The Forest Spa Faridabad
by Omaxe Forest Spa And Hills Developers Limited · Sector-43, Sarai Khwaja, Faridabad
- RERA registration
- Applied, not granted yet
- Applied on
- 6 Apr 2019
- Application status
- Withdrawn/Rejected
- Project ID
- RERA-PKL-466-2019
- Estimated cost
- ₹ 14.15 Cr
This project has applied for RERA registration but has not been granted it yet. Under RERA it cannot be advertised, marketed or sold until it is registered.
RERA registration
| Registration certificate | Not issued yet: the application is being processed by HRERA Panchkula |
|---|---|
| Project ID | RERA-PKL-466-2019 |
| Authority | HRERA Panchkula |
| Project type (as filed) | Ongoing |
| Project name | The Forest Spa Faridabad |
| Promoter | Omaxe Forest Spa And Hills Developers Limited |
| Promoter’s registered office | 10, Lsc Kalkaji, New Delhi, 11001 |
| CIN | U70102DL2006PLC149167 |
| Site address | Sector-43, Sarai Khwaja, Faridabad |
| Sector | Sector 43 |
| Tehsil / District | Faridabad / Faridabad |
| Layout plan approved | 31 Oct 2012 |
| Building plans approved | 31 Oct 2012 |
| Application submitted | 6 Apr 2019 |
Authority, hearings & orders
- Application submitted online
- Application received by HRERA Panchkula
-
Hearing
Examination By Authority View order
Proceedings
Adjourned to 29.04.2019
-
Hearing
Adjournment View order
Proceedings
Adjourned to 29.04.2019
-
Hearing
Adjournment View order
Proceedings
As per the orders of the Authority dated 29.04.2019 case is now listed on 27.5.2019.
-
Hearing
Withdrawn/Rejected View order
Proceedings
Rejected the application
Land, licence & cost
| Licence | 946 of 2006 |
|---|---|
| FAR permissible / proposed | 1.75 / 1.75 |
| Estimated project cost | ₹ 14.15 Cr |
| Cost of land | ₹ 2.61 Cr |
| Cost of construction | ₹ 11.42 Cr |
| EDC, taxes, levies and other costs | ₹ 0.12 Cr |
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | No | WATER SUPPLY |
| No | ELECTRICITY | No |
| Sewage Disposal | No | STORM WATER DRAINAGE |
| No | 4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report: | Sr. No. |
| Name of the facility | Estimated cost (In Lakhs)(Within the project area only) | Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C) |
| 1 | INTERNAL ROADS AND PAVEMENTS | 0 |
| Yet To Be Prepared | 2 | WATER SUPPLY SYSTEM |
| 0 | YET TO BE PREPARED | 3 |
| Storm Water Drainage | 0 | YET TO BE PREPARED |
| 4 | ELECTRICITY SUPPLY SYSTEM | 0 |
| Yet To Be Prepared | 5 | SEWAGE TREATMENT & GARBAGE DISPOSAL |
| 0 | YET TO BE PREPARED | 6 |
| Street Lighting | 0 | YET TO BE PREPARED |
| 7 | SECURITY AND FIRE FIGHTING | 0 |
| Yet To Be Prepared | 8 | PLAYGROUNDS AND PARKS |
| 0 | YET TO BE PREPARED | 9 |
| Club House/Community Centre | 0 | YET TO BE PREPARED |
| 10 | SHOPPING AREA | 0 |
| Yet To Be Prepared | 11 | RENEWABLE ENERGY SYSTEM |
| 0 | YET TO BE PREPARED | 12 |
| School | 0 | YET TO BE PREPARED |
| 13 | HOSPITAL/DISPENSARY | 0 |
| Yet To Be Prepared | 14 | ANY OTHER |
| 0 | YET TO BE PREPARED | 5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed. |
| 31-10-2012 | (date) | 6. Date of approval of Building Plans |
| 31-10-2012 | (date) | (i) Details of the plots/apartments in the project: |
| Sr. No. | Plot/ apartment type | Size of the plot/carpet area of the apartments |
