LapsedHRERA Gurugram

Zara Roma

by Mega Infratech Private Limited · Sector-95B

RERA registration
GGM/582/314/2022/57
Registered on
27 Jun 2022
Valid till
6 Oct 2025
Project ID
RERA-GRG-1030-2022
Apartments
1,252
Completion (as filed)
6 Oct 2025
Estimated cost
₹ 337.17 Cr

(REGISTRATION SUSPENDED)

RERA registration

Registration certificateGGM/582/314/2022/57, dated 27 Jun 2022
Registration valid till6 Oct 2025
Project IDRERA-GRG-1030-2022
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameZara Roma
PromoterMega Infratech Private Limited
Promoter’s registered officeD-64, Defence Colony, New Delhi-110024
CINU99999DL2006PTC147586
Site addressSector-95B
SectorSector 95B
Tehsil / DistrictHarsaru St / Gurugram
Layout plan approved14 Feb 2022
Building plans approved14 Feb 2022
Construction start (as filed)7 Jun 2022
Completion (as filed)6 Oct 2025
Application submitted9 Mar 2022

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Initial scrutinyFirst Hearing
Next hearingNot Required
  1. Application submitted online
  2. Notice sent to the promoter Dispatched to AR
  3. Hearing Examination By Authority
    Proceedings

    Sh. Pawan Kumar (AR) is present on behalf of the promoter. Ms. Neeraj Gautam, Associate Architectural Executive briefed the facts of the case. The promoter is directed to submit the deficit documents in the authority before the next date of hearing. The matter to come up on 18.04.2022

  1. Hearing Adjournment
    Proceedings

    Ms. Neeraj Gautam, Associate Architectural Executive briefed the facts of the case. Sh. Rajeev Srivastava (GM), Sh. Daleep Kumar (CA), Sh. Pawan Kumar (PE) and Sh. Manoj Kumar (BE) are present on behalf of the promoter. The reply was submitted today which needs to be scrutinized. Accordingly, the matter to come up on 25.04.2022.

  2. Hearing Objection
    Proceedings

    Proceedings dated 25.04.2022 Ms. Neeraj Gautam, Associate Architectural Executive briefed the facts of the case. Sh.Rajiv Srivastava (GM) is present on behalf of the promoter. Corrections in Online DPI have been made by the promoter and the hard copy of the same is yet to be submitted. Corrections in Part C of REP-I are still pending. It is noted that exclusive charge by way of equitable mortgage on project land (undivided share) and building (Developer’s share) has been created and the sold and unsold receivables corresponding to the upcoming project have been hypothecated. Further, the collaboration agreement registered between the landowner and the developer is revocable. As per clause 32.1.c of the above agreement, “In the event after the allotment of flats in the Affordable Housing Project, the DEVELOPER doesn’t commence work on the said land for a period of 6 months or abandons the works, this agreement may be terminated at the sole option of the OWNER by issuing a written notice to DEVELOPER and on termination, the non-refundable amount of Rs. 5 crores paid by the DEVELOPER to OWNER shall stand forfeited. Any works done on the said land shall vest with the OWNER and the OWNER may take over the project and get the project completed, or the said land cleared, at the sole risk and cost of the DEVELOPER.” Keeping in view the above observations, the Authority decides that a show-cause notice be issued for rejection of the application for grant of registration under section 5 of the Act of 2016 and read with rule 5 of Haryana Rules, 2017. If the promoter has to say in this regard, an opportunity of hearing is given to the promoter on 30.05.2022. 

  3. Hearing Adjournment
    Proceedings

    Ms. Neeraj Gautam, Associate Architectural Executive briefed the facts of the case. Sh.Rajiv Srivastava (GM) is present on behalf of the promoter.Corrections in online DPI have been made by the promoter and the hard copy of the same is yet to be submitted. On request of the promoter, the hearing date for the registration of the project is preponed from 30.05.2022 to 23.05.2022. The promoter has made the application for the approval of the fire scheme and service plans and estimates in the concerned departments and the final approvals are still awaited. The promoter has also submitted an undertaking from the bank regarding not affecting the rights and interest of allottees as per section 11(4)(h) of Act, 2016 vide dak ID 32335 dated 10.05.2022.The promoter is directed to submit a bank guarantee of Rs 25 lakhs on account of the approved fire scheme and Rs. 25 lakhs on account of approved service plans and estimates in the Authority within one week from the date of grant of registration. The same shall be forfeited by the Authority, in case, the requisite documents are not submitted to the Authority within the stipulated time. The promoter has been directed to submit the status of submission of QPRs and compliance of Section 4(2)(l)(D) in respect of other registrations of the promoter and its associate companies within three days and the office to submit confirmed status on next date.Matter to come up for compliance on 30.05.2022.

