Registration validHRERA Gurugram

Ananta Vilasa 2.0

by Mnb Build Fab Private Limited · GH4 , Sector 28

RERA registration
GGM/947/679/2025/50
Registered on
14 May 2025
Valid till
31 Jul 2031
Project ID
RERA-GRG-1898-2025
Apartments
60 in 1 tower
Completion (as filed)
31 May 2032
Estimated cost
₹ 231.98 Cr

RERA registration

Registration certificateGGM/947/679/2025/50, dated 14 May 2025
Registration valid till31 Jul 2031
Project IDRERA-GRG-1898-2025
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameAnanta Vilasa 2.0
PromoterMnb Build Fab Private Limited
Promoter’s registered officePlot No. 5P, Second Floor, Golf Course Road, Sector 43, Gurugram, Haryana - 122001
CINU68200DL2023PTC422421
Site addressGH4 , Sector 28
SectorSector 28
Tehsil / DistrictWazirabad St / Gurugram
Building plans approved1 Apr 2025
Construction start (as filed)1 Aug 2025
Completion (as filed)31 May 2032
Application submitted2 Apr 2025

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Initial scrutinyFirst hearing
Next hearingNot Required
  1. Application submitted online
  2. Application received by HRERA Gurugram
  3. Notice sent to the promoter Dispatched
  1. Hearing Approved And Ready For Certificate Issuing Process View order
    Proceedings

    Ar. Neeraj Gautam (Associate Architectural Executive) and Sh. Ashish Dubey (Chartered Accountant) briefed the facts of the case. Sh. Ankit Chadha (AR), Sh. Pushpender Singh (AR) and Sh. Pradeep Bhatia (AR) are present on behalf of the promoter. Approved as proposed subject to submission of security amount of Rs. 25 lakhs on account of submission of fire scheme approval within 4 months and rectification of remaining deficiencies. The registration certificate shall be issued after the corrections in REP-I and DPI and rectification of remaining deficiencies listed at S. No. 28.

  2. Registration granted GGM/947/679/2025/50
  3. Certificate uploaded RC Uploaded
  1. Registration valid till

Land, licence & cost

LicenceN/A
FAR permissible / proposed512 / 400
Estimated project cost₹ 231.98 Cr
Cost of land₹ 59.32 Cr
Cost of construction₹ 112.64 Cr
Infrastructure and other structures₹ 23.22 Cr
EDC, taxes, levies and other costs₹ 3.92 Cr

How the land will be used

UseArea (as filed)Share
Land Area To Be Used For Construction Of Apartments0.56741.5%
Pavements0.22916.8%
Vehicle Parkings0.39528.9%
Electricity Sub-Station0.0141%
Club House0.15211.1%
Sewage And Solid Waste Treatment Facility0.010.7%

Apartments 60 units · 1 tower

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings155.861,67820
Apartment/Shops/Other Buildings157.151,69220
Apartment/Shops/Other Buildings154.091,65920

Areas are as filed with HRERA.

