Zara Roma
by Mega Infratech Private Limited · Sector-95B
- RERA registration
- GGM/582/314/2022/57
- Registered on
- 27 Jun 2022
- Valid till
- 6 Oct 2025
- Project ID
- RERA-GRG-1030-2022
- Apartments
- 1,252
- Completion (as filed)
- 6 Oct 2025
- Estimated cost
- ₹ 337.17 Cr
(REGISTRATION SUSPENDED)
RERA registration
| Registration certificate | GGM/582/314/2022/57, dated 27 Jun 2022 |
|---|---|
| Registration valid till | 6 Oct 2025 |
| Project ID | RERA-GRG-1030-2022 |
| Authority | HRERA Gurugram |
| Project type (as filed) | New |
| Project name | Zara Roma |
| Promoter | Mega Infratech Private Limited |
| Promoter’s registered office | D-64, Defence Colony, New Delhi-110024 |
| CIN | U99999DL2006PTC147586 |
| Site address | Sector-95B |
| Sector | Sector 95B |
| Tehsil / District | Harsaru St / Gurugram |
| Layout plan approved | 14 Feb 2022 |
| Building plans approved | 14 Feb 2022 |
| Construction start (as filed) | 7 Jun 2022 |
| Completion (as filed) | 6 Oct 2025 |
| Application submitted | 9 Mar 2022 |
Authority, hearings & orders
- Application submitted online
- Notice sent to the promoter Dispatched to AR
-
Hearing
Examination By Authority
Proceedings
Sh. Pawan Kumar (AR) is present on behalf of the promoter. Ms. Neeraj Gautam, Associate Architectural Executive briefed the facts of the case. The promoter is directed to submit the deficit documents in the authority before the next date of hearing. The matter to come up on 18.04.2022
-
Hearing
Adjournment
Proceedings
Ms. Neeraj Gautam, Associate Architectural Executive briefed the facts of the case. Sh. Rajeev Srivastava (GM), Sh. Daleep Kumar (CA), Sh. Pawan Kumar (PE) and Sh. Manoj Kumar (BE) are present on behalf of the promoter. The reply was submitted today which needs to be scrutinized. Accordingly, the matter to come up on 25.04.2022.
-
Hearing
Objection
Proceedings
Proceedings dated 25.04.2022 Ms. Neeraj Gautam, Associate Architectural Executive briefed the facts of the case. Sh.Rajiv Srivastava (GM) is present on behalf of the promoter. Corrections in Online DPI have been made by the promoter and the hard copy of the same is yet to be submitted. Corrections in Part C of REP-I are still pending. It is noted that exclusive charge by way of equitable mortgage on project land (undivided share) and building (Developer’s share) has been created and the sold and unsold receivables corresponding to the upcoming project have been hypothecated. Further, the collaboration agreement registered between the landowner and the developer is revocable. As per clause 32.1.c of the above agreement, “In the event after the allotment of flats in the Affordable Housing Project, the DEVELOPER doesn’t commence work on the said land for a period of 6 months or abandons the works, this agreement may be terminated at the sole option of the OWNER by issuing a written notice to DEVELOPER and on termination, the non-refundable amount of Rs. 5 crores paid by the DEVELOPER to OWNER shall stand forfeited. Any works done on the said land shall vest with the OWNER and the OWNER may take over the project and get the project completed, or the said land cleared, at the sole risk and cost of the DEVELOPER.” Keeping in view the above observations, the Authority decides that a show-cause notice be issued for rejection of the application for grant of registration under section 5 of the Act of 2016 and read with rule 5 of Haryana Rules, 2017. If the promoter has to say in this regard, an opportunity of hearing is given to the promoter on 30.05.2022.