| Total number of plots/apartments in the project | Total size of the plots/carpet area of the apartments | Plots/apartments booked/ sold upto the date of application |
| Yet to be sold/ booked | No. of towers to be/ being constructed for booked apartments | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type FLAT | 196.2 | 2 |
| 392.4 | 2 | 0 |
| 1 | 2 | APARTMENT/SHOPS/OTHER BUILDINGS Type FLAT |
| 271 | 1 | 271 |
| 1 | 0 | 1 |
| 3 | APARTMENT/SHOPS/OTHER BUILDINGS Type PENTHOUSE | 362.5 |
| 2 | 725 | 2 |
| 0 | 1 | 4 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type PENTHOUSE | 505.39 | 1 |
| 505.39 | 0 | 1 |
| 1 | Total | 6 |
| 1893.79 | 5 | 1 |
| 4 | (ii) Apartments/Shops/Other Buildings:- | (a) Status of construction activities in respect of sold/booked apartments. |
| Type | Number of apartments booked/ sold | Write or Annex the stage of construction of the booked/ sold apartments in folder C |
| Flat | 3 | CONSTRUCTION COMPLETED |
| Penthouse | 2 | CONSTRUCTION COMPLETED |
| (b) Time schedule of completion of already booked apartments: | Start Date | 01-08-2008 |
| Earlier date of completion | 01-01-2021 | Revised date of completion |
| 01-01-2021 | (c) Time schedule for development of infrastructure: | Start Date |
| 01-08-2008 | Percentage completion Upto the | date of application |
| 100 | Projected date of completion | 01-01-2021 |
| (d) Provide further details in the proforma REP-I Part-C-X. | (e) Plan of action for completing the Project along with requisite infrastructure. | (iii) Status in respect of plotted colony:- |
| (a) | Plots | Booked/sold |
| Stage of handing over the possession (Write or Annex details) | PLOT | 0 |
| 0 | (b) Schedule for development of Infrastructure: | Start Date |
| 01-08-2008 | Percentage completion | 100 |
| Projected date of completion | 01-01-2021 | (c) Provide further details in the proforma REP-I Part-C-X. |
| (d) Schedule of completing the project and handing over possession of the plots. | (iv) Vehicle parkings details of the project- | a) Underground parking |
| 0 | b) Stilt parking | 0 |
| c) Covered parking | 0 | d) Open parking |
| 0 | e) Independent garages | 0 |
| (v) Quarterly schedule of development of whole/remaining part of the project: | (a) Apartments/Shops/Other Buildings | Expenditure incurred till the date of application (In Lakhs) |
| Particulars | Expenditure | Expenditure to be made in each quarter (In Lakhs) |
| Particulars | Expenditure to be made in each quarter ( | ) |
| Apr-June | July-Sep | Oct-Dec |
| Jan-Mar | (b) Infrastructure | Expenditure incurred till the date of application (In Lakhs) |
| Particulars | Expenditure | Expenditure to be made in each quarter (In Lakhs) |
| Particulars | Expenditure to be made in each quarter ( | ) |
| Apr-June | July-Sep | Oct-Dec |
| Jan-Mar | It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented. | Signature of the Applicant / Authorised Representative |
| Stamp _____________ | Date _____________ | FORM REP-I |
| Part - C-X | 1.Financial information: | Particulars |
| Remarks, if any | i. No. of Flats/Apartments constructed | 6 |
| ii. No. of Flats/ Apartments booked | 5 | iii. Total amount sale value of booked Flats, on the date of application/end of last quarter |
| 1455 Lakhs | iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter | 1295 Lakhs |
