Signature Global City 37D - 1

by Signatureglobal Developers Pvt Ltd · Village Gaduli Kalan, Sector-37D, Gurugram

RERA registration
GGM/463/195/2021/31
Registered on
13 Jul 2021
Valid till
28 Sep 2025
Project ID
RERA-GRG-877-2021
Land area
15.502 acres
Apartments
632 in 36 towers
Completion (as filed)
30 Sep 2023
Estimated cost
₹ 434.66 Cr

RERA registration

Registration certificateGGM/463/195/2021/31, dated 13 Jul 2021
Registration valid till28 Sep 2025
Project IDRERA-GRG-877-2021
AuthorityHRERA Gurugram
Project type (as filed)New
Project nameSignature Global City 37D - 1
PromoterSignatureglobal Developers Pvt Ltd
Promoter’s registered office1308, 13TH Floor , Dr.gopal Das Bhawan, 28 Barakhambha Road, New Delhi-110001
CINU70109DL2012PTC241901
Site addressVillage Gaduli Kalan, Sector-37D, Gurugram
SectorSector 37D
Tehsil / DistrictKadipur St / Gurugram
Construction start (as filed)1 Jul 2021
Completion (as filed)30 Sep 2023
Application submitted17 Jun 2021

Authority, hearings & orders

Current statusExtension Certificate Uploaded
Initial scrutiny1st deficiency notice sent on 02.07.2021
Next hearingNot Required
  1. Application submitted online
  2. Application received by HRERA Gurugram
  3. Hearing Approved And Ready For Certificate Issuing Process
    Proceedings

    An application regarding registration of residential floors project namely “Signature Global City 37D Phase-1” situated at Village Gadauli Sector-37D, Distt. Gurugram being developed by M/s Signature Global Developers Pvt. Ltd. was submitted on 25.06.2021 under section 4 of Real Estate (Regulation and Development), Act 2016. This application for registration is a part of the affordable residential plotted colony under DDJAY which falls under license no. 08 of 2021 for area admeasuring 20.589 acres dated 05.03.2021 valid up to 04.03.2026 being issued in favour of M/s Lalwani Brothers Buildcon LLP and M/s Unistay Hospitality Pvt. Ltd. in collaboration M/s Signature Global Developers Pvt. Ltd. The project comprises of 324 plots out of which 166 plots are frozen and 158 plots are unfrozen. The application submitted by the promoter for the said project contains 158 unfrozen plots on which total of 632 units and 212 commercial units on are to be constructed. On scrutiny of the application, some of the major deficiencies/observations were observed which were conveyed to the promoter vide notice no. HARERA/GGM/RPIN/344 dated 02.07.2021. The promoter has submitted the reply dated 09.07.2021 and 12.07.2021 for the deficiencies after scrutiny of the reply following deficiencies are still pending: - 1.      Copy of approved service plans and estimates/sanction letter needs to be provided. 2.      Copy of approved environmental clearance needs to be provided. 3.      Copy of approved fire scheme approval/sanction letter for commercial area need to be provided. 4.      Copy of building plan (BR-III) of residential plots i.e., Type C79-80 and commercial area i.e., 0.824 acres needs to be provided. 5.      An undertaking from the company that 10% of the total receipt in Separate RERA compliant account has been credited to the Haryana Government treasury against the EDC dues until it is fully paid. The Authority decided to grant conditional registration certificate for the project with the following conditions mentioned above and directed the promoter to comply within three months from issuance of the registration certificate. The promoter is advised to submit detailed project information duly binded and also fill up online DPI information at hrera.in/app1/sign_up within 7 days.