-
Hearing
Adjournment
Proceedings
Ms. Neeraj Gautam, Associate Architectural Executive briefed the facts of the case. Sh.Rajiv Srivastava (GM) is present on behalf of the promoter.Corrections in online DPI have been made by the promoter and the hard copy of the same is yet to be submitted. On request of the promoter, the hearing date for the registration of the project is preponed from 30.05.2022 to 23.05.2022. The promoter has made the application for the approval of the fire scheme and service plans and estimates in the concerned departments and the final approvals are still awaited. The promoter has also submitted an undertaking from the bank regarding not affecting the rights and interest of allottees as per section 11(4)(h) of Act, 2016 vide dak ID 32335 dated 10.05.2022.The promoter is directed to submit a bank guarantee of Rs 25 lakhs on account of the approved fire scheme and Rs. 25 lakhs on account of approved service plans and estimates in the Authority within one week from the date of grant of registration. The same shall be forfeited by the Authority, in case, the requisite documents are not submitted to the Authority within the stipulated time. The promoter has been directed to submit the status of submission of QPRs and compliance of Section 4(2)(l)(D) in respect of other registrations of the promoter and its associate companies within three days and the office to submit confirmed status on next date.Matter to come up for compliance on 30.05.2022.
-
Hearing
Adjournment
Proceedings
Ms. Neeraj Gautam, Associate Architectural Executive briefed the facts of the case. Sh. Rajeev Srivastava (GM (P)), Sh. Manoj Kumar (Billing Engineer), Sh. Karunesh Virmani and Sh. Ajay Bharti (Director) are present on behalf of the promoter. Bank Guarantee amounting to Rs. 25 lakh is to be submitted as a guarantee to obtain service estimates and plan approval within three months otherwise bank guarantee shall be encashed/forfeited. A certificate from the concerned branch regarding submission of the annual audit report of project accounts in respect of projects registered till 31.03.2021 and QPRs of the projects of the promoter till last quarter is to be submitted. The matter to come up on 06.06.2022.
-
Hearing
Adjournment
Proceedings
The Coram is incomplete. The matter is adjourned to 27.06.2022.
-
Hearing
Approved And Ready For Certificate Issuing Process
Proceedings
Ms. Neeraj Gautam, Associate Architectural Executive briefed the facts of the case. Sh. Karunesh Virmani and Sh. Ajay Bharti (Director) and Sh. Pawan Kumar (Project Engineer) are present on behalf of the promoter. During the last hearing, the promoter was asked to submit BGs of Rs. 25 lakh each for submission of pending approval of service plan and estimates as well as approval of fire plans. The Associate Architectural Executive confirms that the requisite BGs have been submitted to the Authority as per the above details. Further, the promoter was required to submit pending QPRs and annual audit reports in respect of the existing registered projects. The promoter submits that up-to-date QPRs of the existing project as well annual audit reports have been uploaded on the website as well hard copies submitted in the registry of Authority and a certificate of the concerned branch in charge has also been placed in the office file. The Associate Architectural Executive confirms that no other compliance is pending, and the case fulfills the requirement for the registration of the project, and accordingly the Authority decides to grant the registration.
- Registration granted GGM/582/314/2022/57
- Certificate uploaded RC Uploaded
- Registration valid till
Land, licence & cost
| Licence | 28 of 2020 (06-10-2025) |
|---|---|
| FAR permissible / proposed | 237 / 237 |
| Estimated project cost | ₹ 337.17 Cr |
| Cost of land | ₹ 135.54 Cr |
| Cost of construction | ₹ 131.96 Cr |
| Infrastructure and other structures | ₹ 38.04 Cr |
| EDC, taxes, levies and other costs | ₹ 10.82 Cr |
How the land will be used
| Use | Area (as filed) | Share |
|---|---|---|
| Land Area To Be Used For Construction Of Apartments | 16,266.5 | 44.4% |
| Construction Of Roads | 679.06 | 1.9% |
| Parks And Playgrounds | 7,366.49 | 20.1% |
| Vehicle Parkings | 11,597.08 | 31.6% |
| Electricity Sub-Station | 764.86 | 2.1% |
Apartments 1,252 units
| Type | Carpet area (sq m) | Carpet area (sq ft) | Units |
|---|---|---|---|
| Apartment/Shops/Other Buildings | 51.99 | 560 | 300 |
| Apartment/Shops/Other Buildings | 57.66 | 621 | 300 |
| Apartment/Shops/Other Buildings | 59.98 | 646 | 600 |
| Apartment/Shops/Other Buildings | 59.99 | 646 | 52 |
Areas are as filed with HRERA.