| v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter | 160 Lakhs | vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter |
| 160 Lakhs | vii. Amount invested in the project upto the date of application | 1415 Lakhs |
| Land cost (If any) | 260 Lakhs | Apartments |
| 1142 Lakhs | Infrastructure | 0 Lakhs |
| EDC/ Taxes Etc. | 12 Lakhs | viii. Balance cost to be incurred for completion of the project and delivery of possession |
| 0 Lakhs | (a) In respect of existing allottees | 0 Lakhs |
| (b) In respect of rest of the project | 0 Lakhs | ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project |
| Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C | 0 Lakhs | x. Total liabilities against the project up-to-date. (Annex details in folder C) |
| 0 Lakhs | 2.Additional information: | Particulars |
| Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs) | Actual expenditure incurred upto the date of application. (In Lakhs) | I. INTERNAL ROADS AND PAVEMENTS |
| 0 | 0 | II. WATER SUPPLY SYSTEM |
| 0 | 0 | III. STORM WATER DRAINAGE |
| 0 | 0 | IV. ELECTRICITY SUPPLY SYSTEM |
| 0 | 0 | V. SEWAGE TREATMENT & GARBAGE DISPOSAL |
| 0 | 0 | VI. CLUB HOUSE/COMMUNITY CENTRE |
| 0 | 0 | VII. SCHOOL |
| 0 | 0 | VIII. ANY OTHER |
| 0 | 0 | IX. SOLID WASTE COLLECTION & MGMT SYSTEM |
| 0 | 0 | X. CLUBHOUSE |
| 0 | 0 | XI. NEIGHBOURHOOD SHOPPING |
| 0 | 0 | XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC. |
| 0 | 0 | XIII. COVERED PARKING |
| 0 | 0 | XIV. OPEN PARKING |
| 0 | 0 | XV. GARAGES |
| 0 | 0 | XVI. SECURITY SYSTEM |
| 0 | 0 | XVII. OTHER FACILITIES AS PER PROJECT REPORT |
| 0 | 0 | I hereby declare that the above information and particulars are based on record and are true to the |
| best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | FORM REP-I | Part - D |
| Accounts related information: | 1. Annex copy of the balance sheet of last 3 years | Yes |
| 2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D. | Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form. | Yes |
| 3. Bank account to which the deposits received from apartment buyers will be credited | Bank and Branch address | APPLIED FOR |
| Bank Account number | 000000000000 | IFSC code |
| .............. | MICR code | ............ |
| Branch code | .............. | 4. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority) |
| ................ | 5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details) | ATTACHED |
| I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative |
| Stamp _____________ | Date _____________ | FORM REP-I |
| Part - E | Details of the statutory approvals: | 1. Annex copies of the following in Folder E: |
| i. Lay out Plan | Yes | ii. Demarcation Plan |
| Yes | iii. Zoning Plan | Yes |
| iv. Building Plan | Yes | Site Plan |
| No | Floor Plan | No |
| Apartment Plans | No | Elevation Section |
| No | Detail of Permissible FAR | No |
| Detail of covered area achieved FAR | No | 2. Annex copies of the following in Folder E: |
| I. Roads And Pavement Plan | No | II. ELECTRICITY SUPPLY PLAN |
| No | III. WATER SUPPLY PLAN | No |
| IV. Sewerage And Garbage Disposal Plan | No | V. STROM WATER DRAINAGE |
| No | VI. 10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITY | No |
| Vii. Street Lighting Plan | No | VIII. PARKING PLAN |
| No | 3. Statutory Approvals Status | Statutory Approvals |
