RERA applied, not grantedHRERA Panchkula

The Forest Spa Faridabad

by Omaxe Forest Spa And Hills Developers Limited · Sector-43, Sarai Khwaja, Faridabad

RERA registration
Applied, not granted yet
Applied on
6 Apr 2019
Application status
Withdrawn/Rejected
Project ID
RERA-PKL-466-2019
Estimated cost
₹ 14.15 Cr

This project has applied for RERA registration but has not been granted it yet. Under RERA it cannot be advertised, marketed or sold until it is registered.

RERA registration

Registration certificateNot issued yet: the application is being processed by HRERA Panchkula
Project IDRERA-PKL-466-2019
AuthorityHRERA Panchkula
Project type (as filed)Ongoing
Project nameThe Forest Spa Faridabad
PromoterOmaxe Forest Spa And Hills Developers Limited
Promoter’s registered office10, Lsc Kalkaji, New Delhi, 11001
CINU70102DL2006PLC149167
Site addressSector-43, Sarai Khwaja, Faridabad
SectorSector 43
Tehsil / DistrictFaridabad / Faridabad
Layout plan approved31 Oct 2012
Building plans approved31 Oct 2012
Application submitted6 Apr 2019

Authority, hearings & orders

Current statusWithdrawn/Rejected
Initial scrutinyListed For first hearing.
Next hearingNot Required
  1. Application submitted online
  2. Application received by HRERA Panchkula
  3. Hearing Examination By Authority View order
    Proceedings

    Adjourned to 29.04.2019

  1. Hearing Adjournment View order
    Proceedings

    Adjourned to 29.04.2019

  2. Hearing Adjournment View order
    Proceedings

    As per the orders of the Authority dated 29.04.2019 case is now listed on 27.5.2019.

  3. Hearing Withdrawn/Rejected View order
    Proceedings

    Rejected the application

Land, licence & cost

Licence946 of 2006
FAR permissible / proposed1.75 / 1.75
Estimated project cost₹ 14.15 Cr
Cost of land₹ 2.61 Cr
Cost of construction₹ 11.42 Cr
EDC, taxes, levies and other costs₹ 0.12 Cr

