹ 1.05 Cr
As Per Project Report
Swimming Pool
₹ 38.62 lakh
As Per Project Report
Commercial
₹ 2.25 Cr
As Per Project Report
Electrification Cost Upto Project Site
₹ 2 Cr
As Per Project Report
Parking
₹ 30 lakh
As Per Project Report
Mess
₹ 25 lakh
As Per Project Report
Gymnasium
₹ 30 lakh
As Per Project Report
Laundary
₹ 30 lakh
As Per Project Report
Statutory approvals
Approval
Status
Date
License
Already Been Obtained
24 Oct 2024
Zoning Plan
Already Been Obtained
24 Oct 2024
Building Plan
Already Been Obtained
15 May 2026
Aai Noc
Already Been Obtained
7 Nov 2025
Specifications (as filed)
Flooring Details Of Various Parts Of House
Bedroom And Living Room- Vitrified Tile Floor, Toilet And Balcony- Antiskid Ceremic Tile, Kitchen Vitrified Tile
Wall Finishing Details
Putty + Primer+ 2 Coat Of Acrylic Emulsion Paint
Kitchen Details
Vitirfied Tile, Paint, Granite Marble And Sink And Modular Kitchen With Chimney And Hob
Bathroom Fittings
Cp Fitting And China Ware
Wood Work Etc
Main Door And Internal Door
Doors And Windos Frames
Aluminum/Upvc Door And Windows
Glass Work
External Aluminum/Upvc Door And Window With 5 Mm Toughned Glass
Electric Fittings
Switch Boards, Light Point, Fan Point
Conducting And Wiring Details
Pvc Conduit And Copper Wires
Water Storage
Overhead Water Tank
Lift Details
Two No. Of Lift Each Tower
External Glazings
Aluminum/Upvc
Windows/Glazings
Aluminum/Upvc
Doors
Wooden
Main Doors
Wooden
Internal Doors
Wooden
Electrical Fittings
Switches And Common Area Lights
Provision Of Wifi And Broadband Facility
Yes
External Finishing/Colour Scheme
Exterior Paint- Asian Paint Or Equivalent Brand
Internal Finishing
Putty + Primer+ 2 Coat Of Acrylic Emulsion
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Advik By Rof?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.