| Statutory Approvals Status | Date | I. FOREST LETTER |
| Already Been Obtained | NA | II. CONSENT TO ESTABLISH FROM POLLUTION LEVEL. |
| Already Been Obtained | NA | III. PERMISSION OF DEVELOPMENT OF ROAD |
| Already Been Obtained | NA | IV. GRANT OF CONSENT OF LAND |
| Already Been Obtained | NA | V. FIRE NOC |
| Already Been Obtained | NA | VI. SEWER CONNECTION |
| Already Been Obtained | NA | VII. WATER CONNECTION |
| Already Been Obtained | NA | It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees. |
| Signature _____________ | Seal _____________ | Date _____________ |
| Form Rep-I | Part - F | 1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers. |
| Yes | 2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules) | (Annex a copy in Folder F) |
| Yes | 3. Gist of the important provisions of the Draft Agreement | (Annex a copy in Folder F) |
| Gist of the Agreement for Sale, Haryana | The model agreement for sale as provided under HRERA rules, 2017 contains detailed information, procedure, events and consequences about: | The promoter its competency to enter into agreement with allottee, land owners, project land and the sale deeds vide which the land was procured including details of requisite sanctions/approvals obtained from the concerned competent authorities including RERA, required for opening/launching of project for sale. |
| The nature of the project i.e. residential/commercial/industrial/IT/any other including the details of cost, taxes, payment plan, specifications, area, amenities, appurtenances, time of completion etc. of unit being allotted under the agreement. | Any discount to be provided on early payment by the allottee as per agreed terms and the authority of promoter and procedure about the change/modification in the existing plans, designs, specifications, amenities etc. | The rights and obligations of allottee with respect to the allotted unit including cancellation, payment and manner of outstanding dues. |
| The procedure regarding assignment of allotment rights. | Time and procedure of possession of the allotted unit and consequences in case of failure of take over possession by the allottee. | Compensation to the allottee by the promoter in case of default/defect on its part including delay in handing over possession. |
| Events of default by the promoter and the allottee including delay or failure to make payment of due intsallments and consequences thereof. | I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. |
| Signature of the Applicant / Authorised Representative | Stamp _____________ | Date _____________ |
| Form Rep-I | Part - G | Projects launched by the promoter in last five years: (No Projects) |
| I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | FORM REP-I | Part - H |
| Specification Of Construction | Specification of apartments and other buildings including the following: | 1 |
| Flooring Details Of Various Parts Of House | DRAWING & DINNING--BOTOCHINO ITALIAN, ROOMS-WOODEN FLOORRING | 2 |
| Wall Finishing Details | PLASTIC PAINT | 3 |
| Kitchen Details | MODULAR KITCHEN WITH LAMINATED FINISH S.S 304 GRADE ACCESSORIES | 4 |
| Bathroom Fittings | CP FITTING-JAQUAR/GROHE/KOHLER | 5 |
| Wood Work Etc | MAGPIE | 6 |
| Doors And Windos Frames | UPVC DOOR WINDOW | 7 |
| Glass Work | TOUHNED GLASS SAINT GOBIN | 8 |
