Sriflex City
by Sriflex Projects Private Limited · Sector 4, Sohna
- RERA registration
- GGM/814/546/2024/41
- Registered on
- 15 Apr 2024
- Valid till
- 31 Jan 2028
- Project ID
- RERA-GRG-1453-2023
- Land area
- 5.975 acres
- Apartments
- 1,190 in 6 towers
- Completion (as filed)
- 28 Feb 2028
- Estimated cost
- ₹ 323.8 Cr
RERA registration
| Registration certificate | GGM/814/546/2024/41, dated 15 Apr 2024 |
|---|---|
| Registration valid till | 31 Jan 2028 |
| Project ID | RERA-GRG-1453-2023 |
| Authority | HRERA Gurugram |
| Project type (as filed) | New |
| Project name | Sriflex City |
| Promoter | Sriflex Projects Private Limited |
| Promoter’s registered office | Unit No 3, Third Floor, Ninex City Mart, Sector 49, Sohna Road, Gurugram, Haryana - 122018 |
| CIN | U70109HR2020PTC085412 |
| Site address | Sector 4, Sohna |
| Sector | Sector 4 |
| Tehsil / District | Sohna / Gurugram |
| Layout plan approved | 19 Mar 2024 |
| Building plans approved | 19 Mar 2024 |
| Construction start (as filed) | 1 Jul 2024 |
| Completion (as filed) | 28 Feb 2028 |
| Application submitted | 6 Oct 2023 |
Authority, hearings & orders
- Application submitted online
- Application received by HRERA Gurugram
-
Hearing
Examination By Authority View order
Proceedings
Sh. Shashank Sharma, Associate Engineer Executive briefed about the facts of the project. The application submitted by the promoter has been scrutinized by the concerned official, but the deficiency notice has not been dispatched till date. Therefore, in view of the same the matter is adjourned, and the concerned official is directed to dispatch the notice. The next date of hearing will be conveyed after submission of reply of deficiencies.
- Notice sent to the promoter By hand
-
Hearing
Adjournment View order
Proceedings
Sh. Shashank Sharma, Associate Engineer Executive briefed about the facts of the project. Sh. Inderjeet Singh (AR) is present on behalf of the promoter. The AR of the promoter seeks two weeks’ time to comply with the deficiencies. The matter to come up on 27.03.2024 at 3.00 PM.
-
Hearing
Adjournment
Proceedings
Sh. Shashank Sharma, Associate Engineer Executive and Sh. Ashish, Chartered Accountant briefed about the facts of the project. Sh. Inderjeet Singh (AR) is present on behalf of the promoter. The AR submits that the reply to the deficiency notice has been submitted today including the deficit fee which has been paid through NEFT. The office to examine and submit. The matter to come up on 08.04.2024.
-
Hearing
Approved And Ready For Certificate Issuing Process
Proceedings
Sh. Shashank Sharma, Associate Engineer Executive and Sh. Ashish, Chartered Accountant briefed about the facts of the project. Sh. Inderjeet Singh (AR) and Sh. R.K. Singh are present on behalf of the promoter. The AR clarifies that present access to the site is through a 4 karam (22 Ft wide) as per policy parameters fixed by PSTCP vide Memo No Misc – 504/2020-2TCP dated 20.10.2020 and states that environment clearance already applied to Central Expert Appraisal Committee of the Environment Ministry Further, the promoter shall submit the DD/BG of Rs. 25 lakhs each for submission of approved fire scheme, approved service plan estimates and environment clearance within 4 months. The promoter shall further make a declaration regarding the present condition of services to be provided made in the project in the marketing brochure clarifying that the land for master road as per approved lay out plan of 2031 AD for Urban Estate Sohna has not been acquired yet and as such the arrangement for water supply and sewage disposal shall be made by the promoter at his own level until then. No sale/booking in respect of the units frozen by DTCP in lieu of EDC till removal of the lien by DTCP. Approved as proposed.