External services

ServiceProvided byApproval taken
RoadsNoWATER SUPPLY
NoELECTRICITYNo
Sewage DisposalNoSTORM WATER DRAINAGE
No4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:Sr. No.
Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS0
Yet To Be Prepared2WATER SUPPLY SYSTEM
0YET TO BE PREPARED3
Storm Water Drainage0YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM0
Yet To Be Prepared5SEWAGE TREATMENT & GARBAGE DISPOSAL
0YET TO BE PREPARED6
Street Lighting0YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING0
Yet To Be Prepared8PLAYGROUNDS AND PARKS
0YET TO BE PREPARED9
Club House/Community Centre0YET TO BE PREPARED
10SHOPPING AREA0
Yet To Be Prepared11RENEWABLE ENERGY SYSTEM
0YET TO BE PREPARED12
School0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0
Yet To Be Prepared14ANY OTHER
0YET TO BE PREPARED5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.
31-10-2012(date)6. Date of approval of Building Plans
31-10-2012(date)(i) Details of the plots/apartments in the project:
Sr. No.Plot/ apartment typeSize of the plot/carpet area of the apartments
Total number of plots/apartments in the projectTotal size of the plots/carpet area of the apartmentsPlots/apartments booked/ sold upto the date of application
Yet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments1
APARTMENT/SHOPS/OTHER BUILDINGS Type FLAT196.22
392.420
12APARTMENT/SHOPS/OTHER BUILDINGS Type FLAT
2711271
101
3APARTMENT/SHOPS/OTHER BUILDINGS Type PENTHOUSE362.5
27252
014
APARTMENT/SHOPS/OTHER BUILDINGS Type PENTHOUSE505.391
505.3901
1Total6
1893.7951
4(ii) Apartments/Shops/Other Buildings:-(a) Status of construction activities in respect of sold/booked apartments.
TypeNumber of apartments booked/ soldWrite or Annex the stage of construction of the booked/ sold apartments in folder C
Flat3CONSTRUCTION COMPLETED
Penthouse2CONSTRUCTION COMPLETED
(b) Time schedule of completion of already booked apartments:Start Date01-08-2008
Earlier date of completion01-01-2021Revised date of completion
01-01-2021(c) Time schedule for development of infrastructure:Start Date
01-08-2008Percentage completion Upto the   date of application
100Projected date of completion01-01-2021
(d) Provide further details in the proforma REP-I Part-C-X.(e) Plan of action for completing the Project along with requisite infrastructure.(iii) Status in respect of plotted colony:-
(a)PlotsBooked/sold
Stage of handing over the possession (Write or Annex details)PLOT0
0(b) Schedule for development of Infrastructure:Start Date
01-08-2008Percentage completion100
Projected date of completion01-01-2021(c) Provide further details in the proforma REP-I Part-C-X.
(d) Schedule of completing the project and handing over possession of the plots.(iv) Vehicle parkings details of the project-a) Underground parking
0b) Stilt parking0
c) Covered parking0d) Open parking
0e) Independent garages0
(v) Quarterly schedule of development of whole/remaining part of the project:(a) Apartments/Shops/Other BuildingsExpenditure incurred till the date of application (In Lakhs)
ParticularsExpenditureExpenditure to be made in each quarter (In Lakhs)
ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-Dec
Jan-Mar(b) InfrastructureExpenditure incurred till the date of application (In Lakhs)
ParticularsExpenditureExpenditure to be made in each quarter (In Lakhs)
ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-Dec
Jan-MarIt is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________FORM REP-I
Part - C-X1.Financial information:Particulars
Remarks, if anyi. No. of Flats/Apartments constructed6
ii. No. of Flats/ Apartments booked5iii. Total amount sale value of booked Flats, on the date of application/end of last quarter
1455 Lakhsiv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter1295 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter160 Lakhsvi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter
160 Lakhsvii. Amount invested in the project upto the date of application1415 Lakhs
Land cost (If any)260 LakhsApartments
1142 LakhsInfrastructure0 Lakhs
EDC/ Taxes Etc.12 Lakhsviii. Balance cost to be incurred for completion of the project and delivery of possession
0 Lakhs(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project0 Lakhsix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C0 Lakhsx. Total liabilities against the project up-to-date. (Annex details in folder C)
0 Lakhs2.Additional information:Particulars
Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)I. INTERNAL ROADS AND PAVEMENTS
00II. WATER SUPPLY SYSTEM
00III. STORM WATER DRAINAGE
00IV. ELECTRICITY SUPPLY SYSTEM
00V. SEWAGE TREATMENT & GARBAGE DISPOSAL
00VI. CLUB HOUSE/COMMUNITY CENTRE
00VII. SCHOOL
00VIII. ANY OTHER
00IX. SOLID WASTE COLLECTION & MGMT SYSTEM
00X. CLUBHOUSE
00XI. NEIGHBOURHOOD SHOPPING
00XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.
00XIII. COVERED PARKING
00XIV. OPEN PARKING
00XV. GARAGES
00XVI. SECURITY SYSTEM
00XVII. OTHER FACILITIES AS PER PROJECT REPORT
00I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - D
Accounts related information:1. Annex copy of the balance sheet of last 3 yearsYes
2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
3. Bank account to which the deposits received from apartment buyers will be creditedBank and Branch addressAPPLIED FOR
Bank Account number000000000000IFSC code
..............MICR code............
Branch code..............4. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)
................5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)ATTACHED
I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________FORM REP-I
Part - EDetails of the statutory approvals:1. Annex copies of the following in Folder E:
i. Lay out PlanYesii. Demarcation Plan
Yesiii. Zoning PlanYes
iv. Building PlanYesSite Plan
NoFloor PlanNo
Apartment PlansNoElevation Section
NoDetail of Permissible FARNo
Detail of covered area achieved FARNo2. Annex copies of the following in Folder E:
I. Roads And Pavement PlanNoII. ELECTRICITY SUPPLY PLAN
NoIII. WATER SUPPLY PLANNo
IV. Sewerage And Garbage Disposal PlanNoV. STROM WATER DRAINAGE
NoVI. 10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYNo
Vii. Street Lighting PlanNoVIII. PARKING PLAN
No3. Statutory Approvals StatusStatutory Approvals
Statutory Approvals StatusDateI. FOREST LETTER
Already Been ObtainedNAII. CONSENT TO ESTABLISH FROM POLLUTION LEVEL.
Already Been ObtainedNAIII. PERMISSION OF DEVELOPMENT OF ROAD