| Electric Fittings | ABB/LEGRAND/DECORATIVE LIGHT BAJAJ | 9 |
| Conducting And Wiring Details | NORPACK MEDIUM, COPPER CONCEALED | 10 |
| Cupboard Details | MOULAR WARDROBE UPTO CEILING HEIGHT | 11 |
| Water Storage | UGT & OHT | 12 |
| Lift Details | HITACHI & HYUNDAI(PASSENGER + SERVICE) | 13 |
| External Glazings | NA | 13.1 |
| Windows/Glazings | UPVC FRAME & ACP WITH LAMINATED SAFETY GLASS | 14 |
| Doors | NA | 14.1 |
| Main Doors | TEAK WOOD | 14.2 |
| Internal Doors | SKIN MOULDING DOOR | 15 |
| Air Conditioning | DAIKIN CENTRALIZED VRV SYSTEM | 16 |
| Electrical Fittings | ABB/LEGRAND/DECORATIVE LIGHT BAJAJ | 17 |
| Cng Pipe Line | ADANI | 18 |
| Provision Of Wifi And Broadband Facility | TRIPLE PLY | 19 |
| External Finishing/Colour Scheme | RUSTIC TEXTURE ICI & ASIAN | 20 |
| Internal Finishing | PLASTIC PAINT ASIAN | SPECIFICATION UNIT WISE |
| 1 . Living/Dining/Foyer/Family Lounge | 1 . 1 | FLOOR |
| Botochino Italian | 1 . 2 | WALLS |
| Plastic Paint Asian | 1 . 3 | CEILING |
| Plastic Paint Asian | 2 . MASTER BEDROOM/DRESSROOM | 2 . 1 |
| Floor | WOODEN FLOORING-PERGO | 2 . 2 |
| Walls | PLASTIC PAINT ASIAN | 2 . 3 |
| Ceiling | PLASTIC PAINT ASIAN | 2 . 4 |
| Modular Wardrobes | MAGPIE UPTO CELING HEIGHT | 3 . MASTER TOILET |
| 3 . 1 | FLOOR | BLACK GRANITE |
| 3 . 2 | WALLS | KAJARIA TILE |
| 3 . 3 | CEILING | FALSE CEILING WITH PLASTIC PAINT |
| 3 . 4 | COUNTERS | BLACK GALAXY GRANITE |
| 3 . 5 | SANITARY WARE/CP FITTINGS | KOHLER /CP FITTING-JAQUAR/GROHE/ |
| 3 . 6 | FITTING/FIXTURES | DECORATIVE LIGHTS BAJAJ,LEGRAND,ABB,CROMPTON |
| 4 . Bed Rooms | 4 . 1 | FLOOR |
| Wooden Flooring-Pergo | 4 . 2 | WALLS |
| Plastic Paint Asian | 4 . 3 | CEILING |
| False Ceiling With Plastic Paint | 4 . 4 | WARDROBES |
| Magpie Upto Celing Height | 5 . TOILET | 5 . 1 |
| Floor | KAJARIA TILE | 5 . 2 |
| Walls | ORIENT,NITCO | 5 . 3 |
| Ceiling | FALSE CEILING WITH PLASTIC PAINT | 5 . 4 |
| Counters | BLACK GALAXY GRANITE | 5 . 5 |
| Sanitary Ware/Cp Fittings | KOHLER /CP FITTING-JAQUAR/GROHE/ | 5 . 6 |
| Fixtures | DECORATIVE LIGHTS,EXHAUST FAN HAVELLS BAJAJ,LEGRAND,ABB,CROMPTON | 6 . KITCHEN |
| 6 . 1 | FLOOR | BOTOCHINO ITALIAN |
| 6 . 2 | WALLS | PLASTIC PAINT ASIAN/KAJARIA TILE |
| 6 . 3 | CEILING | FALSE CEILING WITH PLASTIC PAINT |
| 6 . 4 | COUNTERS | YELLOW CRYSTAL GRANITE |
| 6 . 5 | FIXTURES | DECORATIVE LIGHTS,EXHAUST FAN HAVELLS BAJAJ,LEGRAND,ABB,CROMPTON |
| 6 . 6 | KITCHEN APPLIANCES | HOB,CHIMNEY,RO,GEYSER |
| 7 . Utility Rooms/Utility Balcony/Toilet | 7 . 1 | FLOOR |
| Botochino Italian | 7 . 2 | WALLS & CEILING |
| Plastic Paint Asian & False Ceiling With Plastic Paint | 7 . 3 | TOILET |
| Orient,Nitco | 7 . 4 | BALCONY |
| SS Railing With Toughened Glass | 8 . SIT-OUTS | 8 . 1 |
| Floor | BOTOCHINO ITALIAN | 8 . 2 |
| Walls & Ceiling | PLASTIC PAINT ASIAN & FALSE CEILING WITH PLASTIC PAINT | 8 . 3 |
| Railings | SS & MS | 8 . 4 |
| Fixtures | DECORATIVE LIGHTS,EXHAUST FAN HAVELLS BAJAJ,LEGRAND,ABB,CROMPTON | I hereby declare that the above information and particulars are based on record and are true to the |
| best of my knowledge and belief and nothing has been concealed. | Signature of the Applicant / Authorised Representative | Stamp _____________ |
| Date _____________ | List of Uploaded Documents | Sr. No. |
