Registration period overHRERA GurugramInterim ReraOC / CC on record

The Heartsong

by Experion Developers Pvt. Ltd. · Sector 108, Gurugram

RERA registration
306 OF 2017
Registered on
17 Oct 2017
Valid till
16 Oct 2018
Project ID
RERA-GRG-1142-2022
Land area
4.389 acres
Apartments
130 in 1 tower
Completion (as filed)
16 Oct 2018
Estimated cost
₹ 119.4 Cr

RERA registration

Registration certificate306 OF 2017, dated 17 Oct 2017
Registration valid till16 Oct 2018
Project IDRERA-GRG-1142-2022
AuthorityHRERA Gurugram (Interim Rera)
Project type (as filed)New
Project nameThe Heartsong
PromoterM/S Experion Developers Private Limited
Promoter’s registered officeF-9, First Floor, Manish Plaza-1, Plot No. 7, Mlu, Sector 10, Dwarka, New Delhi -110075
CINU70109DL2006FTC151343
Site addressVillage Dharampur, Sector 108, Gurugram, Haryana
SectorSector 108
Tehsil / DistrictKadipur St / Gurugram
Layout plan approved18 Sep 2012
Building plans approved18 Sep 2012
Construction start (as filed)17 Oct 2017
Completion (as filed)16 Oct 2018
Application submitted26 Aug 2022

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Next hearingNot Required
  1. Registration granted 306 OF 2017
  2. Registration valid till
  3. Application submitted online

Land, licence & cost

Land area of the project4.389 acres
Total licensed area15.025 acres
LicenceLicense No. 38 of 2010
FAR permissible / proposed1.75 / 0.098
Estimated project cost₹ 119.4 Cr
Cost of land₹ 11.69 Cr
Cost of construction₹ 84.77 Cr
EDC, taxes, levies and other costs₹ 22.94 Cr

How the land will be used

UseAcresShare
Land Area To Be Used For Construction Of Apartments4.389100%

Apartments 130 units · 1 tower

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings71,518.44-52
Apartment/Shops/Other Buildings66,119.14-39
Apartment/Shops/Other Buildings66,119.14-39

Areas are as filed with HRERA. Some rows show a total built-up area rather than one home’s carpet area, as entered by the promoter.

External services

ServiceProvided byApproval taken
RoadsNHAINo
Water SupplyGMDAYes
ElectricityDHBVNYes
Sewage DisposalGMDAYes
Storm Water DrainageGMDAYes

Statutory approvals

ApprovalStatusDate
Lisense Approval (Lisense No 38 Of 2010)Already Been Obtained14 May 2010
Building Plan ApprovalAlready Been Obtained18 Sep 2012
Environment Clearance ApprovalAlready Been Obtained8 Oct 2012
Airport Height Clearance ApprovalAlready Been Obtained27 Jan 2012
Service Plan Estimate ApprovalAlready Been Obtained4 Apr 2013
Forest NocAlready Been Obtained8 May 2012
Occupation CertificateAlready Been Obtained19 Dec 2017
HUDA Construction Water NocAlready Been Obtained23 Feb 2012
Mining ApprovalAlready Been Obtained7 Mar 2014

Specifications (as filed)

Flooring Details Of Various Parts Of HouseGood Quality Vitrified Tiles, Laminated Wooden Flooring, Ceramic Tiles, Imported And Indian Marble Etc.
Wall Finishing DetailsGvp With Obd Paint, Ceramic Tiles In Toilets, Exterior Grade Texture Paint On Exterior, Marble In Lift Jambs As Per Design.
Kitchen DetailsGranite Counter And Sink Provided.
Bathroom FittingsCp Fittings And Sanitary Fixtures Provided.
Doors And Windos FramesHard Wood Door Frame Skin Moulded Door With Enamel Paint As Applicable /Layout, Main Entry Door Factory Pressed Veneered Flush Door, External Doors And Window In Powder Coated Aluminium With Glass.
Electric FittingsProvided As Per Requirement
Conducting And Wiring DetailsProvided As Per Requirement
Water StorageSufficient Tanks As Per Approved Service Estimate Provided.
Lift Details2 Nos. 13 Passengers Have Been Installed In Each Tower.
External GlazingsPowder Coated Aluminium With Clear Glass.
Windows/GlazingsPowder Coated Aluminium With Clear Glass.
DoorsMain Entry Door Factory Pressed Veneered Flush Door.
Main DoorsMain Entry Door Factory Pressed Veneered Flush Door.
Internal DoorsSkin Moulded Door With Enamel Paint
Air Conditioning3 And 5 Star Rated Toshiba Make Split Air Conditioners In Living, Dinning, All Bed Rooms.
Electrical FittingsProvided As Per Requirement
Cng Pipe LineNot Provided
External Finishing/Colour SchemeExternal Plaster With Exterior Grade Texture And Acrylic Emulsion Paint

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about The Heartsong?