RERA applied, not grantedHRERA Gurugram

Trevoc Royal Residences

by Jhs Estate Private Limited · Sector 56, Urban Estate Gurgaon II, Haryana

RERA registration
Applied, not granted yet
Applied on
14 May 2024
Application status
Return
Project ID
RERA-GRG-1621-2024
Land area
2.059 acres
Apartments
172 in 2 towers
Completion (as filed)
8 May 2030
Estimated cost
₹ 589.78 Cr

This project has applied for RERA registration but has not been granted it yet. Under RERA it cannot be advertised, marketed or sold until it is registered.

RERA registration

Registration certificateNot issued yet: the application is being processed by HRERA Gurugram
Project IDRERA-GRG-1621-2024
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameTrevoc Royal Residences
PromoterJhs Estate Private Limited
Promoter’s registered officeSpaze Business Park,
CINU68100DL2023PTC412322
Site addressSector 56, Urban Estate Gurgaon II, Haryana
SectorSector 56
Tehsil / DistrictGurgaon / Gurugram
Construction start (as filed)8 Aug 2024
Completion (as filed)8 May 2030
Application submitted14 May 2024

Authority, hearings & orders

Current statusReturn
Initial scrutinyFirst hearing
Next hearingNot Required
  1. Application submitted online
  2. Hearing Return View order
    Proceedings

    Sh. Ashish Kush, Planning Executive briefed about the facts of the case. Ms. Tanya (AR) is present on behalf of the promoter. The promoter has applied for registration u/s 4 of the Act of 2016 but the approval of building plan are not submitted alongwith the application. Therefore, in the absence of approved building plan in the file further process could not be initiated. In view of the same, the Authority decides to return the application of the promoter alongwith the fee submitted with the direction to submit the file a fresh after obtaining building plans approval from the competent Authority.

Land, licence & cost

Land area of the project2.059 acres
Total licensed area2.059 acres
LicenceLand allotted by HSVP through LOI Endst No. ZO002/EO018/UE029/LALOT/0000000385
FAR permissible / proposed4.12 / 4.12
Estimated project cost₹ 589.78 Cr
Cost of land₹ 149.12 Cr
Cost of construction₹ 284.33 Cr
Infrastructure and other structures₹ 27.97 Cr
EDC, taxes, levies and other costs₹ 128.35 Cr

How the land will be used

UseSq mShare
Land Area To Be Used For Construction Of Apartments3,415.46241%
Construction Of Roads2,338.2928.1%
Parks And Playgrounds808.9599.7%
Green Belts499.1516%
Electricity Sub-Station47.0620.6%
Any Other100.771.2%
Guard30.9680.4%
Commercial1,057.63912.7%
Rain Water Harvesting35.9890.4%

Apartments 172 units · 2 towers

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings125.661,3534
Apartment/Shops/Other Buildings125.661,35384
Apartment/Shops/Other Buildings169.701,82776
Apartment/Shops/Other Buildings144.831,5594
Apartment/Shops/Other Buildings331.153,5644

Areas are as filed with HRERA.

External services

ServiceProvided byApproval taken
RoadsCONNECTED ROAD THROUGH HUDANo
Water SupplyHSVP (ASSURANCE GRANTED)Yes
ElectricityDHBVNYes
Sewage DisposalHSVPNo
Storm Water DrainageHSVP (ASSURANCE GRANTED)Yes

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 5.66 CrAs Per Project Report
Water Supply System₹ 39.06 lakhAs Per Project Report
Storm Water Drainage₹ 31.25 lakhAs Per Project Report
Electricity Supply System₹ 10.41 CrAs Per Project Report
Street Lighting₹ 15 lakhAs Per Project Report
Security And Fire Fighting₹ 3.86 CrAs Per Project Report
Playgrounds And Parks₹ 2.87 CrAs Per Project Report
Renewable Energy System₹ 31.5 lakhAs Per Project Report
Any Other₹ 65.72 lakhAs Per Project Report
Sewerage System₹ 23.43 lakhYet To Be Prepared
Stp₹ 55.5 lakhYet To Be Prepared
Underground Water Tank₹ 1.41 CrYet To Be Prepared
Rain Water Harvesting₹ 23.43 lakhYet To Be Prepared
Electrical Sub Station₹ 90 lakhYet To Be Prepared

Statutory approvals

ApprovalStatusDate
No Objection Certificate For Height ClearanceAlready Been Obtained26 Feb 2024
Assurance For Drinking Water Supply, Sewer Connection And Storm Water ConnectionAlready Been Obtained7 Feb 2024
Noc For Use Of Treated Waste Water For Construction ActivitiesAlready Been Obtained13 Feb 2024
Grant Of Permission For Transfer Of Tdr CertificatesAlready Been Obtained27 Dec 2023
Assurance Certificate Of DHBVN For Power SupplyAlready Been Obtained22 Feb 2024
Green Rating For Integrated Habitat AssessmentAlready Been Obtained22 Feb 2024
Request For Reducing Of Minimum SetbacksAlready Been Obtained20 Feb 2024
Site Co-Ordinates In Wgs 84 And Site Elevation CertificateAlready Been Obtained13 Feb 2024
Tree Cutting PermissionAlready Been Obtained5 Feb 2024
Approval For No Encroachment On Site, No Litigation On Site, No Ht Line Passing Over The Site, No Haryana City Gas Distribution Pipeline Passing Over Or Under The Site, No Effect Of Plpa Act On Site, No Effect Of Aravali Notification, No Forest Land On Site, No Effect Of Natural Conservation Zone.Already Been Obtained2 Feb 2024
Site PlansApplied For But Yet To Receive15 Mar 2024

Specifications (as filed)

Flooring Details Of Various Parts Of HouseItalian/ Imported Marble/ Vitrified Tile/ Laminate Wooden Flooring/ Antiskid Vitrified
Wall Finishing DetailsPlaster + Dado Up To 7FT In Vitrified Tile
Kitchen DetailsWalls: Plaster + Dado Above Counter Up To 2FT High In Vitrified Tile
Doors And Windos FramesHardwood Door Frame With Flush Door/Laminate Or Skin Door Panels
Glass WorkUpvc / Aluminium Framed Single/Double Glazing Unit As Per Heat Load And As Per Design
Conducting And Wiring Details1.5 Sqmm - 4 Sqmm Frls Copper Wiring
External GlazingsUpvc / Aluminium Framed Single/Double Glazing Unit As Per Heat Load And As Per Design
Windows/GlazingsUpvc / Aluminium Framed Single/Double Glazing Unit As Per Heat Load And As Per Design
DoorsWooden Frame With Flush Door With Veneer / Laminate Finish (On Both Sides) & Architraves
Main DoorsWooden Frame With Flush Door With Veneer / Laminate Finish (On Both Sides) & Architraves
Internal DoorsWooden Frame With Flush Door With Veneer / Laminate Finish (On Both Sides) & Architraves
Electrical FittingsProvision Only
Provision Of Wifi And Broadband FacilityThrough Ftth System

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Trevoc Royal Residences?

This project has applied for RERA but is not registered yet. An advisor can tell you what that means for booking, and suggest registered alternatives nearby. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.