External services

ServiceProvided byApproval taken
RoadsNoWATER SUPPLY
GMDAYesELECTRICITY
DHBVNYesSEWAGE DISPOSAL
GMDAYesSTORM WATER DRAINAGE
GMDAYes4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:
Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)1INTERNAL ROADS AND PAVEMENTS
59.5AS PER PROJECT REPORT2
Water Supply System165.41AS PER PROJECT REPORT
3STORM WATER DRAINAGE59.5
As Per Project Report4ELECTRICITY SUPPLY SYSTEM
714AS PER PROJECT REPORT5
Sewage Treatment & Garbage Disposal165.41AS PER PROJECT REPORT
6STREET LIGHTING11.90
As Per Project Report7SECURITY AND FIRE FIGHTING
262.99AS PER PROJECT REPORT8
Playgrounds And Parks0AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0
As Per Project Report10SHOPPING AREA
0AS PER PROJECT REPORT11
Renewable Energy System97.02AS PER PROJECT REPORT
12SCHOOL0
As Per Project Report13HOSPITAL/DISPENSARY
0AS PER PROJECT REPORT14
Any Other0AS PER PROJECT REPORT
5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.NA(date)
6. Date of approval of Building Plans01-04-2025(date)
7. New projects:i) Likely date of starting the construction work01-08-2025
ii) Likely date of completing the project31-05-2032iii) Sizes of the plots to be offered in the project
Sr. NoPlot Area(In Square Meter)Number of plots in the project
100
Total0iv. Type of apartments to be constructed in the project:
TypeCarpet area(In Square Meter)Number of apartments
Number of towersApartment/Shops/Other Buildings155.86
201Apartment/Shops/Other Buildings
157.15201
Apartment/Shops/Other Buildings154.0920
1(vi) Quarterly schedule of development of whole/remaining part of the project:(c) Apartments/Shops/Other Buildings
Expenditure incurred till the date of application (In Lakhs)ParticularsExpenditure
Apartments0Shops
0Plots0
Expenditure to be made in each quarter (In Lakhs)ParticularsYear-2025
Jan-MarApr-JuneJuly-Sep
Oct-DecApartments451
Shops0Plots
0(d) InfrastructureExpenditure incurred till the date of application (In Lakhs)
ParticularsExpenditureRoads & Pavements
0Water Supply System0
Sewerage treatment & garbage disposal0Electricity Supply System
0Storm Water Drainage0
Parks and Playgrounds0Clubhouse/community centres
0Shopping area0
Other9Expenditure to be made in each quarter (In Lakhs)
ParticularsExpenditure to be made in each quarter (2025
)Apr-JuneJuly-Sep
Oct-DecJan-MarIt is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - DAccounts related information:
1. Annex copy of the balance sheet of last 3 yearsYes2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.
Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No3. Bank account to which the deposits received from apartment buyers will be credited
Bank and Branch addressICICI BANKBank Account number
777705832424IFSC codeICICI0000177
MICR code110229030Branch code
0001774. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Ankit Chadha - Shop No.3Ground
Floor Plot, 7/25 Kirti Nagar Ind.Area, Ramesh Nagar, West Delhi,India, 110015
5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)AttachedI hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - E
Details of the statutory approvals:1. Annex copies of the following in Folder E:i. Lay out Plan
Noii. Demarcation PlanYes
iii. Zoning PlanYesiv. Building Plan
YesSite PlanYes
Floor PlanYesApartment Plans
YesElevation SectionYes
Detail of Permissible FARYesDetail of covered area achieved FAR
Yes2. Annex copies of the following in Folder E:I. ROADS AND PAVEMENT PLAN
NoII. ELECTRICITY SUPPLY PLANNo
III. Water Supply PlanNoIV. SEWERAGE AND GARBAGE DISPOSAL PLAN
NoV. STROM WATER DRAINAGENo
Vi. 10% Land To Be Transferred To The Govt. For Community FacilityNoVII. STREET LIGHTING PLAN
NoVIII. PARKING PLANNo
3. Statutory Approvals StatusStatutory ApprovalsStatutory Approvals Status
DateI. ASSURANCE FOR SEWERAGE CONNECTION FORDISCHARGE OF 50 KLD SURPLUS DOMESTIC
Treated EffluentALREADY BEEN OBTAINED09-08-2024
II. Assurance For Storm Water ConnectionOF PROPOSED GROUP HOUSING PROJECTALREADY BEEN OBTAINED
08-08-2024III. NO OBJECTION CERTIFICATE FOR FIREALREADY BEEN OBTAINED
24-02-2024IV. ASSURANCE FOR SUPPLY OF 30 KLD STPTREATED WATER FOR CONSTRUCTION OF GROUP
Housing ProjectALREADY BEEN OBTAINED09-08-2024
V. Tree Cutting PermissionALREADY BEEN OBTAINED27-02-2024
Vi. Assurance For Water Supply 5 Kld ForDOMESTIC PURPOSEALREADY BEEN OBTAINED
08-08-2024VII. SITE ALLOTMENTALREADY BEEN OBTAINED
03-01-2024VIII. HSVP PERMISSION TO CREATE 3RD PARTY RIGHTALREADY BEEN OBTAINED
11-03-2025It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees.Signature _____________
Seal _____________Date _____________FORM REP-I
Part - F1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.(Annex a copy in Folder F)
Yes2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)(Annex a copy in Folder F)
Yes3. Gist of the important provisions of the Draft Agreement(Annex a copy in Folder F)
As per provision of RERAI hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - GProjects launched by the promoter in last five years:
1. Name and location of the projectANANTA VILASA2. Particulars of the project in brief:
i. Total area of the project0.8497ii. Total number of apartments
74iii. Total number of plots0
3. The number of plots/ apartments booked/sold to the allottees:(a) Apartments0
(b) Plots04. Details of the expenditure incurred upto date:
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project(Other than cost of land)19595.976
03614.397Cost of the apartments
12766.980504.134
Cost of the infrastructure1653.000
0Others costs5175.996
03110.2635. Total amount of money collected from current allottees of the apartments/ plots upto the date of filing this application.
0 Lakhs6. Remaining amount of sale price money to be collected from the current allottees of the apartments.0 Lakhs