  1. Hearing Adjournment
    Proceedings

    Ms. Neeraj Gautam, Associate Architectural Executive briefed the facts of the case. Sh. Rajeev Srivastava (GM (P)), Sh. Manoj Kumar (Billing Engineer), Sh. Karunesh Virmani and Sh. Ajay Bharti (Director) are  present on behalf of the promoter. Bank Guarantee amounting to Rs. 25 lakh is to be submitted as a guarantee to obtain service estimates and plan approval within three months otherwise bank guarantee shall be encashed/forfeited. A certificate from the concerned branch regarding submission of the annual audit report of project accounts in respect of projects registered till 31.03.2021 and QPRs of the projects of the promoter till last quarter is to be submitted.  The matter to come up on 06.06.2022.

  2. Hearing Adjournment
    Proceedings

    The Coram is incomplete. The matter is adjourned to 27.06.2022.

  3. Hearing Approved And Ready For Certificate Issuing Process
    Proceedings

    Ms. Neeraj Gautam, Associate Architectural Executive briefed the facts of the case. Sh. Karunesh Virmani and Sh. Ajay Bharti (Director) and Sh. Pawan Kumar (Project Engineer)  are  present on behalf of the promoter. During the last hearing, the promoter was asked to submit BGs of Rs. 25 lakh each for submission of pending approval of service plan and estimates as well as approval of fire plans. The Associate Architectural Executive confirms that the requisite BGs have been submitted to the Authority as per the above details. Further, the promoter was required to submit pending QPRs and annual audit reports in respect of the existing registered projects. The promoter submits that up-to-date QPRs of the existing project as well annual audit reports have been uploaded on the website as well hard copies submitted in the registry of Authority and a certificate of the concerned branch in charge has also been placed in the office file. The Associate Architectural Executive confirms that no other compliance is pending, and the case fulfills the requirement for the registration of the project, and accordingly the Authority decides to grant the registration. 

  1. Registration granted GGM/582/314/2022/57
  2. Certificate uploaded RC Uploaded
  3. Registration valid till

Land, licence & cost

Licence28 of 2020 (06-10-2025)
FAR permissible / proposed237 / 237
Estimated project cost₹ 337.17 Cr
Cost of land₹ 135.54 Cr
Cost of construction₹ 131.96 Cr
Infrastructure and other structures₹ 38.04 Cr
EDC, taxes, levies and other costs₹ 10.82 Cr

How the land will be used

UseArea (as filed)Share
Land Area To Be Used For Construction Of Apartments16,266.544.4%
Construction Of Roads679.061.9%
Parks And Playgrounds7,366.4920.1%
Vehicle Parkings11,597.0831.6%
Electricity Sub-Station764.862.1%

Apartments 1,252 units

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings51.99560300
Apartment/Shops/Other Buildings57.66621300
Apartment/Shops/Other Buildings59.98646600
Apartment/Shops/Other Buildings59.9964652

Areas are as filed with HRERA.