  1. Registration granted GGM/463/195/2021/31
  2. Registration valid till

Land, licence & cost

Land area of the project15.502 acres
Total licensed area20.589 acres
LicenceEndst. No. LC-4242 4245/JE(SJ)/2020/5863 Dated 08/03/2021 Licens No. 08 of 2021 dated 05/03/2021
FAR permissible / proposed2.64 / 2.41
Estimated project cost₹ 434.66 Cr
Cost of land₹ 157.96 Cr
Cost of construction₹ 196.61 Cr
Infrastructure and other structures₹ 12.78 Cr
EDC, taxes, levies and other costs₹ 67.31 Cr

How the land will be used

UseAcresShare
Land Area To Be Used For Construction Of Apartments4.9832.1%
Construction Of Roads5.7136.8%
Green Belts1.6210.4%
Electricity Sub-Station0.1481%
Sewage And Solid Waste Treatment Facility0.1631.1%
Area To Be Left For Transferring To The Government For Community Services2.06113.3%
Area Under Commercial0.8245.3%

Apartments 632 units · 36 towers

TypeCarpet area (sq m)Carpet area (sq ft)Units
Apartment/Shops/Other Buildings327.883,52960
Apartment/Shops/Other Buildings327.883,52928
Apartment/Shops/Other Buildings286.363,082144
Apartment/Shops/Other Buildings286.363,082100
Apartment/Shops/Other Buildings286.363,08288
Apartment/Shops/Other Buildings286.363,08248
Apartment/Shops/Other Buildings203.522,19140
Apartment/Shops/Other Buildings203.522,19116
Apartment/Shops/Other Buildings203.522,191108

Areas are as filed with HRERA.