- Registration granted GGM/814/546/2024/41
- Certificate uploaded RC Uploaded
- Registration valid till
Land, licence & cost
| Land area of the project | 5.975 acres |
|---|---|
| Total licensed area | 8.769 acres |
| Licence | License no 133 of 2023 dated 26th june 2023 from the office of DTCP Haryana |
| FAR permissible / proposed | 240 / 240 |
| Estimated project cost | ₹ 323.8 Cr |
| Cost of land | ₹ 118.38 Cr |
| Cost of construction | ₹ 127.88 Cr |
| Infrastructure and other structures | ₹ 35.88 Cr |
| EDC, taxes, levies and other costs | ₹ 41.65 Cr |
How the land will be used
| Use | Area (as filed) | Share |
|---|---|---|
| Land Area To Be Used For Construction Of Apartments | 6,255 | 18.2% |
| Construction Of Roads | 6,000 | 17.4% |
| Parks And Playgrounds | 6,000 | 17.4% |
| Green Belts | 6,899 | 20% |
| Sewage And Solid Waste Treatment Facility | 600 | 1.7% |
| Any Other | 8,700.67 | 25.3% |
Apartments 1,190 units · 6 towers
| Type | Carpet area (sq m) | Carpet area (sq ft) | Units |
|---|---|---|---|
| Apartment/Shops/Other Buildings | 66,023.67 | - | 1105 |
| Apartment/Shops/Other Buildings | 1,830.97 | 19,708 | 85 |
Areas are as filed with HRERA. Some rows show a total built-up area rather than one home’s carpet area, as entered by the promoter.
External services
| Service | Provided by | Approval taken |
|---|---|---|
| Roads | HSVP | No |
| Water Supply | HSVP | Yes |
| Electricity | DHBVN LTD | Yes |
| Sewage Disposal | HSVP | Yes |
| Storm Water Drainage | HSVP | Yes |
Facilities in the service plan
| Facility | Estimated cost | Status |
|---|---|---|
| Internal Roads And Pavements | ₹ 3 Cr | As Per Project Report |
| Water Supply System | ₹ 5.5 Cr | As Per Project Report |
| Storm Water Drainage | ₹ 2.5 Cr | As Per Project Report |
| Electricity Supply System | ₹ 8.5 Cr | As Per Project Report |
| Sewage Treatment & Garbage Disposal | ₹ 1.5 Cr | As Per Project Report |
| Street Lighting | ₹ 50 lakh | As Per Project Report |
| Security And Fire Fighting | ₹ 3 Cr | As Per Project Report |
| Playgrounds And Parks | ₹ 50 lakh | As Per Project Report |
| Renewable Energy System | ₹ 50 lakh | As Per Project Report |
| Any Other | ₹ 87.87 lakh | As Per Project Report |
| Underground Water Tank | ₹ 1 Cr | As Per Project Report |
| Stp | ₹ 1.5 Cr | As Per Project Report |
| Rain Water Harvesting | ₹ 50 lakh | As Per Project Report |
Statutory approvals
| Approval | Status | Date |
|---|---|---|
| Forest Noc | Already Been Obtained | 25 Apr 2023 |
| Site Plan | Already Been Obtained | 21 Nov 2023 |
| Zoning Plan | Already Been Obtained | 26 Jun 2023 |
| Building Plan | Already Been Obtained | 19 Mar 2024 |
| Environmental Clearance | Applied For But Yet To Receive | 2 Mar 2024 |
Specifications (as filed)
| Flooring Details Of Various Parts Of House | Tiles/Ips |
|---|---|
| Wall Finishing Details | Obd /Color Wash |
| Kitchen Details | Florring / Walls - Tiles/Ips, Tiles Upto 2 Ft Height And Obd / Color Wash In Balance Area |
| Bathroom Fittings | Wash Basin And Cp/Pvc/Ptmt Fittings |
| Doors And Windos Frames | Frames -- Hardwood /Ms / Fiber / Upvc |
| Glass Work | Standard |
| Electric Fittings | Isi Marked Products For Wiring, Switches And Circuits |
| Conducting And Wiring Details | Isi Marked Products For Wiring, Switches And Circuits |
| Water Storage | Rcc Tank |
| Lift Details | Standard Make |
| External Glazings | Upvc / Hardwoord / Ms, Z Section /Fibre /Composite /Aluminium Frame Windows Etc |
| Windows/Glazings | Upvc / Hardwoord / Ms, Z Section /Fibre /Composite /Aluminium Frame Windows Etc |
| Doors | Flush Doors |
| Main Doors | Flush Doors |
| Internal Doors | Flush Doors |
| Air Conditioning | N A |
| Electrical Fittings | Isi Marked Products For Wiring, Switches And Circuits |
| Cng Pipe Line | N A |
| Provision Of Wifi And Broadband Facility | N A |
| External Finishing/Colour Scheme | Putty And Paint |
| Internal Finishing | Putty And Paint |
Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.




Questions about Sriflex City?
An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.