| Document Description | Date of Document Upload | View Document |
| 1 | IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN | 05-04-2019 |
| View Document | 2 | DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. |
| 05-04-2019 | View Document | 3 |
| Copy Of License Along With Schedule Of Land | 05-04-2019 | View Document |
| 4 | LICENCE NO 947 | 05-04-2019 |
| View Document | 5 | NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT |
| 05-04-2019 | View Document | 6 |
| In Case Of Plotted Colony, The Latest Layout Plan | 05-04-2019 | View Document |
| 7 | ZONING PLAN | 05-04-2019 |
| View Document | 8 | BALANCE SHEET |
| 05-04-2019 | View Document | 9 |
| Balance Sheet | 05-04-2019 | View Document |
| 10 | CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT | 05-04-2019 |
| View Document | 11 | APPLICATION FORM |
| 05-04-2019 | View Document | 12 |
| Agreement For Sale | 05-04-2019 | View Document |
| 13 | OCCUPATION CERTIFICATE | 05-04-2019 |
| View Document | 14 | OCCUPATION CERTIFICATE |
| 05-04-2019 | View Document | 15 |
| Occupation Certificate | 05-04-2019 | View Document |
| 16 | BOARD RESOLUTION | 05-04-2019 |
| View Document | 17 | DECLARATION BY THE COMPANY FOR BANK ACCOUNT DETAILS |
| 05-04-2019 | View Document | 18 |
| Cc Applied | 05-04-2019 | View Document |
| 19 | OCCUPATION CERTIFICATE | 05-04-2019 |
| View Document | I hereby declare that the above information and particulars are based on record and are true to the | best of my knowledge and belief and nothing has been concealed. |
| Signature of the Applicant / Authorised Representative | Stamp _____________ | Date _____________ |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| Forest Letter | Already Been Obtained | |
| Consent To Establish From Pollution Level. | Already Been Obtained | |
| Permission Of Development Of Road | Already Been Obtained | |
| Grant Of Consent Of Land | Already Been Obtained | |
| Fire Noc | Already Been Obtained | |
| Sewer Connection | Already Been Obtained | |
| Water Connection | Already Been Obtained |
Specifications (as filed)
| Flooring Details Of Various Parts Of House | Drawing & Dinning--Botochino Italian, Rooms-Wooden Floorring |
|---|---|
| Wall Finishing Details | Plastic Paint |
| Kitchen Details | Modular Kitchen With Laminated Finish S.s 304 Grade Accessories |
| Bathroom Fittings | Cp Fitting-Jaquar/Grohe/Kohler |
| Wood Work Etc | Magpie |
| Doors And Windos Frames | Upvc Door Window |
| Glass Work | Touhned Glass Saint Gobin |
| Electric Fittings | Abb/Legrand/Decorative Light Bajaj |
| Conducting And Wiring Details | Norpack Medium, Copper Concealed |
| Cupboard Details | Moular Wardrobe Upto Ceiling Height |
| Water Storage | Ugt & Oht |
| Lift Details | Hitachi & Hyundai(Passenger + Service) |
| Windows/Glazings | Upvc Frame & Acp With Laminated Safety Glass |
| Main Doors | Teak Wood |
| Internal Doors | Skin Moulding Door |
| Air Conditioning | Daikin Centralized Vrv System |
| Electrical Fittings | Abb/Legrand/Decorative Light Bajaj |
| Cng Pipe Line | Adani |
| Provision Of Wifi And Broadband Facility | Triple Ply |
| External Finishing/Colour Scheme | Rustic Texture Ici & Asian |
| Internal Finishing | Plastic Paint Asian |
Source: HRERA Panchkula, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.




Questions about The Forest Spa Faridabad?