External services

ServiceProvided byApproval taken
RoadsNoWATER SUPPLY
GMDAYesELECTRICITY
DHBVNNoSEWAGE DISPOSAL
GMDAYesSTORM WATER DRAINAGE
GMDAYes4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:
Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)1INTERNAL ROADS AND PAVEMENTS
82.23YET TO BE PREPARED2
Water Supply System335YET TO BE PREPARED
3STORM WATER DRAINAGE68.92
Yet To Be Prepared4ELECTRICITY SUPPLY SYSTEM
600YET TO BE PREPARED5
Sewage Treatment & Garbage Disposal213.76YET TO BE PREPARED
6STREET LIGHTING34.77
Yet To Be Prepared7SECURITY AND FIRE FIGHTING
250YET TO BE PREPARED8
Playgrounds And Parks21.68YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE31.64
Yet To Be Prepared10SHOPPING AREA
780.13YET TO BE PREPARED11
Renewable Energy System60YET TO BE PREPARED
12SCHOOL0
Yet To Be Prepared13HOSPITAL/DISPENSARY
0YET TO BE PREPARED14
Any Other874.42YET TO BE PREPARED
5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.14-02-2022(date)
6. Date of approval of Building Plans14-02-2022(date)
7. New projects:i) Likely date of starting the construction work07-06-2022
ii) Likely date of completing the project06-10-2025iii) Sizes of the plots to be offered in the project
Sr. NoPlot Area(In Square Meter)Number of plots in the project
100
Total0iv. Type of apartments to be constructed in the project:
TypeCarpet area(In Square Meter)Number of apartments
Number of towersApartment/Shops/Other Buildings51.99
3000Apartment/Shops/Other Buildings
57.663000
Apartment/Shops/Other Buildings59.98600
0Apartment/Shops/Other Buildings59.99
520(vi) Quarterly schedule of development of whole/remaining part of the project:
(c) Apartments/Shops/Other BuildingsExpenditure incurred till the date of application (In Lakhs)Particulars
ExpenditureExpenditure to be made in each quarter (In Lakhs)Particulars
Year-2022Jan-MarApr-June
July-SepOct-DecApartments
59.62897.962011.29
Shops00
0Plots0
00Particulars
Year-2023Jan-MarApr-June
July-SepOct-DecApartments
2053.481707.871554.02
1357.15Shops0
000
Plots00
00Particulars
Year-2024Jan-MarApr-June
July-SepOct-DecApartments
1040.21931.71857.05
517.92Shops0
6.5236.67400.48
Plots00
00Construction of Community Building
008.56
27.55ParticularsYear-2025
Jan-MarApr-JuneJuly-Sep
Oct-DecApartments200.56
6.96Shops326.60
9.87Plots0
0Construction of Community Building26.33
0.84(d) InfrastructureExpenditure incurred till the date of application (In Lakhs)
ParticularsExpenditureExpenditure to be made in each quarter (In Lakhs)
ParticularsYear-2024Jan-Mar
Apr-JuneJuly-SepOct-Dec
Roads & Pavements25.8127.61
Water Supply System0161.98
Sewerage treatment & garbage disposal50.1480.93
Electricity Supply System00
Storm Water Drainage16.1726.09
Parks and Playgrounds1.3211.02
Clubhouse/community centres00
Shopping area00
Other00
Construction of Circular Road9.33Street Lighting
6.57ParticularsYear-2025
Jan-MarApr-JuneJuly-Sep
Oct-DecRoads & Pavements27.01
1.80Water Supply System165.66
7.36Sewerage treatment & garbage disposal79.17
3.52Electricity Supply System566.67
33.33Storm Water Drainage25.53
1.13Parks and Playgrounds9.34
0Clubhouse/community centres0
0Shopping area0
0Other0
0Security and Fire Fighting233.33
16.67Construction of Circular Road10.00
0.67Parking44.46
Stp829.96Street Lighting
28.20Renewable Energy60.00
It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - D
Accounts related information:1. Annex copy of the balance sheet of last 3 yearsYes
2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
3. Bank account to which the deposits received from apartment buyers will be creditedBank and Branch addressINDUSIND BANK LTD, DR. GOPAL DAS BHAWAN, BARAKHAMBA ROAD, NEW DELHI-110001
Bank Account number251702202201IFSC code
INDB0000005MICR code110234002
Branch code0000054. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)
Ajay Bharti5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)YES
I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________FORM REP-I
Part - EDetails of the statutory approvals:1. Annex copies of the following in Folder E:
i. Lay out PlanYesii. Demarcation Plan
Yesiii. Zoning PlanYes
iv. Building PlanYesSite Plan
YesFloor PlanYes
Apartment PlansYesElevation Section
YesDetail of Permissible FARYes
Detail of covered area achieved FARYes2. Annex copies of the following in Folder E:
I. Roads And Pavement PlanYesII. ELECTRICITY SUPPLY PLAN
NoIII. WATER SUPPLY PLANYes
IV. Sewerage And Garbage Disposal PlanYesV. STROM WATER DRAINAGE
YesVI. 10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYNo
Vii. Street Lighting PlanNoVIII. PARKING PLAN
Yes3. Statutory Approvals StatusStatutory Approvals
Statutory Approvals StatusDateI. LICENSE
Already Been Obtained08-10-2020II. ZONING PLAN
Already Been Obtained08-10-2020III. BUILDING PLAN
Already Been Obtained14-02-2022IV. ENVIRONMENT
ClearanceALREADY BEEN OBTAINED03-12-2021
V. Issuance Of Aravali ClearenceALREADY BEEN OBTAINED23-10-2019
Vi. Assurance For Sewerage ConnectionALREADY BEEN OBTAINED14-02-2022
Vii. Assurance Of Drinking WaterALREADY BEEN OBTAINED15-02-2022
Viii. Assurance For Supply Of 80 Kld Stp Treated Water For Construction PurposeALREADY BEEN OBTAINED14-02-2022
Ix. Assurance For Strom Water ConnectionALREADY BEEN OBTAINED17-02-2022
It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees.Signature _____________Seal _____________
Date _____________FORM REP-IPart - F
1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.(Annex a copy in Folder F)Yes
2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)(Annex a copy in Folder F)Yes
3. Gist of the important provisions of the Draft Agreement(Annex a copy in Folder F)I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - G