External services

ServiceProvided byApproval taken
RoadsNoWATER SUPPLY
GMDAYesELECTRICITY
DHBVNYesSEWAGE DISPOSAL
GMDAYesSTORM WATER DRAINAGE
NoSTPGMDA
Yes4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report:Sr. No.
Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS317.82
Submitted To Town & Country Planning2WATER SUPPLY SYSTEM
223.01SUBMITTED TO TOWN & COUNTRY PLANNING3
Storm Water Drainage97.26SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM0
Yet To Be Prepared5SEWAGE TREATMENT & GARBAGE DISPOSAL
194.03SUBMITTED TO TOWN & COUNTRY PLANNING6
Street Lighting31.60SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING0
Yet To Be Prepared8PLAYGROUNDS AND PARKS
0YET TO BE PREPARED9
Club House/Community Centre0YET TO BE PREPARED
10SHOPPING AREA0
Yet To Be Prepared11RENEWABLE ENERGY SYSTEM
0YET TO BE PREPARED12
School0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0
Yet To Be Prepared14ANY OTHER
0YET TO BE PREPARED15
Parking And Horticulture6.62SUBMITTED TO TOWN & COUNTRY PLANNING
16MAINTENANCE OF SERVICES407.69
Submitted To Town & Country Planning5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed.NA
(date)6. Date of approval of Building PlansNA
(date)7. New projects:i) Likely date of starting the construction work
01-07-2021ii) Likely date of completing the project30-09-2023
iii) Sizes of the plots to be offered in the projectSr. NoPlot Area(In Square Meter)
Number of plots in the project10
0Total0
iv. Type of apartments to be constructed in the project:TypeCarpet area(In Square Meter)
Number of apartmentsNumber of towersApartment/Shops/Other Buildings
327.886015
Apartment/Shops/Other Buildings327.8828
7Apartment/Shops/Other Buildings286.36
14436Apartment/Shops/Other Buildings
286.3610025
Apartment/Shops/Other Buildings286.3688
22Apartment/Shops/Other Buildings286.36
4812Apartment/Shops/Other Buildings
203.524010
Apartment/Shops/Other Buildings203.5216
4Apartment/Shops/Other Buildings203.52
10827(vi) Quarterly schedule of development of whole/remaining part of the project:
(c) Apartments/Shops/Other BuildingsExpenditure incurred till the date of application (In Lakhs)Particulars
ExpenditureApartments0
Shops0Plots
0External Development Charges451.76
Land Cost Expenditure2121.60Others Cost
72.10Expenditure to be made in each quarter (In Lakhs)Particulars
Year-2021Jan-MarApr-June
July-SepOct-DecApartments
1661.232000Shops
00Plots
00Infrastructure Development Charges
112.290Others Cost
338.77540.35Land Cost Expenditure
13951302Internal Development Works
112.29289.20External Development Charges
307.27ParticularsYear-2022
Jan-MarApr-JuneJuly-Sep
Oct-DecApartments2500
200020002000
Shops00
00Plots
000
0Infrastructure Development Charges0
00External Development Charges
293.72280.16Land Cost Expenditure
148816121612
1633.70Others Cost490.35
490.35490.35425.29
Internal Development Works323.30145.55
407.69ParticularsYear-2023
Jan-MarApr-JuneJuly-Sep
Oct-DecApartments2000
200035000
Shops00
00Plots
000
0External Development Charges266.61
253.06Others Cost410.23
395.18330.1215.06
Land Cost Expenditure15811600.86
954.24248.0Particulars
Year-2024Jan-MarApr-June
July-SepOct-DecApartments
00Shops
00Plots
00External Development Charges
239.51Land Cost Expenditure248.0
(d) InfrastructureExpenditure incurred till the date of application (In Lakhs)Particulars
ExpenditureRoads & Pavements0
Water Supply System0Sewerage treatment & garbage disposal
0Electricity Supply System0
Storm Water Drainage0Parks and Playgrounds
0Clubhouse/community centres0
Shopping area0Other
0Expenditure to be made in each quarter (In Lakhs)Particulars
Year-2021Jan-MarApr-June
July-SepOct-DecRoads & Pavements
38.49100.56Water Supply System
27.0170.56Sewerage treatment & garbage disposal
23.5061.39Electricity Supply System
00Storm Water Drainage
16.7240.70Parks and Playgrounds
00Clubhouse/community centres
00Shopping area
00Other
00Parking Horticulture
1.142.77Street Light
5.4313.22Particulars
Year-2022Jan-MarApr-June
July-SepOct-DecRoads & Pavements
117.9460.83Water Supply System
82.7642.69Sewerage treatment & garbage disposal
7237.14Electricity Supply System
00Storm Water Drainage
36.333.51Parks and Playgrounds
00Clubhouse/community centres
00Shopping area
00Other
00Parking Horticulture
2.470.24Street Light
11.801.14It is hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - DAccounts related information:
1. Annex copy of the balance sheet of last 3 yearsYes2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.
Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No3. Bank account to which the deposits received from apartment buyers will be credited
Bank and Branch addressINDUSIND BANK LIMITED, DR. GOPAL DAS BHAWAN, 28 BARAKHMABA ROAD, NEW DELHI-110001Bank Account number
250025003701IFSC codeINDB0000005
MICR code110234002Branch code
0000054. Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Lalit Kumar Aggarwal and Pradeep Kumar Aggarwal R/o. House No. 34, Road No.61, West Punjabi Bagh Delhi 110026
5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Attached as AnnexureI hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - E
Details of the statutory approvals:1. Annex copies of the following in Folder E:i. Lay out Plan
Yesii. Demarcation PlanYes
iii. Zoning PlanYesiv. Building Plan
YesSite PlanNo
Floor PlanYesApartment Plans
YesElevation SectionYes
Detail of Permissible FARYesDetail of covered area achieved FAR