Already Been ObtainedNAIV. GRANT OF CONSENT OF LAND
Already Been ObtainedNAV. FIRE NOC
Already Been ObtainedNAVI. SEWER CONNECTION
Already Been ObtainedNAVII. WATER CONNECTION
Already Been ObtainedNAIt is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees.
Signature _____________Seal _____________Date _____________
Form Rep-IPart - F1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.
Yes2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)(Annex a copy in Folder F)
Yes3. Gist of the important provisions of the Draft Agreement(Annex a copy in Folder F)
Gist of the Agreement for Sale, HaryanaThe model agreement for sale as provided under HRERA rules, 2017 contains detailed information, procedure, events and consequences about:The promoter its competency to enter into agreement with allottee, land owners, project land and the sale deeds vide which the land was procured including details of requisite sanctions/approvals obtained from the concerned competent authorities including RERA, required for opening/launching of project for sale.
The nature of the project i.e. residential/commercial/industrial/IT/any other including the details of cost, taxes, payment plan, specifications, area, amenities, appurtenances, time of completion etc. of unit being allotted under the agreement.Any discount to be provided on early payment by the allottee as per agreed terms and the authority of promoter and procedure about the change/modification in the existing plans, designs, specifications, amenities etc.The rights and obligations of allottee with respect to the allotted unit including cancellation, payment and manner of outstanding dues.
The procedure regarding assignment of allotment rights.Time and procedure of possession of the allotted unit and consequences in case of failure of take over possession by the allottee.Compensation to the allottee by the promoter in case of default/defect on its part including delay in handing over possession.
Events of default by the promoter and the allottee including delay or failure to make payment of due intsallments and consequences thereof.I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - GProjects launched by the promoter in last five years: (No Projects)
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - H
Specification Of ConstructionSpecification of apartments and other buildings including the following:1
Flooring Details Of Various Parts Of HouseDRAWING & DINNING--BOTOCHINO ITALIAN, ROOMS-WOODEN FLOORRING2
Wall Finishing DetailsPLASTIC PAINT3
Kitchen DetailsMODULAR KITCHEN WITH LAMINATED FINISH S.S 304 GRADE ACCESSORIES4
Bathroom FittingsCP FITTING-JAQUAR/GROHE/KOHLER5
Wood Work EtcMAGPIE6
Doors And Windos FramesUPVC DOOR WINDOW7
Glass WorkTOUHNED GLASS SAINT GOBIN8
Electric FittingsABB/LEGRAND/DECORATIVE LIGHT BAJAJ9
Conducting And Wiring DetailsNORPACK MEDIUM, COPPER CONCEALED10
Cupboard DetailsMOULAR WARDROBE UPTO CEILING HEIGHT11
Water StorageUGT & OHT12
Lift DetailsHITACHI & HYUNDAI(PASSENGER + SERVICE)13
External GlazingsNA13.1
Windows/GlazingsUPVC FRAME & ACP WITH LAMINATED SAFETY GLASS14
DoorsNA14.1
Main DoorsTEAK WOOD14.2
Internal DoorsSKIN MOULDING DOOR15
Air ConditioningDAIKIN CENTRALIZED VRV SYSTEM16
Electrical FittingsABB/LEGRAND/DECORATIVE LIGHT BAJAJ17
Cng Pipe LineADANI18
Provision Of Wifi And Broadband FacilityTRIPLE PLY19
External Finishing/Colour SchemeRUSTIC TEXTURE ICI & ASIAN20
Internal FinishingPLASTIC PAINT ASIANSPECIFICATION UNIT WISE
1 . Living/Dining/Foyer/Family Lounge1 . 1FLOOR
Botochino Italian1 . 2WALLS
Plastic Paint Asian1 . 3CEILING
Plastic Paint Asian2 . MASTER BEDROOM/DRESSROOM2 . 1
FloorWOODEN FLOORING-PERGO2 . 2
WallsPLASTIC PAINT ASIAN2 . 3
CeilingPLASTIC PAINT ASIAN2 . 4
Modular WardrobesMAGPIE UPTO CELING HEIGHT3 . MASTER TOILET
3 . 1FLOORBLACK GRANITE
3 . 2WALLSKAJARIA TILE
3 . 3CEILINGFALSE CEILING WITH PLASTIC PAINT
3 . 4COUNTERSBLACK GALAXY GRANITE
3 . 5SANITARY WARE/CP FITTINGSKOHLER /CP FITTING-JAQUAR/GROHE/
3 . 6FITTING/FIXTURESDECORATIVE LIGHTS BAJAJ,LEGRAND,ABB,CROMPTON
4 . Bed Rooms4 . 1FLOOR
Wooden Flooring-Pergo4 . 2WALLS
Plastic Paint Asian4 . 3CEILING
False Ceiling With Plastic Paint4 . 4WARDROBES
Magpie Upto Celing Height5 . TOILET5 . 1
FloorKAJARIA TILE5 . 2
WallsORIENT,NITCO5 . 3
CeilingFALSE CEILING WITH PLASTIC PAINT5 . 4
CountersBLACK GALAXY GRANITE5 . 5
Sanitary Ware/Cp FittingsKOHLER /CP FITTING-JAQUAR/GROHE/5 . 6
FixturesDECORATIVE LIGHTS,EXHAUST FAN HAVELLS BAJAJ,LEGRAND,ABB,CROMPTON6 . KITCHEN
6 . 1FLOORBOTOCHINO ITALIAN
6 . 2WALLSPLASTIC PAINT ASIAN/KAJARIA TILE
6 . 3CEILINGFALSE CEILING WITH PLASTIC PAINT
6 . 4COUNTERSYELLOW CRYSTAL GRANITE
6 . 5FIXTURESDECORATIVE LIGHTS,EXHAUST FAN HAVELLS BAJAJ,LEGRAND,ABB,CROMPTON
6 . 6KITCHEN APPLIANCESHOB,CHIMNEY,RO,GEYSER
7 . Utility Rooms/Utility Balcony/Toilet7 . 1FLOOR
Botochino Italian7 . 2WALLS & CEILING
Plastic Paint Asian & False Ceiling With Plastic Paint7 . 3TOILET
Orient,Nitco7 . 4BALCONY
SS Railing With Toughened Glass8 . SIT-OUTS8 . 1
FloorBOTOCHINO ITALIAN8 . 2
Walls & CeilingPLASTIC PAINT ASIAN & FALSE CEILING WITH PLASTIC PAINT8 . 3
RailingsSS & MS8 . 4
FixturesDECORATIVE LIGHTS,EXHAUST FAN HAVELLS BAJAJ,LEGRAND,ABB,CROMPTONI hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________List of Uploaded DocumentsSr. No.
Document DescriptionDate of Document UploadView Document
1IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN05-04-2019
View Document2DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.
05-04-2019View Document3
Copy Of License Along With Schedule Of Land05-04-2019View Document
4LICENCE NO 94705-04-2019
View Document5NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT
05-04-2019View Document6
In Case Of Plotted Colony, The Latest Layout Plan05-04-2019View Document
7ZONING PLAN05-04-2019
View Document8BALANCE SHEET
05-04-2019View Document9
Balance Sheet05-04-2019View Document
10CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT05-04-2019
View Document11APPLICATION FORM
05-04-2019View Document12
Agreement For Sale05-04-2019View Document
13OCCUPATION CERTIFICATE05-04-2019
View Document14OCCUPATION CERTIFICATE
05-04-2019View Document15
Occupation Certificate05-04-2019View Document
16BOARD RESOLUTION05-04-2019
View Document17DECLARATION BY THE COMPANY FOR BANK ACCOUNT DETAILS
05-04-2019View Document18
Cc Applied05-04-2019View Document
19OCCUPATION CERTIFICATE05-04-2019
View DocumentI hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________

