Registration validHRERA Gurugram

Trump Residences Gurgaon

by Riverday Infrastructure Private Limited · Sector 69

RERA registration
GGM/925/657/2025/28
Registered on
13 Mar 2025
Valid till
30 Sep 2032
Project ID
RERA-GRG-1850-2025
Land area
0.633 acres
Apartments
298 in 2 towers
Completion (as filed)
30 Apr 2033
Estimated cost
₹ 1,917.71 Cr

RERA registration

Registration certificateGGM/925/657/2025/28, dated 13 Mar 2025
Registration valid till30 Sep 2032
Project IDRERA-GRG-1850-2025
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameTrump Residences Gurgaon
PromoterRiverday Infrastructure Private Limited
Promoter’s registered office12A Floor, Tower 2 M3M International Financial Center, Sector-66, Gurgaon, Gurugram, Haryana
CINU70100HR2021PTC098078
Site addressSector 69
SectorSector 69
Tehsil / DistrictBadshahpur St / Gurugram
Layout plan approved27 Jan 2025
Building plans approved27 Jan 2025
Construction start (as filed)1 Feb 2025
Completion (as filed)30 Apr 2033
Application submitted24 Jan 2025

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Initial scrutinyFirst hearing on 17.02.2025
Next hearingNot Required
  1. Application submitted online
  2. Hearing Examination By Authority
    Proceedings

    Sh. Shashank Sharma, Associate Engineer Executive and Ms. Asha, Chartered Accountant briefed about the facts of the case. Sh. Abhijeet Singh (AR), Sh. Manik Sharma (AR) and Sh. Bharat Vigmal (AR) are present on behalf of the promoter. The concerned AEE to visit the site and submit report regarding access to the site. Further, a status in tabular form w.r.t. each phase be prepared showing the number of DU’s, density covered area, ground coverage etc. vis a vis the earlier approval plan and now revised plan. The matter to come up on 24.02.2025.

  3. Hearing Adjournment
    Proceedings

    Sh. Shashank Sharma, Associate Engineer Executive and Ms. Asha, Chartered Accountant briefed about the facts of the case. Sh. Abhijeet Singh (AR), Sh. Manik Sharma (AR) are present on behalf of the promoter and states that road access permission is not required as the project is well connnected to the 24m road which is functional and further connected to the 90m southern peripheral road. The Promoter had submitted the status in tabular form with respect to the number of DU’s, density covered area, ground coverage etc. vis a vis the earlier approved plan and revised plan and also states that there are no changes in the phase 1 as per the revised phasing plan. The DTCP has approved the revised phasing plan on 23.01.2025 and building plans of the phase – 5 and 5A on 27.01.2025 wherein approved TDR has been utilized. However, it is observed that there are no changes in the phase-1 after revision in the phasing plan and density of overall licensed colony has been increased due to utilization of increased TDR and also there are common services in the said licensed colony. In view of the same, Authority decided that a two weeks’ public notice be published in three prominent newspapers (2 English and one Hindi) intimating the revision in the phasing plan and common services in the said project. The matter to come up on 10.03.2025.

  1. Hearing Approved And Ready For Certificate Issuing Process
    Proceedings

    Sh. Shashank Sharma, Associate Engineer Executive and Ms. Asha, Chartered Accountant briefed about the facts of the case. Sh. Abhijeet Singh (AR), Sh. Manik Sharma (AR) are present on behalf of the promoter and states that fire scheme and service plan and estimates has been approved by the competent authorities. Further, the AR states that security deposit amount of Rs 25 lakhs each was submitted in the Authority to submit the approved fire scheme and approved service plan and estimates within 6 months. However, the same has been obtained now and further requests for the refund of money which was submitted as a security deposit. The public notice has been issued on 26.02.2025 in three newspapers for intimating the revision in the phasing plan and common services in the project against which no objections has been received in the Authority. The fire scheme has been approved vide memo no FS/2025/13 dated 04.03.2025 and service plans and estimates has been approved vide memo no LC-5319/JE(RK)/2025/8276 dated 10.03.2025. So, the gurantee amount of Rs 25 lakhs each submitted in the Authority vide DD no 509758, 509759 dated 13.02.2025 of ICICI bank to submit the approved fire scheme and approved service plans and estimates be refunded to the applicant promoter. Approved as proposed. The RC shall be issued after the submission of corrections in form A-H and DPI.