No2. Annex copies of the following in Folder E:I. ROADS AND PAVEMENT PLAN
YesII. ELECTRICITY SUPPLY PLANNo
III. Water Supply PlanYesIV. SEWERAGE AND GARBAGE DISPOSAL PLAN
YesV. STROM WATER DRAINAGEYes
Vi. 10% Land To Be Transferred To The Govt. For Community FacilityYesVII. STREET LIGHTING PLAN
NoVIII. PARKING PLANNo
3. Statutory Approvals StatusStatutory ApprovalsStatutory Approvals Status
DateI. LICENSE 08 OF 2021ALREADY BEEN OBTAINED
05-03-2021II. LAYOUT PLAN MEMO NO. DTCPALREADY BEEN OBTAINED
05-03-2021III. WATER SUPPLY GMDA/SEW/2021/194ALREADY BEEN OBTAINED
08-04-2021IV. SEWAGE DISPOSAL GMDA/SEW/2021/381ALREADY BEEN OBTAINED
24-03-2021V. STP TREATED WATER GMDA/SEW/2021/387ALREADY BEEN OBTAINED
24-03-2021VI. ELECTRICAL LOAD AVAILABILITY CH.131/DRG-PLCALREADY BEEN OBTAINED
31-03-2021VII. FOREST NOC R6U-3PQ-RHQHALREADY BEEN OBTAINED
22-09-2020VIII. ZONING PLAN DRG.NO- DTCP7782ALREADY BEEN OBTAINED
02-06-2021IX. ZONING PLAN COMMERCIAL DRG.NO-DTCP7783ALREADY BEEN OBTAINED
02-06-2021It is undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees.Signature _____________
Seal _____________Date _____________FORM REP-I
Part - F1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.(Annex a copy in Folder F)
Yes2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)(Annex a copy in Folder F)
Yes3. Gist of the important provisions of the Draft Agreement(Annex a copy in Folder F)
YesI hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised RepresentativeStamp _____________Date _____________
Form Rep-IPart - GProjects launched by the promoter in last five years: (No Projects)
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________FORM REP-IPart - H
Specification Of ConstructionSpecification of apartments and other buildings including the following:1
Flooring Details Of Various Parts Of HouseVITRIFIED & CERAMIC TILES2
Wall Finishing DetailsOBD3
Kitchen DetailsISI MARKED4
Bathroom FittingsISI MARKED5
Wood Work EtcHARD WOOD6
Doors And Windos FramesWOODEN(DOOR FRAME), ALUMINIUMN/UPVC(WINDOW FRAME)7
Glass WorkISI MARKED8
Electric FittingsISI MARKED9
Conducting And Wiring DetailsISI MARKED10
Cupboard DetailsNA11
Water StorageRCC/PVC12
Lift DetailsISI MARKED13
External GlazingsNA13.1
Windows/GlazingsALUMINIUMN/UPVC14
DoorsFLUSH DOOR14.1
Main DoorsFLUSH DOOR14.2
Internal DoorsFLUSH DOOR15
Air ConditioningNA16
Electrical FittingsISI MARKED17
Cng Pipe LineNA18
Provision Of Wifi And Broadband FacilityNA19
External Finishing/Colour SchemeTEXTURE PAINT20
Internal FinishingNASPECIFICATION UNIT WISE
1 . Living/Dining/Foyer/Family Lounge1 . 1FLOOR
Vitrified Tile1 . 2WALLS
Obd1 . 3CEILING
Obd2 . MASTER BEDROOM/DRESSROOM2 . 1
FloorVITRIFIED TILE2 . 2
WallsOBD2 . 3
CeilingOBD2 . 4
Modular WardrobesNA3 . MASTER TOILET
3 . 1FLOORCERAMIC TILE(ANTI-SKID)
3 . 2WALLSCERAMIC TILE
3 . 3CEILINGGRID CEILING
3 . 4COUNTERSNA
3 . 5SANITARY WARE/CP FITTINGSISI MARKED
3 . 6FITTING/FIXTURESISI MARKED
4 . Bed Rooms4 . 1FLOOR
Vitrified Tile4 . 2WALLS
Obd4 . 3CEILING
Obd4 . 4WARDROBES
Na5 . TOILET5 . 1
FloorVITRIFIED TILE5 . 2
WallsOBD5 . 3
CeilingOBD5 . 4
CountersNA5 . 5
Sanitary Ware/Cp FittingsISI MARKED5 . 6
FixturesISI MARKED6 . KITCHEN
6 . 1FLOORVITRIFIED TILE
6 . 2WALLSOBD
6 . 3CEILINGOBD
6 . 4COUNTERSGRANITE
6 . 5FIXTURESISI MARKED
6 . 6KITCHEN APPLIANCESNA
7 . Utility Rooms/Utility Balcony/Toilet7 . 1FLOOR
Na7 . 2WALLS & CEILING
Na7 . 3TOILET
Na7 . 4BALCONY
Na8 . SIT-OUTS8 . 1
FloorNA8 . 2
Walls & CeilingNA8 . 3
RailingsNA8 . 4
FixturesNAI hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________List of Uploaded DocumentsSr. No.
Document DescriptionDate of Document UploadView Document
1COPY OF LICENSE ALONG WITH SCHEDULE OF LAND13-06-2021
View Document2SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN
13-06-2021View Document3
Documents Relating To The Entry Of License And Collaboration Agreement In The Revenue Record13-06-2021View Document
4IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN13-06-2021
View Document5DEMARCATION PLAN
13-06-2021View Document6
Zoning Plan13-06-2021View Document
7NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT13-06-2021
View Document8ARAVALI
13-06-2021View Document9
Br For Rera Accounts13-06-2021View Document
10FOREST NOC13-06-2021
View Document11LOI
13-06-2021View Document12
Power Assurance13-06-2021View Document
13WATER ASSURANCE13-06-2021
View Document14SEWERAGE ASSURANCE
13-06-2021View Document15
Stp13-06-2021View Document
16SERVICE ESTIMATES APPLIED RECEIVING13-06-2021
View Document17LC IV
13-06-2021View Document18
Commercial Zoning13-06-2021View Document
19DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.17-06-2021
View Document20IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN
17-06-2021View DocumentI hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised RepresentativeStamp _____________
Date _____________Documents Uploaded After RegistrationSr. No.
Document DescriptionDate of Document UploadView Document
1Extension No. 28 of 2023 dated 04.12.202309-01-2024
View Document2PROJECT CONTINUATION- RC/REP/HARERA/GGM/31 of 2021/7(3)/69/2025/11 DATED 06.05.2025
13-05-2025View Document3
OC uploaded24-09-2026View Document
I hereby declare that the above information and particulars are based on record and are true to thebest of my knowledge and belief and nothing has been concealed.Signature of the Applicant / Authorised Representative
Stamp _____________Date _____________Print

