12A Floor, Tower 2 M3M International Financial Center, Sector-66, Gurgaon, Gurugram, Haryana
CIN
U70100HR2021PTC098078
Site address
Sector 69
Sector
Sector 69
Tehsil / District
Badshahpur St / Gurugram
Layout plan approved
27 Jan 2025
Building plans approved
27 Jan 2025
Construction start (as filed)
1 Feb 2025
Completion (as filed)
30 Apr 2033
Application submitted
24 Jan 2025
Authority, hearings & orders
Current statusApproved And Certificate Uploaded
Initial scrutinyFirst hearing on 17.02.2025
Next hearingNot Required
Application submitted online
HearingExamination By AuthorityProceedings
Sh. Shashank Sharma, Associate Engineer Executive and Ms. Asha, Chartered Accountant briefed about the facts of the case. Sh. Abhijeet Singh (AR), Sh. Manik Sharma (AR) and Sh. Bharat Vigmal (AR) are present on behalf of the promoter. The concerned AEE to visit the site and submit report regarding access to the site. Further, a status in tabular form w.r.t. each phase be prepared showing the number of DU’s, density covered area, ground coverage etc. vis a vis the earlier approval plan and now revised plan. The matter to come up on 24.02.2025.
HearingAdjournmentProceedings
Sh. Shashank Sharma, Associate Engineer Executive and Ms. Asha, Chartered Accountant briefed about the facts of the case. Sh. Abhijeet Singh (AR), Sh. Manik Sharma (AR) are present on behalf of the promoter and states that road access permission is not required as the project is well connnected to the 24m road which is functional and further connected to the 90m southern peripheral road. The Promoter had submitted the status in tabular form with respect to the number of DU’s, density covered area, ground coverage etc. vis a vis the earlier approved plan and revised plan and also states that there are no changes in the phase 1 as per the revised phasing plan. The DTCP has approved the revised phasing plan on 23.01.2025 and building plans of the phase – 5 and 5A on 27.01.2025 wherein approved TDR has been utilized. However, it is observed that there are no changes in the phase-1 after revision in the phasing plan and density of overall licensed colony has been increased due to utilization of increased TDR and also there are common services in the said licensed colony. In view of the same, Authority decided that a two weeks’ public notice be published in three prominent newspapers (2 English and one Hindi) intimating the revision in the phasing plan and common services in the said project. The matter to come up on 10.03.2025.
HearingApproved And Ready For Certificate Issuing ProcessProceedings
Sh. Shashank Sharma, Associate Engineer Executive and Ms. Asha, Chartered Accountant briefed about the facts of the case. Sh. Abhijeet Singh (AR), Sh. Manik Sharma (AR) are present on behalf of the promoter and states that fire scheme and service plan and estimates has been approved by the competent authorities. Further, the AR states that security deposit amount of Rs 25 lakhs each was submitted in the Authority to submit the approved fire scheme and approved service plan and estimates within 6 months. However, the same has been obtained now and further requests for the refund of money which was submitted as a security deposit. The public notice has been issued on 26.02.2025 in three newspapers for intimating the revision in the phasing plan and common services in the project against which no objections has been received in the Authority. The fire scheme has been approved vide memo no FS/2025/13 dated 04.03.2025 and service plans and estimates has been approved vide memo no LC-5319/JE(RK)/2025/8276 dated 10.03.2025. So, the gurantee amount of Rs 25 lakhs each submitted in the Authority vide DD no 509758, 509759 dated 13.02.2025 of ICICI bank to submit the approved fire scheme and approved service plans and estimates be refunded to the applicant promoter. Approved as proposed. The RC shall be issued after the submission of corrections in form A-H and DPI.
Registration grantedGGM/925/657/2025/28
Certificate uploadedRC Uploaded
Registration valid till
Land, licence & cost
Land area of the project
0.633 acres
Total licensed area
11.669 acres
Licence
90 of 2024 dated 18.07.2024
FAR permissible / proposed
5.12 / 4.98
Estimated project cost
₹ 1,917.71 Cr
Cost of land
₹ 557.7 Cr
Cost of construction
₹ 623.63 Cr
Infrastructure and other structures
₹ 25.09 Cr
EDC, taxes, levies and other costs
₹ 711.3 Cr
How the land will be used
Use
Acres
Share
Land Area To Be Used For Construction Of Apartments
Acylic Emulsion Paint / Oil Bound Distemper, Over Gypsum/Cement Plaster.
Kitchen Details
Stone Over Kitchen Counter, SS Sink
Bathroom Fittings
Cp Fiting & Chinaware
Wood Work Etc
As Per Interior Fittings
Doors And Windos Frames
Main Door - Modular Doors With Hardwares. Bed Rooms / Toilets / Kitchen Doors: - Doors With Hardwares.
Glass Work
Glass With Aluminium Frame Or Above
Electric Fittings
Led Type Fittings In Specified Area
Conducting And Wiring Details
Fr Wires, Heavy Duty Pvc Conduits.
Cupboard Details
N A
Water Storage
Ugwt & Ohwt
Lift Details
High Speed Elevators (Passenger & Service)
External Glazings
Upvc / Aluminium Double/Single Glazed Unit Doors & Windows
Windows/Glazings
Upvc / Aluminium Double/Single Glazed Unit Doors & Window
Doors
Bed Rooms / Toilets / Kitchen Doors: - Doors With Hardwares.
Main Doors
Main Door - Doors With Hardwares.
Internal Doors
Bed Rooms / Toilets / Kitchen Doors: - Doors With Hardwares.
Air Conditioning
Yes, In Specific Areas
Electrical Fittings
Common Area Light Fixtures
Cng Pipe Line
Provision Only
Provision Of Wifi And Broadband Facility
Provision Only
External Finishing/Colour Scheme
Exterior Weather Shield Paint (Texture / Plain)
Internal Finishing
As Stated Above
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.
Speak to an advisor
Questions about Trump Residences Gurgaon?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.
We use cookies only to run this site and remember your shortlist, compare list and preferences. Visits are counted anonymously. No advertising cookies. Privacy policy
Private advisory
Speak to a Triverse advisor
Share your details and a senior advisor will call you back shortly.