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | No | WATER SUPPLY |
| GMDA | Yes | ELECTRICITY |
| DHBVN | No | SEWAGE DISPOSAL |
| GMDA | Yes | STORM WATER DRAINAGE |
| GMDA | Yes | 4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report: |
| Sr. No. | Name of the facility | Estimated cost (In Lakhs)(Within the project area only) |
| Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C) | 1 | INTERNAL ROADS AND PAVEMENTS |
| 82.23 | YET TO BE PREPARED | 2 |
| Water Supply System | 335 | YET TO BE PREPARED |
| 3 | STORM WATER DRAINAGE | 68.92 |
| Yet To Be Prepared | 4 | ELECTRICITY SUPPLY SYSTEM |
| 600 | YET TO BE PREPARED | 5 |
| Sewage Treatment & Garbage Disposal | 213.76 | YET TO BE PREPARED |
| 6 | STREET LIGHTING | 34.77 |
| Yet To Be Prepared | 7 | SECURITY AND FIRE FIGHTING |
| 250 | YET TO BE PREPARED | 8 |
| Playgrounds And Parks | 21.68 | YET TO BE PREPARED |
| 9 | CLUB HOUSE/COMMUNITY CENTRE | 31.64 |
| Yet To Be Prepared | 10 | SHOPPING AREA |
| 780.13 | YET TO BE PREPARED | 11 |
| Renewable Energy System | 60 | YET TO BE PREPARED |
| 12 | SCHOOL | 0 |
| Yet To Be Prepared | 13 | HOSPITAL/DISPENSARY |
| 0 | YET TO BE PREPARED | 14 |
| Any Other | 874.42 | YET TO BE PREPARED |
| 5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed. | 14-02-2022 | (date) |
| 6. Date of approval of Building Plans | 14-02-2022 | (date) |
| 7. New projects: | i) Likely date of starting the construction work | 07-06-2022 |
| ii) Likely date of completing the project | 06-10-2025 | iii) Sizes of the plots to be offered in the project |
| Sr. No | Plot Area(In Square Meter) | Number of plots in the project |
| 1 | 0 | 0 |
| Total | 0 | iv. Type of apartments to be constructed in the project: |
| Type | Carpet area(In Square Meter) | Number of apartments |
| Number of towers | Apartment/Shops/Other Buildings | 51.99 |
| 300 | 0 | Apartment/Shops/Other Buildings |
| 57.66 | 300 | 0 |
| Apartment/Shops/Other Buildings | 59.98 | 600 |
| 0 | Apartment/Shops/Other Buildings | 59.99 |
| 52 | 0 | (vi) Quarterly schedule of development of whole/remaining part of the project: |
| (c) Apartments/Shops/Other Buildings | Expenditure incurred till the date of application (In Lakhs) | Particulars |
| Expenditure | Expenditure to be made in each quarter (In Lakhs) | Particulars |
| Year-2022 | Jan-Mar | Apr-June |
| July-Sep | Oct-Dec | Apartments |
| 59.62 | 897.96 | 2011.29 |
| Shops | 0 | 0 |
| 0 | Plots | 0 |
| 0 | 0 | Particulars |
| Year-2023 | Jan-Mar | Apr-June |
| July-Sep | Oct-Dec | Apartments |
| 2053.48 | 1707.87 | 1554.02 |
| 1357.15 | Shops | 0 |
| 0 | 0 | 0 |
| Plots | 0 | 0 |
| 0 | 0 | Particulars |
| Year-2024 | Jan-Mar | Apr-June |
| July-Sep | Oct-Dec | Apartments |
| 1040.21 | 931.71 | 857.05 |
| 517.92 | Shops | 0 |
| 6.52 | 36.67 | 400.48 |
| Plots | 0 | 0 |
| 0 | 0 | Construction of Community Building |
| 0 | 0 | 8.56 |
| 27.55 | Particulars | Year-2025 |
| Jan-Mar | Apr-June | July-Sep |
| Oct-Dec | Apartments | 200.56 |
| 6.96 | Shops | 326.60 |
| 9.87 | Plots | 0 |
| 0 | Construction of Community Building | 26.33 |
| 0.84 | (d) Infrastructure | Expenditure incurred till the date of application (In Lakhs) |