7. Loan sanctioned by the banks/ other financial institutions against the project.0 Lakhs8. Amount drawn from the banks/ other financial institutions till the date of filing this application.
0 Lakhs9. Whether any litigation is pending against the Project:Yes/No
(If yes-give Annex details in folder G)No10. Initial date of completion of the project.
30-11-202911. Likely date of completion of the project.30-11-2029
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - H
Specification Of ConstructionSpecification of apartments and other buildings including the following:1
Flooring Details Of Various Parts Of HouseGOOD QUALITY ITALIAN STONE2
Wall Finishing DetailsGOOD QUALITY PLASTIC PAINT3
Kitchen DetailsMODULAR KITCHEN4
Bathroom FittingsCPVC FITTINGS5
Wood Work EtcYES6
Doors And Windos FramesGOOD QUALITY WOODEN AND UPVC7
Glass WorkAS PER BIS SPECIFICATIONS8
Electric FittingsAS PER BIS SPECIFICATIONS9
Conducting And Wiring DetailsAS PER BIS SPECIFICATIONS10
Cupboard DetailsAS PER BIS SPECIFICATIONS11
Water StorageAS PER BIS SPECIFICATIONS12
Lift DetailsTWO PASSENGER LIFTS & ONE SERVICE LIFT OF MAKE KONE/ EQUIVALENT13
External GlazingsUPVC & GLASS13.1
Windows/GlazingsUPVC & GLASS14
DoorsWOODEN DOORS AS PER BIS SPECIFICATIONS14.1
Main DoorsFLUSH DOORS WITH SUNMICA14.2
Internal DoorsFLUSH DOORS WITH SUNMICA15
Air ConditioningVRV, AS PER BIS SPECIFICATIONS16
Electrical FittingsAS PER BIS SPECIFICATIONS17
Cng Pipe LineNOT AVAILABLE18
Provision Of Wifi And Broadband FacilityYES19
External Finishing/Colour SchemeCEMENT BASED EXTERIOR PAINT20
Internal FinishingPLASTIC PAINTSPECIFICATION UNIT WISE
1 . Living/Dining/Foyer/Family Lounge1 . 1FLOOR
Good Quality Italian Stone1 . 2WALLS
Good Quality Plastic Paint1 . 3CEILING
Pop Ceiling2 . MASTER BEDROOM/DRESSROOM2 . 1
FloorGOOD QUALITY ITALIAN STONE2 . 2
WallsGOOD QUALITY PLASTIC PAINT2 . 3
CeilingGOOD QUALITY PLASTIC PAINT2 . 4
Modular WardrobesYES3 . MASTER TOILET
3 . 1FLOORTILE FLOORING
3 . 2WALLSWALL TILE
3 . 3CEILINGPOP FALSE CEILING
3 . 4COUNTERSYES
3 . 5SANITARY WARE/CP FITTINGSAS PER BIS SPECIFICATIONS
3 . 6FITTING/FIXTURESAS PER BIS SPECIFICATIONS
4 . Bed Rooms4 . 1FLOOR
Wooden Flooring4 . 2WALLS
Good Quality Plastic Paint4 . 3CEILING
Pop False Ceiling4 . 4WARDROBES
Yes5 . TOILET5 . 1
FloorTILE FLOORING5 . 2
WallsWALL TILE5 . 3
CeilingPOP FALSE CEILING5 . 4
CountersYES5 . 5
Sanitary Ware/Cp FittingsAS PER BIS SPECIFICATIONS5 . 6
FixturesAS PER BIS SPECIFICATIONS6 . KITCHEN
6 . 1FLOORGOOD QUALITY ITALIAN STONE
6 . 2WALLSGOOD QUALITY PLASTIC PAINT
6 . 3CEILINGPOP FALSE CEILING
6 . 4COUNTERSYES
6 . 5FIXTURESAS PER BIS SPECIFICATIONS
6 . 6KITCHEN APPLIANCESAS PER BIS SPECIFICATIONS
7 . Utility Rooms/Utility Balcony/Toilet7 . 1FLOOR
Tile Flooring7 . 2WALLS & CEILING
Wall Tile And Pop False Ceiling7 . 3TOILET
Yes7 . 4BALCONY
No8 . SIT-OUTS8 . 1
FloorGOOD QUALITY ITALIAN STONE8 . 2
Walls & CeilingGOOD QUALITY PLASTIC PAINT & WOODEN CEILING8 . 3
RailingsGLASS & STAINLESS STEEL8 . 4
FixturesSTAINLESS STEELI hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________List of Uploaded DocumentsSr. No.
Document DescriptionDate of Document UploadView Document
1NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT18-03-2025
View Document2COPY OF LICENSE ALONG WITH SCHEDULE OF LAND
19-03-2025View Document3
In Case Of Group Housing/ Commercial Sites, A Copy Of The Approved Site Plan19-03-2025View Document
4CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT01-04-2025
View Document5A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS
01-04-2025View Document6
Sewerage Connection Assurance23-05-2025View Document
7DEMARCATION PLAN23-05-2025
View Document8CLARIFICATION
23-05-2025View Document9
Basement Plan 123-05-2025View Document
10ELEVATION B23-05-2025
View Document11FIRST FLOOR PLAN
23-05-2025View Document12
In Case Of Plotted Colony, The Latest Layout Plan23-05-2025View Document
13ELEVATION C23-05-2025
View Document14ELEVATION D
23-05-2025View Document15
Storm Water Assurance23-05-2025View Document
16BASEMENT PLAN 223-05-2025
View Document17ALLOTTEE - CONVEYANCE DEED
23-05-2025View Document18
Aai Approval23-05-2025View Document
19SECTION A-A23-05-2025
View Document20STILT AND GROUND FLOOR PLAN
23-05-2025View Document21
Declaration Supported By Affidavit Duly Signed By The Promoter To Be Enclosed.23-05-2025View Document
2218TH FLOOR PLAN23-05-2025
View Document23SOURCE OF FUND
23-05-2025View Document24
Zoning Plan23-05-2025View Document
25SECTION B-B23-05-2025
View Document26ALLOTTEE- PAYMENT PLANS
23-05-2025View Document27
3 To 17 And 19 To 22 Typical Floor Plan23-05-2025View Document
28SECOND FLOOR PLAN23-05-2025
View Document29WATER PERMISSION
23-05-2025View Document30
Documents Relating To The Entry Of License And Collaboration Agreement In The Revenue Record23-05-2025View Document
31CASH FLOW STATEMENT OF THE PROPOSED PROJECT23-05-2025
View Document32ELEVATION A
23-05-2025View Document33
Tree Cutting Permission23-05-2025View Document
34TERRACE PLAN23-05-2025
View Document35ALLOTTEE- ALLOTMENT LETTER
23-05-2025View Document36
Bank Undertaking23-05-2025View Document
37ALLOTTEE- APPLICATION FORM23-05-2025
View Document38BASEMENT PLAN 3
23-05-2025View Document39
Allottee- Agreement For Sale23-05-2025View Document
40SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN23-05-2025
View DocumentI hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 59.5 lakhAs Per Project Report
Water Supply System₹ 1.65 CrAs Per Project Report
Storm Water Drainage₹ 59.5 lakhAs Per Project Report
Electricity Supply System₹ 7.14 CrAs Per Project Report
Sewage Treatment & Garbage Disposal₹ 1.65 CrAs Per Project Report
Street Lighting₹ 11.9 lakhAs Per Project Report
Security And Fire Fighting₹ 2.63 CrAs Per Project Report
Renewable Energy System₹ 97.02 lakhAs Per Project Report