Facilities in the service plan

FacilityEstimated costStatus
Internal Roads And Pavements₹ 3.18 CrSubmitted To Town & Country Planning
Water Supply System₹ 2.23 CrSubmitted To Town & Country Planning
Storm Water Drainage₹ 97.26 lakhSubmitted To Town & Country Planning
Sewage Treatment & Garbage Disposal₹ 1.94 CrSubmitted To Town & Country Planning
Street Lighting₹ 31.6 lakhSubmitted To Town & Country Planning
Parking And Horticulture₹ 6.62 lakhSubmitted To Town & Country Planning
Maintenance Of Services₹ 4.08 CrSubmitted To Town & Country Planning

Statutory approvals

ApprovalStatusDate
License 08 Of 2021Already Been Obtained5 Mar 2021
Layout Plan Memo No. DtcpAlready Been Obtained5 Mar 2021
Water Supply GMDA/Sew/2021/194Already Been Obtained8 Apr 2021
Sewage Disposal GMDA/Sew/2021/381Already Been Obtained24 Mar 2021
Stp Treated Water GMDA/Sew/2021/387Already Been Obtained24 Mar 2021
Electrical Load Availability CH.131/Drg-PlcAlready Been Obtained31 Mar 2021
Forest Noc R6U-3PQ-RhqhAlready Been Obtained22 Sep 2020
Zoning Plan Drg.no- DTCP7782Already Been Obtained2 Jun 2021
Zoning Plan Commercial Drg.no-DTCP7783Already Been Obtained2 Jun 2021

Specifications (as filed)

Flooring Details Of Various Parts Of HouseVitrified & Ceramic Tiles
Wall Finishing DetailsObd
Kitchen DetailsIsi Marked
Bathroom FittingsIsi Marked
Wood Work EtcHard Wood
Doors And Windos FramesWooden(Door Frame), Aluminiumn/Upvc(Window Frame)
Glass WorkIsi Marked
Electric FittingsIsi Marked
Conducting And Wiring DetailsIsi Marked
Water StorageRcc/Pvc
Lift DetailsIsi Marked
Windows/GlazingsAluminiumn/Upvc
DoorsFlush Door
Main DoorsFlush Door
Internal DoorsFlush Door
Electrical FittingsIsi Marked
External Finishing/Colour SchemeTexture Paint

Source: HRERA Gurugram, Form REP-I, read on 23 Oct 2026. Figures are as filed by the promoter with HRERA. Always check the latest record on haryanarera.gov.in before you pay any money.

Kamal JaiswalAnkush DwivediNitish MahatoNaveen Kumar
Speak to an advisor

Questions about Signature Global City 37D - 1?

An advisor can check this project’s RERA record, approvals and possession timeline with you, and share current prices and availability. No obligation.

+91 9953537030WhatsApp
Need a shortlist? Answer 4 quick questions and see matching projects.