Registration validHRERA Gurugram

Smartworld Gems 2

by Adhikaansh Realtors Private Limited · Sector-89, Gurugram Haryana

RERA registration
GGM/858/590/2024/85
Registered on
12 Aug 2024
Valid till
3 Apr 2027
Project ID
RERA-GRG-1308-2023
Land area
3.44 acres
Apartments
367
Completion (as filed)
3 Apr 2027
Estimated cost
₹ 345.8 Cr

RERA registration

Registration certificateGGM/858/590/2024/85, dated 12 Aug 2024
Registration valid till3 Apr 2027
Project IDRERA-GRG-1308-2023
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameSmartworld Gems 2
PromoterAdhikaansh Realtors Private Limited
Promoter’s registered office12A Floor, Tower 2 M3M International Financial Center,
CINU70109HR2020PTC090928
Site addressSector-89, Gurugram Haryana
SectorSector 89
Tehsil / DistrictHarsaru St / Gurugram
Layout plan approved27 Jul 2022
Building plans approved3 Apr 2024
Construction start (as filed)3 Apr 2024
Completion (as filed)3 Apr 2027
Application submitted13 Jun 2024

Authority, hearings & orders

Current statusApproved And Certificate Uploaded
Initial scrutinyFirst hearing
Next hearingNot Required
  1. Application submitted online
  2. Application received by HRERA Gurugram
  3. Notice sent to the promoter By hand
  1. Hearing Examination By Authority View order
    Proceedings

    The matter is adjourned and to come up on 22.07.2024.

  2. Hearing Adjournment View order
    Proceedings

    Sh. Shashank Sharma, Associate Engineer Executive and Sh. Ashish Dubey, Chartered Accountant briefed about the facts of the case. Sh. Abhijeet Singh (AR), Sh. Manik Sharma (AR) and Sh. Bharat Vigmal (AR) are present on behalf of the promoter and states that approval of revised building plan with provision of stilt +4 Floors is under consideration of the department and copies of approved plan along with the fees in lieu of increased FAR shall be submitted within one week. Further no 3rd party right in respect of the any of the unit in the above project has been created. The matter to come up on 05.08.2024.

  3. Hearing Adjournment View order
    Proceedings

    The matter is adjourned and to come up on 23.08.2024.

  1. Hearing Approved And Ready For Certificate Issuing Process
    Proceedings

    Sh. Shashank Sharma, Associate Engineer Executive and Sh. Ashish Dubey, Chartered Accountant briefed about the facts of the case. Sh. Abhijeet Singh (AR), Sh. Manik Sharma (AR) and Sh. Bharat Vigmal (AR) are present on behalf of the promoter and states that DTCP vide order bearing memo no CCD-123/2024/24921-24 dated 06.08.2024 with directions to keep approval of S+4 floors in residential plots on hold in view of deliberations held in CM No 11909 of 2024 in CWP No. 9115 of 2021. Therefore, in view of the same, he wishes to proceed with the registration of S + 3 floors only as already applied. The promoter has applied for registration of 279 floors on 93 residential plots along with 3 commercial blocks. Further, regarding fire scheme approval of commercial plot no. 6 and 8, the AR of the promoter stated that, this is a small commercial component area admeasuring 1022.715 sqmtr and 431.823 sqmtr each having height less than 15 sqmtr for each and they will submit the approval within 2 months. The promoter has already submitted the written consent of  1321 allottees out of 1955 existing allottees which is 67.57% i.e., more than 2/3rd of total number of allottees for changes in respect of revisions in approved layout plan of 52.2750 acres registered vide RC no 68 of 2021 and the public notice was also published in two prominent newspapers i.e., The Tribune and Dainik Tribune dated 17.07.2024 for inviting objections with respect to the revisions in layout plan against which no objections had been received in the Authority. For the commercial component measuring 1454.535 sq mtr only (Commercial plot 6 and 8) and having height less than 15 meters, fire NoC is applied and is to be granted by the local fire officer which shall be submitted within 2 months and condition to this effect will be incorporated in the RC. So, keeping in view of the above peculiar facts, approved as proposed subject to rectification in form A-H and DPI.