| Particulars | Expenditure | Expenditure to be made in each quarter (In Lakhs) |
| Particulars | Year-2024 | Jan-Mar |
| Apr-June | July-Sep | Oct-Dec |
| Roads & Pavements | 25.81 | 27.61 |
| Water Supply System | 0 | 161.98 |
| Sewerage treatment & garbage disposal | 50.14 | 80.93 |
| Electricity Supply System | 0 | 0 |
| Storm Water Drainage | 16.17 | 26.09 |
| Parks and Playgrounds | 1.32 | 11.02 |
| Clubhouse/community centres | 0 | 0 |
| Shopping area | 0 | 0 |
| Other | 0 | 0 |
| Construction of Circular Road | 9.33 | Street Lighting |
| 6.57 | Particulars | Year-2025 |
| Jan-Mar | Apr-June | July-Sep |
| Oct-Dec | Roads & Pavements | 27.01 |
| 1.80 | Water Supply System | 165.66 |
| 7.36 | Sewerage treatment & garbage disposal | 79.17 |
| 3.52 | Electricity Supply System | 566.67 |
| 33.33 | Storm Water Drainage | 25.53 |
| 1.13 | Parks and Playgrounds | 9.34 |
| 0 | Clubhouse/community centres | 0 |
| 0 | Shopping area | 0 |
| 0 | Other | 0 |
| 0 | Security and Fire Fighting | 233.33 |
| 16.67 | Construction of Circular Road | 10.00 |
| 0.67 | Parking | 44.46 |
| Stp | 829.96 | Street Lighting |
| 28.20 | Renewable Energy | 60.00 |
| It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | FORM REP-I | Part - D |
| Accounts related information: | 1. Annex copy of the balance sheet of last 3 years | Yes |
| 2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D. | Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form. | No |
| 3. Bank account to which the deposits received from apartment buyers will be credited | Bank and Branch address | INDUSIND BANK LTD, DR. GOPAL DAS BHAWAN, BARAKHAMBA ROAD, NEW DELHI-110001 |
| Bank Account number | 251702202201 | IFSC code |
| INDB0000005 | MICR code | 110234002 |
| Branch code | 000005 | 4. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority) |
| Ajay Bharti | 5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details) | YES |
| I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative |
| Stamp _____________ | Date _____________ | FORM REP-I |
| Part - E | Details of the statutory approvals: | 1. Annex copies of the following in Folder E: |
| i. Lay out Plan | Yes | ii. Demarcation Plan |
| Yes | iii. Zoning Plan | Yes |
| iv. Building Plan | Yes | Site Plan |
| Yes | Floor Plan | Yes |
| Apartment Plans | Yes | Elevation Section |
| Yes | Detail of Permissible FAR | Yes |
| Detail of covered area achieved FAR | Yes | 2. Annex copies of the following in Folder E: |
| I. Roads And Pavement Plan | Yes | II. ELECTRICITY SUPPLY PLAN |
| No | III. WATER SUPPLY PLAN | Yes |
| IV. Sewerage And Garbage Disposal Plan | Yes | V. STROM WATER DRAINAGE |
| Yes | VI. 10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITY | No |
| Vii. Street Lighting Plan | No | VIII. PARKING PLAN |
| Yes | 3. Statutory Approvals Status | Statutory Approvals |
| Statutory Approvals Status | Date | I. LICENSE |
| Already Been Obtained | 08-10-2020 | II. ZONING PLAN |
| Already Been Obtained | 08-10-2020 | III. BUILDING PLAN |
| Already Been Obtained | 14-02-2022 | IV. ENVIRONMENT |
| Clearance | ALREADY BEEN OBTAINED | 03-12-2021 |