Projects launched by the promoter in last five years: (No Projects)I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________FORM REP-I
Part - HSPECIFICATION OF CONSTRUCTIONSpecification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSECEREMICTILE/VETRIFIED TILE
2WALL FINISHING DETAILSOBD PAINT
3KITCHEN DETAILSCEREMIC TILES,MARBLE AND PAINT
4BATHROOM FITTINGSEAUSET &
Equivalent5WOOD WORK ETC
Na6DOORS AND WINDOS FRAMES
Aluminium /UPVC /WOODEN
7GLASS WORKGOLD PLUS &
Equivalent8ELECTRIC FITTINGS
Anchor, Mk,L&T, GIRISH& EQUIVALENT
9CONDUCTING AND WIRING DETAILSPVC AND COPPER WIRING
10CUPBOARD DETAILSNA
11WATER STORAGEOVERHEAD AND UNDERGROUNDTANK
12LIFT DETAILSBRANDED
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSALUMINIUM/UPVC
14DOORSFLUSH DOORS/ SKIN DOORS
14.1MAIN DOORSFLUSH DOORS/ SKIN DOORS
14.2INTERNAL DOORSFLUSH DOORS
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSANCHOR, MK,
L&t, Girish& EQUIVALENT17
Cng Pipe LineNA18
Provision Of Wifi And Broadband FacilityNA19
External Finishing/Colour SchemeTEXTURE/EXTERNAL PAINT20
Internal FinishingOBD PAINTSPECIFICATION UNIT WISE
1 . Living/Dining/Foyer/Family Lounge1 . 1FLOOR
Ceremic Tile/ Vetrified Tile1 . 2WALLS
Obd Paint1 . 3CEILING
Obd Paint2 . MASTER BEDROOM/DRESSROOM2 . 1
FloorCEREMIC TILE/ VETRIFIED TILE2 . 2
WallsOBD PAINT2 . 3
CeilingOBD PAINT2 . 4
Modular WardrobesNA3 . MASTER TOILET
3 . 1FLOORCEREMIC GLAZED TILE
3 . 2WALLSCEREMIC TILE UP TO 4/7 FEET
3 . 3CEILINGFALSE CEILING
3 . 4COUNTERSN/A
3 . 5SANITARY WARE/CP FITTINGSEAUSET &
Equivalent3 . 6FITTING/FIXTURES
Eauset &EQUIVALENT4 . BED ROOMS
4 . 1FLOORCEREMIC TILE/ VETRIFIED TILE
4 . 2WALLSOBD PAINT
4 . 3CEILINGOBD PAINT
4 . 4WARDROBESN/A
5 . Toilet5 . 1FLOOR
Ceremic Glazed Tile5 . 2WALLS
Ceremic Tile Up To 4/7 Feet5 . 3CEILING
False Ceiling5 . 4COUNTERS
N/A5 . 5SANITARY WARE/CP FITTINGS
Eauset &EQUIVALENT5 . 6
FixturesEAUSET &EQUIVALENT
6 . Kitchen6 . 1FLOOR
Vetrified Tiles /Ceremic Tiles6 . 2WALLS
Obd Paint / Tile6 . 3CEILING
Obd Paint6 . 4COUNTERS
Marble6 . 5FIXTURES
Eauset &EQUIVALENT6 . 6
Kitchen AppliancesN/A7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1FLOORN/A
7 . 2WALLS & CEILINGN/A
7 . 3TOILETN/A
7 . 4BALCONYN/A
8 . Sit-Outs8 . 1FLOOR
N/A8 . 2WALLS & CEILING
N/A8 . 3RAILINGS
N/A8 . 4FIXTURES
N/AI hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
List of Uploaded DocumentsSr. No.Document Description
Date of Document UploadView Document1
Typical Floor And Area Calculation Tower-A&e05-03-2022View Document
2TERRACE FLOOR PLAN, OHT ROOM & OHT ROOM TERRACE TOWER-G,H,I & J05-03-2022
View Document3TYPICAL ELEVATION, SECTION TOWER-G, H, I, J & K
05-03-2022View Document4
Service Plans Showing The Services On The Layout Plan05-03-2022View Document
5TERRACE FLOOR PLAN, OHT ROOM & OHT ROOM TERRACE TOWER-F&K05-03-2022
View Document6TYPICAL ELEVATION, SECTION TOWER-L
05-03-2022View Document7
Copy Of License Along With Schedule Of Land05-03-2022View Document
8DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.05-03-2022
View Document9NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT
05-03-2022View Document10
Zoning Plan05-03-2022View Document
11DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD05-03-2022
View Document12CASH FLOW STATEMENT OF THE PROPOSED PROJECT
05-03-2022View Document13
Certificate From A Chartered Accountant Certifying That The Informstion Provided By The Applicant In Form Rep-1-C-X Is Correct As Per The Books Of Accounts/ Balance Sheet Of The Applicant05-03-2022View Document
14IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN05-03-2022
View Document15A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS
05-03-2022View Document16
Parking Plan05-03-2022View Document
17TYPICAL FLOOR AND AREA CALCULATION TOWER-B, C&D05-03-2022
View Document18TYPICAL FLOOR AND AREA CALCULATION TOWER-F&K
05-03-2022View Document19
Typical Floor And Area Calculation Tower-G,H,I & J05-03-2022View Document
20TOWER-L FLOOR PLAN & UNIT PLAN05-03-2022
View Document21STILT FLOOR AND AREA CALCULATION TOWER-A&E
05-03-2022View Document22
Stilt Floor And Area Calculation Tower-B,C&d05-03-2022View Document
23STILT FLOOR AND AREA CALCULATION TOWER-F&K05-03-2022
View Document24STILT FLOOR AND AREA CALCULATION TOWER-G,H,I & J
05-03-2022View Document25
Terrace Floor Plan, Oht Room & Oht Room Terrace Tower-A&e05-03-2022View Document
26TERRACE FLOOR PLAN, OHT ROOM & OHT ROOM TERRACE TOWER-B05-03-2022
View Document27TOWER-L TERRACE PLAN & OHT PLAN
05-03-2022View Document28
Typical Elevation, Section Tower-A&e05-03-2022View Document
29TYPICAL ELEVATION, SECTION TOWER-B,C & D05-03-2022
View Document30TYPICAL ELEVATION, SECTION TOWER-F & K
05-03-2022View Document31
Typical Elevation, Section Tower-L05-03-2022View Document
32TYPICAL ELEVATION, SECTION TOWER-G, H, I, J & K05-03-2022
View Document33TYPICAL ELEVATION, SECTION TOWER-A&E
05-03-2022View Document34
Typical Elevation, Section Tower-B, C & D05-03-2022View Document
35TYPICAL ELEVATION, SECTION TOWER-F & K05-03-2022
View Document36DEMARCATION PLAN
05-03-2022View Document37
Typical Floor Lvl Framing Plan Tower F & K18-04-2022View Document
38IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN18-04-2022
View Document39QUARTERLY PROGRESS & EXPENDITURE DETAIL
18-04-2022View Document40
Raft Foundation Plan Tower F & K18-04-2022View Document
41RAFT FOUNDATION PLAN TOWER G,H, I & J18-04-2022
View Document42SITE LANDSCAPE PLAN
18-04-2022View Document43
Typical Floor Lvl Framing Plan Tower G,H, I & J18-04-2022View Document
I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________Print