Statutory approvals

ApprovalStatusDate
Forest LetterAlready Been Obtained
Consent To Establish From Pollution Level.Already Been Obtained
Permission Of Development Of RoadAlready Been Obtained
Grant Of Consent Of LandAlready Been Obtained
Fire NocAlready Been Obtained
Sewer ConnectionAlready Been Obtained
Water ConnectionAlready Been Obtained

Specifications (as filed)

Flooring Details Of Various Parts Of HouseDrawing & Dinning--Botochino Italian, Rooms-Wooden Floorring
Wall Finishing DetailsPlastic Paint
Kitchen DetailsModular Kitchen With Laminated Finish S.s 304 Grade Accessories
Bathroom FittingsCp Fitting-Jaquar/Grohe/Kohler
Wood Work EtcMagpie
Doors And Windos FramesUpvc Door Window
Glass WorkTouhned Glass Saint Gobin
Electric FittingsAbb/Legrand/Decorative Light Bajaj
Conducting And Wiring DetailsNorpack Medium, Copper Concealed
Cupboard DetailsMoular Wardrobe Upto Ceiling Height
Water StorageUgt & Oht
Lift DetailsHitachi & Hyundai(Passenger + Service)
Windows/GlazingsUpvc Frame & Acp With Laminated Safety Glass
Main DoorsTeak Wood
Internal DoorsSkin Moulding Door
Air ConditioningDaikin Centralized Vrv System
Electrical FittingsAbb/Legrand/Decorative Light Bajaj
Cng Pipe LineAdani
Provision Of Wifi And Broadband FacilityTriple Ply
External Finishing/Colour SchemeRustic Texture Ici & Asian
Internal FinishingPlastic Paint Asian

Source: HRERA Panchkula, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about The Forest Spa Faridabad?

This project has applied for RERA but is not registered yet. An advisor can tell you what that means for booking, and suggest registered alternatives nearby. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.