Statutory approvals

ApprovalStatusDate
Assurance For Sewerage Connection ForDischarge Of 50 Kld Surplus Domestic

Specifications (as filed)

Flooring Details Of Various Parts Of HouseGood Quality Italian Stone
Wall Finishing DetailsGood Quality Plastic Paint
Kitchen DetailsModular Kitchen
Bathroom FittingsCpvc Fittings
Wood Work EtcYes
Doors And Windos FramesGood Quality Wooden And Upvc
Glass WorkAs Per Bis Specifications
Electric FittingsAs Per Bis Specifications
Conducting And Wiring DetailsAs Per Bis Specifications
Cupboard DetailsAs Per Bis Specifications
Water StorageAs Per Bis Specifications
Lift DetailsTwo Passenger Lifts & One Service Lift Of Make Kone/ Equivalent
External GlazingsUpvc & Glass
Windows/GlazingsUpvc & Glass
DoorsWooden Doors As Per Bis Specifications
Main DoorsFlush Doors With Sunmica
Internal DoorsFlush Doors With Sunmica
Air ConditioningVrv, As Per Bis Specifications
Electrical FittingsAs Per Bis Specifications
Cng Pipe LineNot Available
Provision Of Wifi And Broadband FacilityYes
External Finishing/Colour SchemeCement Based Exterior Paint
Internal FinishingPlastic Paint

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Ananta Vilasa 2.0?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.