| V. Issuance Of Aravali Clearence | ALREADY BEEN OBTAINED | 23-10-2019 |
| Vi. Assurance For Sewerage Connection | ALREADY BEEN OBTAINED | 14-02-2022 |
| Vii. Assurance Of Drinking Water | ALREADY BEEN OBTAINED | 15-02-2022 |
| Viii. Assurance For Supply Of 80 Kld Stp Treated Water For Construction Purpose | ALREADY BEEN OBTAINED | 14-02-2022 |
| Ix. Assurance For Strom Water Connection | ALREADY BEEN OBTAINED | 17-02-2022 |
| It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees. | Signature _____________ | Seal _____________ |
| Date _____________ | FORM REP-I | Part - F |
| 1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers. | (Annex a copy in Folder F) | Yes |
| 2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules) | (Annex a copy in Folder F) | Yes |
| 3. Gist of the important provisions of the Draft Agreement | (Annex a copy in Folder F) | I hereby declare that the above information and particulars are based on record and are true to the |
| best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | FORM REP-I | Part - G |
| Projects launched by the promoter in last five years: (No Projects) | I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative |
| Stamp _____________ | Date _____________ | FORM REP-I |
| Part - H | SPECIFICATION OF CONSTRUCTION | Specification of apartments and other buildings including the following: |
| 1 | FLOORING DETAILS OF VARIOUS PARTS OF HOUSE | CEREMICTILE/VETRIFIED TILE |
| 2 | WALL FINISHING DETAILS | OBD PAINT |
| 3 | KITCHEN DETAILS | CEREMIC TILES,MARBLE AND PAINT |
| 4 | BATHROOM FITTINGS | EAUSET & |
| Equivalent | 5 | WOOD WORK ETC |
| Na | 6 | DOORS AND WINDOS FRAMES |
| Aluminium / | UPVC / | WOODEN |
| 7 | GLASS WORK | GOLD PLUS & |
| Equivalent | 8 | ELECTRIC FITTINGS |
| Anchor, Mk, | L&T, GIRISH | & EQUIVALENT |
| 9 | CONDUCTING AND WIRING DETAILS | PVC AND COPPER WIRING |
| 10 | CUPBOARD DETAILS | NA |
| 11 | WATER STORAGE | OVERHEAD AND UNDERGROUNDTANK |
| 12 | LIFT DETAILS | BRANDED |
| 13 | EXTERNAL GLAZINGS | NA |
| 13.1 | WINDOWS/GLAZINGS | ALUMINIUM/UPVC |
| 14 | DOORS | FLUSH DOORS/ SKIN DOORS |
| 14.1 | MAIN DOORS | FLUSH DOORS/ SKIN DOORS |
| 14.2 | INTERNAL DOORS | FLUSH DOORS |
| 15 | AIR CONDITIONING | NA |
| 16 | ELECTRICAL FITTINGS | ANCHOR, MK, |
| L&t, Girish | & EQUIVALENT | 17 |
| Cng Pipe Line | NA | 18 |
| Provision Of Wifi And Broadband Facility | NA | 19 |
| External Finishing/Colour Scheme | TEXTURE/EXTERNAL PAINT | 20 |
| Internal Finishing | OBD PAINT | SPECIFICATION UNIT WISE |
| 1 . Living/Dining/Foyer/Family Lounge | 1 . 1 | FLOOR |
| Ceremic Tile/ Vetrified Tile | 1 . 2 | WALLS |
| Obd Paint | 1 . 3 | CEILING |
| Obd Paint | 2 . MASTER BEDROOM/DRESSROOM | 2 . 1 |
| Floor | CEREMIC TILE/ VETRIFIED TILE | 2 . 2 |
| Walls | OBD PAINT | 2 . 3 |
| Ceiling | OBD PAINT | 2 . 4 |
| Modular Wardrobes | NA | 3 . MASTER TOILET |
| 3 . 1 | FLOOR | CEREMIC GLAZED TILE |
| 3 . 2 | WALLS | CEREMIC TILE UP TO 4/7 FEET |
| 3 . 3 | CEILING | FALSE CEILING |
| 3 . 4 | COUNTERS | N/A |
| 3 . 5 | SANITARY WARE/CP FITTINGS | EAUSET & |
| Equivalent | 3 . 6 | FITTING/FIXTURES |
| Eauset & | EQUIVALENT | 4 . BED ROOMS |
| 4 . 1 | FLOOR | CEREMIC TILE/ VETRIFIED TILE |