  2. Registration granted GGM/925/657/2025/28
  3. Certificate uploaded RC Uploaded
  1. Registration valid till

Land, licence & cost

Land area of the project0.633 acres
Total licensed area11.669 acres
Licence90 of 2024 dated 18.07.2024
FAR permissible / proposed5.12 / 4.98
Estimated project cost₹ 1,917.71 Cr
Cost of land₹ 557.7 Cr
Cost of construction₹ 623.63 Cr
Infrastructure and other structures₹ 25.09 Cr
EDC, taxes, levies and other costs₹ 711.3 Cr

How the land will be used

UseAcresShare
Land Area To Be Used For Construction Of Apartments0.63100%

Apartments 298 units · 2 towers

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings195.702,10690
Apartment/Shops/Other Buildings153.961,65790
Apartment/Shops/Other Buildings245.872,64748
Apartment/Shops/Other Buildings244.552,63250
Apartment/Shops/Other Buildings115.451,2438
Apartment/Shops/Other Buildings153.961,6572
Apartment/Shops/Other Buildings360.203,8774
Apartment/Shops/Other Buildings245.872,6472
Apartment/Shops/Other Buildings195.702,1062
Apartment/Shops/Other Buildings268.822,8942

Areas are as filed with HRERA.

External services

ServiceProvided byApproval taken
RoadsGMDANo
Water SupplyGMDAYes
ElectricityDHBVNYes
Sewage DisposalGMDAYes
Storm Water DrainageGMDAYes

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 3.87 CrAs Per Project Report
Water Supply System₹ 1.9 CrAs Per Project Report
Storm Water Drainage₹ 73.88 lakhAs Per Project Report
Electricity Supply System₹ 4.19 CrAs Per Project Report
Sewage Treatment & Garbage Disposal₹ 34.1 lakhAs Per Project Report
Street Lighting₹ 34.1 lakhAs Per Project Report
Security And Fire Fighting₹ 40.56 lakhAs Per Project Report
Playgrounds And Parks₹ 29.68 lakhAs Per Project Report
Stp₹ 59.48 lakhAs Per Project Report
Underground Tank₹ 34.1 lakhAs Per Project Report
Rain Water Harvesting₹ 98.19 lakhAs Per Project Report
Electrical Sub Station₹ 5.05 CrAs Per Project Report
Electrification₹ 3.07 CrAs Per Project Report
Consultancy₹ 1.48 CrAs Per Project Report
Infra Establishments₹ 1.19 CrAs Per Project Report
Png Works₹ 29.68 lakhAs Per Project Report

Statutory approvals

ApprovalStatusDate
Dtcp License No 90 Of 2024 Dated 18.07.2024Already Been Obtained18 Jul 2024
LoiAlready Been Obtained13 Mar 2024
Aai NocAlready Been Obtained14 Mar 2023
Forest NocAlready Been Obtained1 May 2024
Sewerage AssuranceAlready Been Obtained5 Jul 2024
Storm Water AssuranceAlready Been Obtained5 Jul 2024
Water Supply AssuranceAlready Been Obtained5 Jul 2024

Specifications (as filed)

Flooring Details Of Various Parts Of HouseMarble / Laminated Wooden Flooring / Vitrified Tiles / Ceramic Tile
Wall Finishing DetailsAcylic Emulsion Paint / Oil Bound Distemper, Over Gypsum/Cement Plaster.
Kitchen DetailsStone Over Kitchen Counter, SS Sink
Bathroom FittingsCp Fiting & Chinaware
Wood Work EtcAs Per Interior Fittings
Doors And Windos FramesMain Door - Modular Doors With Hardwares. Bed Rooms / Toilets / Kitchen Doors: - Doors With Hardwares.
Glass WorkGlass With Aluminium Frame Or Above
Electric FittingsLed Type Fittings In Specified Area
Conducting And Wiring DetailsFr Wires, Heavy Duty Pvc Conduits.
Cupboard DetailsN A
Water StorageUgwt & Ohwt
Lift DetailsHigh Speed Elevators (Passenger & Service)
External GlazingsUpvc / Aluminium Double/Single Glazed Unit Doors & Windows
Windows/GlazingsUpvc / Aluminium Double/Single Glazed Unit Doors & Window
DoorsBed Rooms / Toilets / Kitchen Doors: - Doors With Hardwares.
Main DoorsMain Door - Doors With Hardwares.
Internal DoorsBed Rooms / Toilets / Kitchen Doors: - Doors With Hardwares.
Air ConditioningYes, In Specific Areas
Electrical FittingsCommon Area Light Fixtures
Cng Pipe LineProvision Only
Provision Of Wifi And Broadband FacilityProvision Only
External Finishing/Colour SchemeExterior Weather Shield Paint (Texture / Plain)
Internal FinishingAs Stated Above

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Trump Residences Gurgaon?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.