Registration validHRERA Gurugram

The Dualis

by Spre Gurugram Properties Pvt. Ltd. Sector 46 · Plot No. 1, Urban Estate Gurugram, Sector 46, Gurugram Haryana, 122022

RERA registration
GGM/939/671/2025/42
Registered on
1 May 2025
Valid till
31 Dec 2031
Project ID
RERA-GRG-1880-2025
Apartments
198 in 2 towers
Completion (as filed)
31 Dec 2031
Estimated cost
₹ 840.22 Cr

RERA registration

Registration certificateGGM/939/671/2025/42, dated 1 May 2025
Registration valid till31 Dec 2031
Project IDRERA-GRG-1880-2025
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameThe Dualis
PromoterSpre Gurugram Properties Pvt. Ltd. Sector 46
Promoter’s registered officeSp, Centre, Minoo Desai Marg, Colaba, Mumbai - 400 005
CINU68200MH2024PTC422008
Site addressPlot No. 1, Urban Estate Gurugram, Sector 46, Gurugram Haryana, 122022
SectorSector 46
Tehsil / DistrictGurgaon / Gurugram
Layout plan approved20 Feb 2025
Building plans approved20 Feb 2025
Construction start (as filed)1 Apr 2025
Completion (as filed)31 Dec 2031
Application submitted25 Feb 2025

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Initial scrutinyFirst hearing
Next hearingNot Required
  1. Application submitted online
  2. Hearing Examination By Authority
    Proceedings

    Sh. Shashank Sharma, Associate Engineer Executive and Ms. Asha, Chartered Accountant briefed about the facts of the case. Sh. Harshit Batra (Advocate) and Sh. Jitesh (AR) are present on behalf of the promoter and states that no third-party rights have been created on the said project. The Authority observes that there are revisions in the building plans issued by HSVP vide memo no CTP/DTP(NN)/57548 dated 20.02.2025. So, in view of the above, it is decided that a two-week public notice be issued in three prominent newspapers (two english and one hindi) of wide circulation for inviting objections, if any, regarding revision in the building plans. The promoter is further directed to submit the remaining deficit documents. The matter to come up on 21.04.2025.

  3. Hearing Approved And Ready For Certificate Issuing Process View order
    Proceedings

    Proceedings dated: 21.04.2025. Sh. Shashank Sharma, Associate Engineer Executive and Ms. Asha, Chartered Accountant briefed about the facts of the case. Sh. Jitesh Bhonde (AR) Ms. Tanya (Advocate) are present on behalf of the promoter and state that they have submitted the draft allottee documents in the Authority on 18.04.2025. Approved as proposed. A DD amounting to Rs 25 lakhs has been deposited by the promoter as a security deposit to submit the EC within 4 months of RERA registration failing which, the same shall be forfeited. Mining permission shall be obtained before start of excavation at site. The RC shall be issued after submission of remaining documents and correction in the form A-H and DPI.

  1. Registration granted GGM/939/671/2025/42
  2. Certificate uploaded RC Uploaded
  3. Registration valid till

Land, licence & cost

LicenceNo. The project is being developed on an HSVP allotted land, allotted through LOI bearing Endst No. ZO002/EO018/UE029/LALOT/0000000005
FAR permissible / proposed5.12 / 5.12
Estimated project cost₹ 840.22 Cr
Cost of land₹ 163.02 Cr
Cost of construction₹ 308.22 Cr
Infrastructure and other structures₹ 127.39 Cr
EDC, taxes, levies and other costs₹ 241.6 Cr

How the land will be used

UseArea (as filed)Share
Land Area To Be Used For Construction Of Apartments1,592.37622.6%
Construction Of Roads2,424.3734.4%
Pavements1,877.39726.7%
Green Belts1,143.64716.3%

Apartments 198 units · 2 towers

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings114.541,2336
Apartment/Shops/Other Buildings130.861,40920
Apartment/Shops/Other Buildings132.821,43040
Apartment/Shops/Other Buildings129.971,39933
Apartment/Shops/Other Buildings130.651,40633
Apartment/Shops/Other Buildings130.031,4003
Apartment/Shops/Other Buildings157.351,69430
Apartment/Shops/Other Buildings150.611,62133

Areas are as filed with HRERA.

External services

ServiceProvided byApproval taken
RoadsCONNECTEDNo
Water SupplyGMDAYes
ElectricityDHBVNYes
Sewage DisposalGMDAYes
Storm Water DrainageGMDAYes
HSVP Letter For All PermissionsHSVPYes

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 13.27 CrAs Per Project Report
Water Supply System₹ 10 lakhAs Per Project Report
Storm Water Drainage₹ 40 lakhAs Per Project Report
Electricity Supply System₹ 18 lakhAs Per Project Report
Sewage Treatment & Garbage Disposal₹ 31 lakhAs Per Project Report
Street Lighting₹ 97 lakhAs Per Project Report
Security And Fire Fighting₹ 2.01 CrAs Per Project Report
Playgrounds And Parks₹ 12 lakhAs Per Project Report
Club House/Community Centre₹ 19.83 CrAs Per Project Report
Renewable Energy System₹ 19 lakhAs Per Project Report
Sewerage System₹ 23 lakhAs Per Project Report
Security And Fire Fighting₹ 2.01 CrAs Per Project Report
Parking₹ 83.78 CrAs Per Project Report
Underground Water Tank₹ 1.64 CrAs Per Project Report
Electric Sub Station₹ 4.32 CrAs Per Project Report
Rain Water Harvesting₹ 4 lakhAs Per Project Report

Statutory approvals

ApprovalStatusDate
HSVP Memo No. 7610 - For All PermissionsAlready Been Obtained14 Nov 2024
Aai NocAlready Been Obtained8 Oct 2024
Approval Of Revised Building PlanAlready Been Obtained20 Feb 2024

Specifications (as filed)

Flooring Details Of Various Parts Of HouseVitrified Tile
Wall Finishing DetailsGypsum And Paint
Kitchen DetailsVitrified Floor, Ceramic Dado Tile, Granite Counters
Bathroom FittingsCeramic And Vitrified Tile For Floors, Vitrified Tile For Walls, False Ceiling, Granite Counter.
Wood Work EtcPre Engineer (Doors And Shutters)
Doors And Windos FramesPre Engineer ( Wood / Aluminum)
Glass WorkSliding Window
Electric FittingsBranded Fitting
Conducting And Wiring DetailsYes, As Per Design
Water StorageOverhead And Ug Tanks
Lift DetailsPremium Lifts
Windows/GlazingsSliding Glass Window
DoorsPre Engineer
Main DoorsPre Engineer Doors
Internal DoorsPre Engineer Doors
Air ConditioningAvailable.
Electrical FittingsPremium Standard
Provision Of Wifi And Broadband FacilityYes
External Finishing/Colour SchemeCladding Texture Paint, As Per Design
Internal FinishingGypsym, Paint, Tile, Etc.

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about The Dualis?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.