| 4 . 2 | WALLS | OBD PAINT |
| 4 . 3 | CEILING | OBD PAINT |
| 4 . 4 | WARDROBES | N/A |
| 5 . Toilet | 5 . 1 | FLOOR |
| Ceremic Glazed Tile | 5 . 2 | WALLS |
| Ceremic Tile Up To 4/7 Feet | 5 . 3 | CEILING |
| False Ceiling | 5 . 4 | COUNTERS |
| N/A | 5 . 5 | SANITARY WARE/CP FITTINGS |
| Eauset & | EQUIVALENT | 5 . 6 |
| Fixtures | EAUSET & | EQUIVALENT |
| 6 . Kitchen | 6 . 1 | FLOOR |
| Vetrified Tiles /Ceremic Tiles | 6 . 2 | WALLS |
| Obd Paint / Tile | 6 . 3 | CEILING |
| Obd Paint | 6 . 4 | COUNTERS |
| Marble | 6 . 5 | FIXTURES |
| Eauset & | EQUIVALENT | 6 . 6 |
| Kitchen Appliances | N/A | 7 . UTILITY ROOMS/UTILITY BALCONY/TOILET |
| 7 . 1 | FLOOR | N/A |
| 7 . 2 | WALLS & CEILING | N/A |
| 7 . 3 | TOILET | N/A |
| 7 . 4 | BALCONY | N/A |
| 8 . Sit-Outs | 8 . 1 | FLOOR |
| N/A | 8 . 2 | WALLS & CEILING |
| N/A | 8 . 3 | RAILINGS |
| N/A | 8 . 4 | FIXTURES |
| N/A | I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. |
| Signature of the Applicant / Authorised Representative | Stamp _____________ | Date _____________ |
| List of Uploaded Documents | Sr. No. | Document Description |
| Date of Document Upload | View Document | 1 |
| Typical Floor And Area Calculation Tower-A&e | 05-03-2022 | View Document |
| 2 | TERRACE FLOOR PLAN, OHT ROOM & OHT ROOM TERRACE TOWER-G,H,I & J | 05-03-2022 |
| View Document | 3 | TYPICAL ELEVATION, SECTION TOWER-G, H, I, J & K |
| 05-03-2022 | View Document | 4 |
| Service Plans Showing The Services On The Layout Plan | 05-03-2022 | View Document |
| 5 | TERRACE FLOOR PLAN, OHT ROOM & OHT ROOM TERRACE TOWER-F&K | 05-03-2022 |
| View Document | 6 | TYPICAL ELEVATION, SECTION TOWER-L |
| 05-03-2022 | View Document | 7 |
| Copy Of License Along With Schedule Of Land | 05-03-2022 | View Document |
| 8 | DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. | 05-03-2022 |
| View Document | 9 | NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT |
| 05-03-2022 | View Document | 10 |
| Zoning Plan | 05-03-2022 | View Document |
| 11 | DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD | 05-03-2022 |
| View Document | 12 | CASH FLOW STATEMENT OF THE PROPOSED PROJECT |
| 05-03-2022 | View Document | 13 |
| Certificate From A Chartered Accountant Certifying That The Informstion Provided By The Applicant In Form Rep-1-C-X Is Correct As Per The Books Of Accounts/ Balance Sheet Of The Applicant | 05-03-2022 | View Document |
| 14 | IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN | 05-03-2022 |
| View Document | 15 | A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS |
| 05-03-2022 | View Document | 16 |
| Parking Plan | 05-03-2022 | View Document |
| 17 | TYPICAL FLOOR AND AREA CALCULATION TOWER-B, C&D | 05-03-2022 |
| View Document | 18 | TYPICAL FLOOR AND AREA CALCULATION TOWER-F&K |
| 05-03-2022 | View Document | 19 |
| Typical Floor And Area Calculation Tower-G,H,I & J | 05-03-2022 | View Document |
| 20 | TOWER-L FLOOR PLAN & UNIT PLAN | 05-03-2022 |
| View Document | 21 | STILT FLOOR AND AREA CALCULATION TOWER-A&E |
| 05-03-2022 | View Document | 22 |
| Stilt Floor And Area Calculation Tower-B,C&d | 05-03-2022 | View Document |