  2. Registration granted GGM/858/590/2024/85
  3. Certificate uploaded RC approved and uploaded
  1. Registration valid till

Land, licence & cost

Land area of the project3.44 acres
Total licensed area57.4 acres
Licence102 of 2022 dated 27.07.2022 and 32 of 2021 dated 03.07.2021
FAR permissible / proposed2 / 2
Estimated project cost₹ 345.8 Cr
Cost of land₹ 69.66 Cr
Cost of construction₹ 172.35 Cr
Infrastructure and other structures₹ 14.84 Cr
EDC, taxes, levies and other costs₹ 88.96 Cr

How the land will be used

UseSq mShare
Land Area To Be Used For Construction Of Apartments11,431.0682.1%
Commercial2,488.1617.9%

Apartments 367 units

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings251,139.33-367

Areas are as filed with HRERA. Some rows show a total built-up area rather than one home’s carpet area, as entered by the promoter.

External services

ServiceProvided byApproval taken
RoadsGMDAYes
Water SupplyGMDAYes
ElectricityDHBVNYes
Sewage DisposalGMDAYes
Storm Water DrainageGMDAYes

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 4.76 CrAs Per Project Report
Water Supply System₹ 51.63 lakhAs Per Project Report
Storm Water Drainage₹ 1.3 CrAs Per Project Report
Electricity Supply System₹ 58.33 lakhAs Per Project Report
Sewage Treatment & Garbage Disposal₹ 2.13 CrAs Per Project Report
Street Lighting₹ 36.48 lakhAs Per Project Report
Security And Fire Fighting₹ 3.78 lakhAs Per Project Report
Playgrounds And Parks₹ 39.51 lakhAs Per Project Report
Any Other₹ 2.38 CrAs Per Project Report
Stp₹ 23.88 lakhAs Per Project Report
Underground Tank₹ 32.95 lakhAs Per Project Report
Rain Water Harvesting₹ 4.97 lakhAs Per Project Report
Electrical Sub Station₹ 1.28 CrAs Per Project Report
Boundary Wall₹ 46.23 lakhAs Per Project Report

Statutory approvals

ApprovalStatusDate
License ApprovalAlready Been Obtained27 Jul 2022
License ApprovalAlready Been Obtained3 Jul 2021
Zoning Plan ApprovalAlready Been Obtained25 Jan 2023
Layout Plan ApprovalAlready Been Obtained27 Jul 2022
Environment Clearance ApprovalAlready Been Obtained2 Nov 2021
Aravalli NocAlready Been Obtained13 Apr 2021
Forest NocAlready Been Obtained24 Mar 2021

Specifications (as filed)

Flooring Details Of Various Parts Of HouseVitrified Tile / Laminated Wooden Flooring / Ceramic Tile
Wall Finishing DetailsPlaster With Paint
Kitchen DetailsGranite Counter With SS Sink
Bathroom FittingsAs Per Approved Make
Doors And Windos FramesHardwood Door Frame With Laminated Flush/Wooden Door
Electric FittingsAs Per Approved Make
Conducting And Wiring DetailsAs Per Approved Make
Water StorageAs Per Norms
Lift Details4 To 6 Passenger Lifts As Per Norms
Windows/GlazingsAluminium Glazing / Upvc Glazing
Main DoorsHardwood Door Frame With Laminated Flush Door
Internal DoorsHardwood Door Frame With Laminated Wooden Door
Air ConditioningProvision (Electrical And Drain Only)
Electrical FittingsAs Per Approved Make
External Finishing/Colour SchemeProvision (Electrical And Drain Only)

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Smartworld Gems 2?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.