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 82.23 lakhYet To Be Prepared
Water Supply System₹ 3.35 CrYet To Be Prepared
Storm Water Drainage₹ 68.92 lakhYet To Be Prepared
Electricity Supply System₹ 6 CrYet To Be Prepared
Sewage Treatment & Garbage Disposal₹ 2.14 CrYet To Be Prepared
Street Lighting₹ 34.77 lakhYet To Be Prepared
Security And Fire Fighting₹ 2.5 CrYet To Be Prepared
Playgrounds And Parks₹ 21.68 lakhYet To Be Prepared
Club House/Community Centre₹ 31.64 lakhYet To Be Prepared
Shopping Area₹ 7.8 CrYet To Be Prepared
Renewable Energy System₹ 60 lakhYet To Be Prepared
Any Other₹ 8.74 CrYet To Be Prepared

Statutory approvals

ApprovalStatusDate
LicenseAlready Been Obtained8 Oct 2020
Zoning PlanAlready Been Obtained8 Oct 2020
Building PlanAlready Been Obtained14 Feb 2022
EnvironmentClearance

Specifications (as filed)

Flooring Details Of Various Parts Of HouseCeremictile/Vetrified Tile
Wall Finishing DetailsObd Paint
Kitchen DetailsCeremic Tiles,Marble And Paint
Bathroom FittingsEauset &

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Zara Roma?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.