| 23 | STILT FLOOR AND AREA CALCULATION TOWER-F&K | 05-03-2022 |
| View Document | 24 | STILT FLOOR AND AREA CALCULATION TOWER-G,H,I & J |
| 05-03-2022 | View Document | 25 |
| Terrace Floor Plan, Oht Room & Oht Room Terrace Tower-A&e | 05-03-2022 | View Document |
| 26 | TERRACE FLOOR PLAN, OHT ROOM & OHT ROOM TERRACE TOWER-B | 05-03-2022 |
| View Document | 27 | TOWER-L TERRACE PLAN & OHT PLAN |
| 05-03-2022 | View Document | 28 |
| Typical Elevation, Section Tower-A&e | 05-03-2022 | View Document |
| 29 | TYPICAL ELEVATION, SECTION TOWER-B,C & D | 05-03-2022 |
| View Document | 30 | TYPICAL ELEVATION, SECTION TOWER-F & K |
| 05-03-2022 | View Document | 31 |
| Typical Elevation, Section Tower-L | 05-03-2022 | View Document |
| 32 | TYPICAL ELEVATION, SECTION TOWER-G, H, I, J & K | 05-03-2022 |
| View Document | 33 | TYPICAL ELEVATION, SECTION TOWER-A&E |
| 05-03-2022 | View Document | 34 |
| Typical Elevation, Section Tower-B, C & D | 05-03-2022 | View Document |
| 35 | TYPICAL ELEVATION, SECTION TOWER-F & K | 05-03-2022 |
| View Document | 36 | DEMARCATION PLAN |
| 05-03-2022 | View Document | 37 |
| Typical Floor Lvl Framing Plan Tower F & K | 18-04-2022 | View Document |
| 38 | IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN | 18-04-2022 |
| View Document | 39 | QUARTERLY PROGRESS & EXPENDITURE DETAIL |
| 18-04-2022 | View Document | 40 |
| Raft Foundation Plan Tower F & K | 18-04-2022 | View Document |
| 41 | RAFT FOUNDATION PLAN TOWER G,H, I & J | 18-04-2022 |
| View Document | 42 | SITE LANDSCAPE PLAN |
| 18-04-2022 | View Document | 43 |
| Typical Floor Lvl Framing Plan Tower G,H, I & J | 18-04-2022 | View Document |
| I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative |
| Stamp _____________ | Date _____________ |
Facilities in the service plan
| Facility | Estimated cost | Status |
|---|---|---|
| Internal Roads And Pavements | ₹ 82.23 lakh | Yet To Be Prepared |
| Water Supply System | ₹ 3.35 Cr | Yet To Be Prepared |
| Storm Water Drainage | ₹ 68.92 lakh | Yet To Be Prepared |
| Electricity Supply System | ₹ 6 Cr | Yet To Be Prepared |
| Sewage Treatment & Garbage Disposal | ₹ 2.14 Cr | Yet To Be Prepared |
| Street Lighting | ₹ 34.77 lakh | Yet To Be Prepared |
| Security And Fire Fighting | ₹ 2.5 Cr | Yet To Be Prepared |
| Playgrounds And Parks | ₹ 21.68 lakh | Yet To Be Prepared |
| Club House/Community Centre | ₹ 31.64 lakh | Yet To Be Prepared |
| Shopping Area | ₹ 7.8 Cr | Yet To Be Prepared |
| Renewable Energy System | ₹ 60 lakh | Yet To Be Prepared |
| Any Other | ₹ 8.74 Cr | Yet To Be Prepared |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| License | Already Been Obtained | 8 Oct 2020 |
| Zoning Plan | Already Been Obtained | 8 Oct 2020 |
| Building Plan | Already Been Obtained | 14 Feb 2022 |
| Environment | Clearance |
Specifications (as filed)
| Flooring Details Of Various Parts Of House | Ceremictile/Vetrified Tile |
|---|---|
| Wall Finishing Details | Obd Paint |
| Kitchen Details | Ceremic Tiles,Marble And Paint |
| Bathroom Fittings | Eauset & |
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.




Questions about Zara Roma?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.